Short Presentation of the Republic of Korea Funds-in-Trust for Preservation of the Koguryo Tombs and mural paintings in the DPRK Junhi HAN UNESCO/World.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water Review of relevant documents to the WMO capacity development activities.
Advertisements

Understanding Capacity Building Assistance
Learning Enhances Awareness LEA – IJMA Learning Enhances Awareness LEA 2008.
UNDP/Spain MDG Achievement Fund The Dahshur World Heritage Site Mobilization of Cultural Heritage for Community Development.
SPRECOMAH 2008 PLANNED CONSERVATION IN MONZA AND BRIANZA CULTURAL DISTRICT 24th – 25th MARCH LEUVEN – ROSSELLA MOIOLI PLANNED CONSERVATION AS A STRATEGIC.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department USST Programme Phase I.
The ISO 9002 Quality Assurance Management System
ROBBEN ISLAND MUSEUM & WORLD HERITAGE SITE
Enhancing Institutional and Administrative Capacity case: POLAND
ICT and Education Indicators S
Quality Improvement Prepeared By Dr: Manal Moussa.
IT CAREERS Prepared by: Careene McCallum-Rodney. Computer Technician  Computer technicians:  install,  repair,  maintain,  and analyze many different.
‘Approaches to programme planning and budgeting’ Experience of Regional Centre for the Safeguarding of Intangible Cultural Heritage in South-Eastern Europe.
International Non-governmental Organizations: ICOMOS ICCROM ARCH 530 Assist. Prof. Dr. Ozlem Olgac Turker Presented by: Taraneh noorian.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Preserving a host of archaeological collections. Encompassing a wide range of collections from worldwide civilization.
The Athens Charter for the Restoration of Historic Monuments
Developing a result-oriented Operational Plan Training
UNIVERSITY OF DAR ES SALAAM, TANZANIA ACTIVITIES ON INTERNATIONAL RELATIONS: EXPERIENCE AND CHALLENGES By. H.R.T. Muzale and R. Toba.
After studying this lesson successfully, you should be able to  Define what T& D means  Differentiate between Training & Education and Training & Development.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
1 CORAT AFRICA MANAGEMENT WORKSHOP FOR IMBISA/AMECEA COMMUNICATION COORDINATORS, MAPUTO, MOZAMBIQUE.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Regional Training/Consultations on Capacity Development for Sustainable Growth and Human Development in Europe and CIS Application of Capacity Development.
20081 E-learning Lecture-10: EVALUATING THE IMPACTS OF E-LEARNING week 12- Semester-4/ 2009 Dr. Anwar Mousa University of Palestine Faculty of Information.
Analysis of the Impact and Effectiveness of Projects Structural Funds Programme for Malta Presentation of main findings and recommendations Evaluation.
Conservation Planning Friday 9 March Introductions Find out about the person next to you: their name reasons for attending the workshop place of.
SEA in the Czech Republic Prague, 24 September 2008.
ENCHASE “ENHANCING ALBANIAN SYSTEM OF QUALITY ASSURANCE IN HIGHER EDUCATION: APPLICATION OF THE PROCESS AND OUTCOME BASED METHODOLOGY ”
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
SACS/CASI District Accreditation  January 2007  April 2007  May 2007  January – April 2008  Board Approval for Pursuit of District Accreditation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
History, Culture and Education —— Enlightenment gained from —— Enlightenment gained from 2009 International Training Programme Programme Zhao Jing Cairo,March.
What is project management?
Intelligent Traffic Environmental System (ITES-AIR)
MAKING CENSUSES IN AFRICA COST EFFECTIVE SUGGESTIONS FOR REFLECTION.
ACTED AME Appraisal, Monitoring and Evaluation. Summary 1/ ACTED AME department 2/ AME Responsibilities 3/ AME throughout project cycle 4/ Involvement.
ORGANIZATION CAPACITY ASSESSMENT (2013) Produced in April 2013.
The AUC TVET Strategy for Youth Employme nt Windhoek, April 2014 Prudence Ngwenya Department for Human Resources Science & Technology.
Office of School Turnaround Center for Accountability and Improvement, Ohio Department of Education 25 South Front Street, Columbus, Ohio
RCUK International Funding Name Job title Research Councils UK.
SUSTCULT PROJECT SUSTCULT PROJECT SEE PROGRAMME. SUSTCULT Main Data SUSTCULT: Achieving SUSTainability through an integrated approach to the management.
Main conclusions of the previous Meetings on World Heritage Periodic Reporting Reflection Meeting of the Periodic Reporting Reflection Year UNESCO Headquarters,
Progress Report and Future Strategy Paris, UNESCO 22 January 2003 Periodic Reporting Europe and North America.
1 Institutional Quality and Accreditation: A Workshop on the Basics.
Quality Assurance in Egypt and the European Standards and Guidelines
Radiopharmaceutical Production
NEW DEVELOPMENTS IN THE STATE AUDIT OFFICE OF THE REPUBLIC OF LATVIA
Strengthening national capacities for safeguarding intangible cultural heritage: UNESCO’s strategy for and beyond Cécile Duvelle and Frank.
Gap Analysis Continuing the development of the strategy
C” ”the 2nd Discussion platform 2.
SEPA AND EEA, FIVE YEARS OF COOPERATION
Roadmap to Enhanced Technical Regulations of WMO
EU Reference Centres for Animal Welfare
FINAL RECOMMENDATIONS
Benha University Strategic Plan 2017 – 2022
Benha University Strategic Plan 2017 – 2022
Education and Training in the Area of Safety Assessment Irina Sanda
United Nations Voluntary Fund on Disability (UNVFD)
Building Statistical Capacity UNSD perspective
Title I, Part A Virginia Department of Education
System Analysis and Design:
Radiopharmaceutical Production
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
International Standards and Contemporary Technologies,
Presentation transcript:

