Summary WG1 parameters Eugene Levichev, Frank Zimmermann HF2014, 12 October 2014.

Slides:



Advertisements
Similar presentations
Introducing LEP3 zero M. Koratzinos TLEP3 day, 9 January2013.
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Recent Electroweak Results from the Tevatron Weak Interactions and Neutrinos Workshop Delphi, Greece, 6-11 June, 2005 Dhiman Chakraborty Northern Illinois.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
The strategy of Accelerator based High Energy Physics of China J. Gao On behalf of CEPC+SppC Group IHEP, CAS, China Roundtable discussion: “Future machines“
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Beamstrahlung and energy acceptance K. Ohmi (KEK) HF2014, Beijing Oct 9-12, 2014 Thanks to Y. Zhang and D. Shatilov.
08/06/ FCC-ee with kinks Can we conserve polarized beams?
Qingjin XU Institute of High Energy Physics (IHEP)
Z AND W PHYSICS AT CEPC Haijun Yang, Hengne Li, Qiang Li, Jun Guo, Manqi Ruan, Yusheng Wu, Zhijun Liang 1.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Alain Blondel TLEP -6 Polarization TLEP Beam Polarization and Energy Calibration Jowett Wenninger Wienands Assmann Koutchouk Placidi Buon Keil.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Beam-beam limit vs. number of IP's and energy K. Ohmi (KEK-ACCL) HF2014, Beijing Oct 9-12, 2014 Thanks to Y. Funakoshi.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Lattice design for CEPC main ring H. Geng, G. Xu, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, Y. Zhang, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai, Q. Qin,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Transverse polarization for energy calibration at Z-peak M. Koratzinos With valuable input from Alain Blondel ICFA HF2014, Sunday, 12/10/2014.
Polarization Study for CEPC DUAN, Zhe (IHEP) Apr 14th, 2016 Acknowledgements: M. Bai, D. P. Barber, and E. Forest. FCC Week 2016, April 11-15, Rome.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
Choice of circumference, minimum & maximum energy, number of collision points, and target luminosity M. Koratzinos ICFA HF2014, Thursday, 9/10/2014.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
1 FCC-ee as Higgs Factory Jörg Wenninger CERN Beams Department Operation group - LHC 23/07/2014 Future Circular Collider Study Acknowledgments to my FCC-ee.
Cost Consideration and Possible Construction Timeline Weiren Chou Fermilab ICFA HF2014 Workshop October 9-12, 2014, Beijing, China 1.
Note presentation: Performance limitations of circular colliders: head-on collisions M. Koratzinos TLEP ACC meeting no. 8, 25/8/2014.
News from the interaction region study Bernhard Holzer, Anton Bogomyagkov, Bastian Harer, Rogelio Tomas Garcia, Roman Martin, Luis Eduardo Medina Presented.
CEPC parameter choice and partial double ring design
Electroweak Physics Towards the CDR
Electroweak physics at CEPC
Overview of Beam-Beam Effects at FCC-ee
Electroweak Physics Towards the CDR
Design study of CEPC Alternating Magnetic Field Booster
CEPC parameter optimization and lattice design
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
The 13th Symposium on Accelerator Physics
Discussion on Emittance Evolution through FCC-e+e-
Luminosity Optimization for FCC-ee: recent results
PHYSICS MOTIVATIONS AND REQUIREMENTS
Status of CEPC lattice design
PHYSICS MOTIVATIONS AND REQUIREMENTS
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
BINP Tau-Charm Project
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The design of interaction region
CEPC partial double ring scheme and crab-waist parameters
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Comparison of the final focus design
Eugene Levichev, Frank Zimmermann HF2014, 12 October 2014
Beam-Beam Effects in the CEPC
Parameter Optimization in Higgs Factories Beam intensity, beam-beam parameters, by*, bunch length, number of bunches, bunch charge and emittance.
Beam-Beam Effects in High-Energy Colliders:
CEPC SRF Parameters (100 km Main Ring)
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
100th FCC-ee Optics Design Meeting
Presentation transcript:

