M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
Automotive Air Conditioning System Principle. What is Air Conditioning? Air conditioning is to adjust the indoor air (or air in a space) and make its.
Overall issues for adequate design for high-ambient temperature operation by: Samir Hamed Petra Engineering Ind. Co. Rtoc member.
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 as Air Conditioning Systems. 2 as Split Type Air-Cooled Suction Line Liquid Line Condensing Unit (CDU) : Fan Coil Unit (FCU) : MCW,MCX,MCD,MCC,MCV,TTH,TWE,TTV.
Solar cooling systems.
Adsorption Refrigeration System. INTRODUCTION  Adsorption refrigeration system uses adsorbent beds to adsorb and desorb a refrigerant to obtain cooling.
Pierre Bonneau EN/CV/DC
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Detector Cooling Project Thermosiphon Project Status Report
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
N O R T H A M E R I C A C O M M E R C I A L TDP
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
M. Battistin – 9 th June 2010EN/CV/DC M. Battistin (EN/CV/DC) 9 th June 2010 Detector Cooling Project - WP III Advancement Status.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
BCWC Water-cooled water chillers with centrifugal compressor/s
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
60kW Thermosiphon control system
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
2016 Chiller New Products Presentation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
ATLAS Thermosiphon Readiness Review 17th March 2016
M. Battistin CERN EN/CV/DC 9th July 2009
Thermal Energy Storage
ATLAS Thermosiphon Electrical Distribution and Run Modes
EN-CV: P8 systems and Detector Cooling
Low temperature chiller Market Survey
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRK Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation

M. Battistin –6 th July 2009 EN/CV/DC 2 Moving the complication out PR thermal screen others 4 liquid lines 4 gas lines condenser liquid tank pneumatic valve manual valve manual valve dummy load Heater BPR pixel 6 X SCT manual valve pneumatic valve Let’s explore the chiller part of this installation: The cycle needs a condensation at low pressure and temperature. C3F8 obliges to condensate between -50°C and -70°C to reach very low pressures, 450 and 200 mbara respectively. Low temperature Chiller UX15 USA15 Surface

M. Battistin –6 th July 2009 EN/CV/DC 3 The chiller is the critical part of the installation

M. Battistin –6 th July 2009 EN/CV/DC 4 The fridge cascade Primary Water 25°C Cooling source is the primary water coming form the cooling towers: ≈25 °C Two fridge systems in cascade takes the temperature to -70 °C. The first stage uses R11 and the second stage R507a. The second stage cools down a small liquid brine circuit R134a used to condensate the C3F8 in the condenser of the thermo siphon circuit. The condensed C3F8 falls in the liquid received due to gravity. First chiller Second chiller -30°C-70°C -67°C Condenser Liquid receiver Brine

M. Battistin –6 th July 2009 EN/CV/DC 5 Many possible suppliers The fridge cascade shall be: 1)Fully redundant (2 x 100% or 3 x 60% solutions can be adopted) 2)Highly reliable (proven performances and MTBF) 3)Automatic (the control system will be independent to the thermo siphon one) We will search for fully industrial hand-key solutions realized by reliable company with a proven list of similar installation realized in the past. We are now in the Market Survey (MS) phase. The visit to the companies premises will be part of the selection criteria of the MS. The Invitation to Tender (IT) will be sent to the selected companies only. The long list is: Axima Refrigeration (D), Axima (CH), Angelantoni (I), Froid Seicar (F), Mayekawa Europe (B), Clauger (F), others are going to be selected

M. Battistin –6 th July 2009 EN/CV/DC 6 Visit to Angelantoni on June 29 th 2009 Clear previous experience on refrigeration for industry: 1)Brine chilling units, package design, air-cooled or water-cooled, refrigerating capacities from 30 to 800 kW, temperature range from 0°C to – 80°C. 2)Refrigerating systems for harmful gas or vapors condensation, to avoid environment pollution, custom-designed according to Customer requirements, capacity range from 30 to kW, temperature range from 0°C to – 80°C. We are waiting (this week) for the first detailed technical and commercial offer for a cooling unit 6 -60°C or -70°C. The budget offer is around 100÷150 k€ 5.0 m 1.5 m 2.0 m 100÷150 k€

M. Battistin –6 th July 2009 EN/CV/DC 7 Conclusions The low temperature cooling source is the critical part of the thermo siphon installation. It leads the MTBF of the system. We believe that a fully redundant, fully industrial solution shall be adopted. Previous experiences (EN/CV/DC) with industrial contract show how the supplier selection is a very critical point. We are going to launch the Market Survey for the selection of the short list of companies for the supply and installation of this part of the system. The first stage will be for low power (ATLAS IBL design parameters). This will validate the solution for phase II.