Short Presentation of the Republic of Korea Funds-in-Trust for Preservation of the Koguryo Tombs and mural paintings in the DPRK Junhi HAN UNESCO/World Heritage Centre

Content Description of the Project Objectives of the Project UNESCO’s strategy for strengthening national capacity for the conservation of the Koguryo tombs and paintings, as one of the current UNESCO project’s long term objectives Scope of the future project and its objectives

The First ROK/UNESCO FIT project in 2000 (U$100,000)for the Yaksuri tomb: mainly equipment provision project, however, thanks to a fact-finding mission sent to the Site, accurate information about the state of mural painting, as well as the assessment of national capacity both at the human resources level and the infrastructure level were obtained. This served as a basis for UNESCO to establish future strategy designed exactly according to the crucial and immediate needs of the DPRK in the field of conservation and management of their cultural heritage sites including World Heritage Sites.

IV. DPRK authorities’ conservation efforts before UNESCO intervention : The DPRK has been completely isolated from outside world, as such they have also been isolated by the latest conservation currents:  Efforts, aimed at conserving the koguryo tombs and mural paintings, carried out without systematic and specific study, research of the tombs and mural paintings  Well qualified specialists, but using outdated research methods and unsuitable equipment, which can alter result in the preservation action

III. Request made by the DPRk Authorities Training of the staffs of the KCPC (Korean Cultural Properties Preservation Centre) Infrastructure necessary for the conservation of the Kogruyo tombs and mural painting

UNESCO project proposal  Project title : Establishment of the strategies for the sustainable conservation and management of Koguryo tombs and their mural paintings  Donor : Cultural Heritage Administration (here after CHA) in Republic of Korea OK  Budgets : 500,088 US$  Duration : 4 years ( 2003 – 2006)

V. Second ROK/UNESCO FIT for the preservation of the Koguryo tombs and mural paintings for US$ 500,088 ( )  UNESCO developed a project proposal aiming : to assist the DPRK authorities in effectively safeguarding and preserving the outstanding Koguryo cultural heritage; to ensure the mot important issue, i.e. sustainable conservation and management of the Koguryo tombs and mural paintings through enhancement of national capacity in human resources and infrastructure.

V-2. UNESCO/CH’s 4 years mid-term conservation project proposal  Main Activities : 1.Organize the training workshop on the conservation of mural paintings (4years- programmed the intensive trainings) 2.Conserve the Yaksuri Tomb 3.Provide assistance equipments for a laboratory and a library 4.Organize of international workshop

 To introduce, an appropriate conservation methodology by carrying out systematic, scientific data collection, and study on each tomb to be preserved.  To update and upgrade conservation techniques, philosophy and use of compatible materials especially for the preservation of mural paintings in order to extend to other monuments and objects in museums in the DPRK.  To focus on the scientific study based on the ancient technique of execution as well as the material used for the mural paintings.  To put together a multidisciplinary team able to deal with daily maintenance and conservation of these tombs and mural paintings V-3 UNESCO’s strategy to achieve through the implementation of the second ROK/UNESCO FIT

Result of the Project a basic national capacity in conservation has been built and a multi-disciplinary team established Basic conservation and scientific laboratory have been installed Basic monitoring system for the tombs have been established

Phase III UENSCO/ROK FIT for Koguryo tombs Budget: US$ 1,000, 312 Period: Objectives: Continuing reinforcement of national capacity through on-site job training and fellowship programmes provided to the selected national experts

Objectives: Safeguarding the Koguryo Tombs and mural paintings (two selected tombs) Continuing reinforcement of national capacity through on- site job training and fellowship programmes provided to the selected national experts Establishment a comprehensive management plan including tourism management Continuing research including technique of execution of the mural paintings and provide more visibility of the project through various publication (ex: publication of a documentation of Susanri-Tomb, the first tomb to be preserved within the project)

Mission pictures

First training workshop in the DPRK

Thank you for your attention Junhi HAN UNESCO/ Cultural Heritage Division