Summary WG1 parameters Eugene Levichev, Frank Zimmermann HF2014, 12 October 2014

WP1 parameters 1)Physics motivation and requirements, Alain Blondel (U. Geneva) 2)Choice of circumference, minimum & maxim energy, number of collision points, and target luminosity, Michael Koratzinos (U. Geneva) 3)Ring circumference and two rings vs one ring, Richard Talman (Cornell U.) 4)Beam-beam effects in high-energy colliders: crab waist vs. head- on, Dmitry Shatilov (BINP) 5)Optimizing beam intensity, number of bunches, bunch charge, and emittance, Chuang Zhang (IHEP) 6)Polarization issues in FCC-ee collider, Eliana Gianfelice (FNAL) 7)Constraints on the FCC-ee lattice from the compatibility with the FCC hadron collider, Bastian Haerer (CERN) 8)Polarization issues and schemes for energy calibration, Ivan Koop, 9)Optimizing costs of construction and operation, possible construction time line, Weiren Chou (FNAL)

precision of luminosity measurement needs to be improved; systematic errors likely to dominate; need for small-angle measurement to be revisited duration of e + e - run ~20 years, including physics staging polarization more difficult for smaller machine mono-chromatization: factor 10 smaller collisions energy spread for ten times lower luminosity? physics requirements – Alain Blondel

A Sample of Essential Quantities: X Physics Present precision TLEP stat Syst Precision TLEP keyChallenge M Z MeV/c2 Input  2.1 Z Line shape scan MeV <  0.1 MeV E_calQED corrections  Z MeV/c2  (T) (no  !)  2.3 Z Line shape scan MeV <  0.1 MeV E_calQED corrections RlRl  s,  b  Z Peak  StatisticsQED corrections N Unitarity of PMNS, sterile ’s  Z Peak Z+  (161 GeV)  >lumi meast Statistics QED corrections to Bhabha scat. RbRb bb  Z Peak  Statistics, small IP Hemisphere correlations A LR ,  3,  (T, S )  Z peak, polarized  bunch scheme Design experiment M W MeV/c2 ,  3,  2,  (T, S, U) ± 15 Threshold (161 GeV) 0.3 MeV <1 MeV E_cal & Statistics QED corections m top MeV/c2 Input ± 900 Threshold scan 10 MeVE_cal & Statistics Theory limit at 100 MeV? Alain Blondel

Alain Blondel TLEP design study r-ECFA A possible TLEP running programme (07/2013) to be updated including power/energy staging 1. ZH threshold scan and 240 GeV running (200 GeV to 250 GeV) 5+ 10^35 /cm2/s => 210^6 ZH events ++ returns at Z peak with TLEP-H configuration for detector and beam energy calibration 2. Top threshold scan and (350) GeV running 5+ 10^35 /cm2/s  10^6 ttbar pairs ++Zpeak Z peak scan and peak running, TLEP-Z configuration  Z decays  transverse polarization of ‘single’ bunches for precise E_beam calibration 2 years 4. WW threshold scan for W mass measurement and W pair studies 1-2 years  10^8 W pairs ++Zpeak 5. Polarized beams (spin rotators) at Z peak 1 year at BBTS=0.01/IP => Z decays. Higgs boson HZ studies + WW, ZZ etc.. Top quark mass Hvv Higgs boson studies Mz,  Z R b etc… Precision tests and rare decays M W, and W properties etc… A LR, A FB pol etc Alain Blondel

choice of circumference, minimum & maximum energy, number of collision points, and target luminosity optimized parameters for CepC: o 80% higher luminosity at ZH appears possible o 70 km: 20% more luminosity than 53 km o 4 IPs: 53% more luminosity than 2 IPs o at 45 GeV: 4x34 cm -2 s -1 at 10 MW (160 bunches) o at 175 GeV factor 5 less luminosity than FCC-ee optimized parameters – Mike Koratzinos

