Downtown Village Streetscape Improvements Zionsville Merchants’ Association January 7, 2009.

Slides:



Advertisements
Similar presentations
Mississippi Chapter – American Society of Landscape Architects 2006 Awards Program Walnut Square and Walnut Circle Public Design Project Name: Project.
Advertisements

Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
Block 11 Redevelopment Phase I: Varsity Pub Expansion February 11, 2014.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Downtown Revitalization Along Lafayette and Diamond Bridge Avenues Borough of Hawthorne October 15, 2014 Borough Engineer: Stephen T. Boswell, Ph.D., P.E.,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
6 th Street Water Main And Street Reconstruction 2013.
J.R. Smith Elementary School How to arrive and leave safely.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Workshop #1 Sponsored by Department of Public Works South of Market Alleyway Improvement Project.
STREETSCAPE DESIGN REPORT: SOUTH HOLGATE STREET TO SOUTH KING STREET | ROMA DESIGN GROUP Project Update Seattle Design Commission April 3, 2008.
Nicholasville Downtown Master Plan City of Nicholasville Jessamine County Fiscal Court April 29, 2008.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
City of Waynesboro Entrance Corridor Design Guidelines.
Goals Development Goals for Aspen Falls Presented by Donald Norris, City Engineer.
Partnership: Downtown Development and Brownfield Continued Growth & Prosperity in Traverse City’s Downtown Area.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
DEED Redevelopment Grant Application July 24, 2012.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
HFVOA Sidewalk Project Status Update July Scope of the Project  Sidewalks cracking and lifting due to trees roots  Cornell Rd, North Side between.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Slide 1 of 3 Important Notice... On Thu Oct 1 st & Fri Oct 2 nd streets in the East Side of the complex will be done. On Thu Oct 1 st & Fri Oct.
ZHA Zimmerman / Volk Associates, Inc. Martin / Alexiou / Bryson, Inc. TRADITIONAL TOWN CENTER Author: Denise B. Clapp.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
ColeJenest & Stone Kimley-Horn & Associates Rose & Associates.
Thursday, November 18, 2010 LOMBARD DOWNTOWN PLAN Village Board Meeting Lombard Downtown Revitalization VILLAGE BOARD MEETING Thursday, November 18, 2010.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Whitney Park East Annual Meeting October 18 th, 2011.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
All About Maps Beth Clause. How Firefighters Use Maps.
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
2 INTRODUCTION Town of North Andover Bruce Thibodeau, P.E. – Director of Public Works Curt Bellavance, AICP – Director of Community Development – Director.
City of Prairie Village 75 th Street Mission Road to State Line Road.
Excerpts from North Loop Neighborhood Plan. The intersection of Airport Boulevard and 51st Street is seen as one of the most important in the neighborhood.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
White Pigeon Community Schools
Area (Name MUST be on list)
J.R. Smith Elementary School
District 3 Complete Streets Projects
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
High Street Streetscape Improvement Project
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
J.R. Smith Elementary School
Heartland Corner Redevelopment Project
SE 12th Street Roadway Improvements February 8, 2005.
PAD Proposal.
Application for Zoning Amendment
City Council March 18, 2014.
Broadway Plaza Redevelopment
Harbour Island Force Main Replacement
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Creating Streetscapes With Conventional Zoning
Presentation transcript:

Downtown Village Streetscape Improvements Zionsville Merchants’ Association January 7, 2009

What is a Stormwater BMP? “Best Management Practice”  Stormwater Management Design  Promote infiltration  Reduce Quantity  Improve Quality  Include “Overflow” design to prevent ponding  “First Flush” absorbed into ground  Highest level of contaminants  Incorporate appropriate plant materials

Typical BMP Island Tolerant Plant Material

Hawthorne St. West BMP Islands Traditional Landscape Islands = New Sidewalks= Directional Sign

Hawthorne St. East Traditional Landscape Islands BMP Landscape Islands

Pine Street West Traditional Landscape Islands BMP Landscape Islands

Pine Street East BMP Landscape Islands Traditional Landscape Islands Parallel Parking to Remain on South Side

Cedar Street West BMP Landscape Islands Traditional Landscape Islands

Cedar Street East Traditional Landscape Islands BMP Landscape Islands

Parking Count  Hawthorne Street  Conceptual design  30 existing spaces  39 proposed spaces  Final design  38 spaces  Lose one space in front of Times Sentinel Building

Parking Count  Pine Street  Conceptual design  34 existing spaces  40 proposed spaces  Final design  40 spaces  Lose 3 for swapping angled/parallel parking but pick up 3 at old Shell property through angle parking

Parking Count  Cedar Street  Conceptual design  41 existing spaces  41 proposed spaces  Final design  39 spaces  Lose one space in front of Cassini  Lose one space north side of east block from Main St. to alley

Parking Count  117 Total Spaces  39 Cedar St.  Includes 1 H/C space  Add loading zone in front of dry cleaners  40 Pine St.  H/C where?  Loading where?  38 Hawthorne St.  H/C where?  Loading where?

Parking Count  105 existing spaces  117 final spaces

Directional Signage  Alphabetical listing  Include Elm St.?  Appropriate size  Geared toward pedestrians, not cars Additional Shops

Needed Input:  Location of H/C spaces  Likely not van-accessible  One per block?  Loading areas  Time-limited parking designation  Location?  More than one space in length?

Timing  Complete final design in January  Advertise for bids in February/March  Award contract in April  Notice to Proceed in April  Start construction in May/June  Estimate day project

General Info  Cost  Engineers estimate not finalized  Likely closer to $500,000 estimate than $750,000  Construction  Likely to be periodic complete closures of streets  Hopefully only a couple days at a time

QUESTIONS/COMMENTS WWW.ZIONSVILLE-IN.GOV