Comparison with simulation There exist two analytical calculations (By Valery Telnov and Anton Bogomyagkov) and (at least) a thorough simulation by K. Ohmi 7 Agreement at momentum acceptances of 1.5%-2% is reasonable – within a factor of 5 Mike Koratzinos

CEPC – the two limitations The current CEPC design is conservative – vertical emittance is a factor of 10 larger than FCC-ee 8 Current CEPC design on left; extrapolating from FCC-ee anticipated xi_y on right. In both cases, 120GeV running is limited by beam-beam A point of caution: the CEPC design I am using has different xi_x and xi_y values Mike Koratzinos

one ring better than two!? (controversial) optimized design reaches all limits – power, beam-beam and beamstrahlung – at the same time maximize circumference! - larger radius possible in China 1 vs 2 rings – Richard Talman

Richard Talman

TLEP-Z: head-on collision → strong bunch lengthening, blow and long tails, weak damping crab waist solves the problem o crossing angle changed to 30 mrad o luminosity for TLEP-Z can be further increased if emittance can be reduced below 1 pm conclusions: at Z, W: energy acceptance can be reduced H, t:  y * can be increased head on vs crab waist – Dmitry Shatilov

 z =  y  z = 2  y  z = 3  y Impact of Bunch Lengthening FMA footprints in the plane of betatron tunes, synchrotron amplitude: A s = 1 sigma. Parameters as for TLEP Z from FCC-ACC-SPS-0004,  x ≈  y ≈ 0.03 (nominal). Dmitry Shatilov

Luminosity at Low Energies (Z, W) EnergyTLEP ZTLEP W Collision schemeHead-onCrab WaistHead-onCrab Waist Np [10 11 ]  [mrad] 0 ?30 0 ?30  z (SR / total) [mm] 1.64 / / / / 11.6  x [nm]  y [pm]  x /  y [nominal] 0.03 / / / / 0.20 L [10 34 cm -2 s -1 ] Head-on: parameters taken from FCC-ACC-SPS-0004 Crab Waist scheme requires low emittances. This can be achieved by keeping the same lattice as for high energies (i.e.  x ~  2 ). The numbers obtained in simulations (by Lifetrac code) are shown in blue. For TLEP Z  y can be raised up to 0.2. If we try to achieve this by 50% increase of N p, additional bunch lengthening will occur due to beamstrahlung, so  y increases by 15% only. Decrease of  y would be more efficient, since for flat bunches beamstrahlung does not depend on the vertical beam size. One of the main limitations: very small vertical emittance is required. Is it possible to achieve  y < 1 pm? The energy acceptance can be decreased from 2% to 1% (for Z) and 1.7% (for W). Dmitry Shatilov

Luminosity at High Energies (H, tt) EnergyTLEP HTLEP tt Collision schemeHead-onCrab WaistHead-onCrab Waist Np [10 11 ]  [mrad] 0 ?30 0 ?30  z (SR / total) [mm] 0.81 / / / / 6.78  x [nm]  y [pm]  x /  y [nominal] / / / / 0.07  bs [min] > L [10 34 cm -2 s -1 ] ?1.3 Bending radius at IP: L – interaction length (for crab waist – overlapping area) To keep acceptable  bs, we need to make L larger than  y (for tt – by a factor of ~2) Again, very small vertical emittance is of crucial importance.  y can be raised by decreasing  y, but it requires the betatron coupling of ~0.1%. Is it possible? In general, head-on and crab waist provide similar luminosity at high energies. Since L >  y and  y is below the limit, we can increase  y and luminosity will drop more slowly than 1 /. E.g. increase of  y to 1.5 (2) mm lowers the luminosity by 2.5% (7.5%) for TLEP H, and by 1.5% (5%) for TLEP tt. Dmitry Shatilov

parameter optimization for CepC margin in  y and luminosity? large hourglass means large actual  y - how about FCC-Z? design optimization – Chuang Zhang

17  k b  I b L zz yy y*y* BS , R Cost  x0 DA yy EE P rf Beam lifetime Chuang Zhang

18 Beam-beam parameter CEPC FCC-Z FCC-H FCC-tt FCC-W N IP =4 N IP =2 (N IP =4) * Data taken from FCC-ACC-SPC-0003 Chuang Zhang

19  y * and bunch length  z  y * and bunch length  z  z =2.65mm  y * =1.2mm H g =0.68 CEPC FCC-H FCC-Z FCC-W, tt  z =1.49mm  y * =1 mm H g =0.78  z =1.17 mm  y * =1 mm H g =0.83  z =2.56 mm  y * =1 mm H g =0.64 Chuang Zhang

toy ring to reduce polarization time at the Z pole: add polarization wigglers (e.g. LEP wiggler by Blondel-Jowett) installed in dispersion-free sections & maintain energy spread below critical value (0.6 T field) first SITROS result, w/o wigglers & w/o corrections old prediction: polarization at high energy may be enhanced/preserved by higher Q s polarization – Eliana Gianfelice

Eliana Gianfelice

constraints from hadrons - Bastian Haerer FCC-hh injection, beam dump, collimation and experiments define length of the straight sections geology and FCC-hh transfer lines define location of FCC length of IR(s) choice of l* for protons?

Location relative to LHC Required distance L for transfer lines depends on: Difference in depth d Magnet technology Courtesy: W. Bartmann LHC FCC d L Beam energy Max. slope of tunnel 5% FCC and LHC should overlap, if LHC is used as injector Bastian Haerer

FCC Interaction Region β y * = 1 mm, L* = 2 m !!! Large crossing angle  30 mrad, 11 mrad IR for leptons longer than for hadrons? Local chromaticity correction scheme Bastian Haerer FCC-hh FCC-ee #1 FCC-ee #2

proposed scheme: use polarized e - source, measure energy on every injection shot, for e + self polarization in 1-2 GeV intermediate ring several snakes in booster ring inject into collider with horizontal polarization vector measure modulation from Compton polarimetry over first 10,000 turns ; 1e-6 accuracy resonance strength must be known for getting correct beam energy (spin harmonic matching; measuring several points) other Compton based energy measurements above 100 GeV: 1e-4 precision effect of beamstrahlung on polarization? polarization&energy calibration – Ivan Koop

Ivan Koop

cost optimization and construction time line tunnel diameter 6.5 m RF frequency choice 1.3 GHz (booster), 650 MHz (collider) 58 IHEP cryomodules for XFEL dig & blast cheaper than TBM, 20-30% cheaper CPD klystron in Japan: 70-80% efficiency cost estimate, currency difference CHF/US$? electronics in the tunnel ? beam pipe: baseline copper, -cheaper than Al with Pb cladding cost & planning – Weiren Chou

本阶段在秦皇岛抚宁县场址布置了 2 个钻孔,进尺共 200m 。 ZK1 布置于 线路东南部洋河南岸,了解工程区覆盖层可能的最大深度; ZK2 布置于刘各 庄西侧,了解残坡积厚度,深变质岩风化带分带特征。 钻孔情况 Weiren Chou

CEPC Relative Cost Estimate 26% 19% 12% 10% 4% 2% 2.4% Weiren Chou

CEPC Relative Power Consumption 9% 16% 5% 10% 6% 48% 2% 3% Weiren Chou

CEPC-SppC Project Timeline (dream) R&D Engineering Design ( ) Construction ( ) Data taking ( ) Pre-studies ( ) 1 st Milestone: pre-CDR (by the end of 2014) → R&D funding request to Chinese government in 2015 (China’s 13 th Five-Year Plan ) CEPC R&D ( ) Engineering Design ( ) Construction ( ) Data taking ( ) SppC Weiren Chou