Double Star meeting ESTEC 25/26 March 2002. Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

WECC Reliability Based Control Field Trial
January 6. January 7 January 8 January 9 January 10.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
Chicas, este calendario si es pa' nosotras !!!!!.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Refuse Analysis th & 6 th study the refuse bills & present their findings.

PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
His Story Board Monthly Theme-Focused Activities Choose Truth
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
August Intro to Course Syllabus Read Calendar Supplies 25 Read p Read p Read p
August Wildcat Express 8-11, Inservice Inservice Inservice Inservice ,
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Chapter 4. CONCEPT OF THE OPERATING SYSTEM MANAGING ESSENTIAL FILE OPERATIONS.
Status of the DSP/ASPOC EM
Double Star: Experiment Activities
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
Double Star: Table of Contents
Double Star: Table of Contents
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Double Star Progress Meeting #3 Beijing 2 July, 2002.
EM pre-integration review
0.0 Instrument Suite Name Presenter’s name
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
GLAST Large Area Telescope
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Robotics June 1, 2005 Water March 30, 2005 Developing Countries November 30, 2004 ICT October 27, 2004 Service Industry [finance, telecom]
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
Workshops, Assignments and Work place visits
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
February 2007 Note: Source:.
McDonald’s calendar 2007.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Habitat Changes and Fish Migration
Star Benchmark Percentile Ranking Name:
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Double Star meeting ESTEC 25/26 March 2002

Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested on the EM New Engineering breadboard under fabrication – Using a A54SX16 – Containing all the "cluster " like interfaces including FGM – Redundant Interface added (TM, TC, SPIN CLK) New connector (J04 – 25 pins) added close to J01 – 25 pins – For redundant interfaces

Double Star meeting 25/03/2002 ESTEC Engineering board

Double Star meeting ESTEC 25/26 March 2002 Software Status Documentation given to Andrea Maria Di Lellis First version received but not tested Development will continue in parallel with the hardware development

Double Star meeting 25/26 March 2002 US components status

Double Star meeting ESTEC 25/26 March 2002 Properties Interface board changed - equivalent size (see EID-B) Mass : 3.5 Kg (including radiation shielding) Power : 3.8 W max ; 2.8 W min (nominal)

Double Star meeting ESTEC 25/26 March 2002 Planning EM interface board : end March 2002 FM interface board : October 2002 EEPROM Software modification : end April 2002 PROM Software modification : end September 2002 FM integration : end November Verification under vacuum : ended by 20/12/2002 Environmental tests : 2 weeks Delivery : end January 2003

Double Star meeting ESTEC 25/26 March 2002 Standard Connectors sent to China : 14 February 2002 Documentation Status : Interface data sheet : 15 February 2002 Pin assignment and wire type : 15 February 2002 Control Files : 05 March 2002 On board monitoring : 20 March 2002

Double Star meeting ESTEC 25/26 March 2002 Outstanding Issues Thermal blanket fabrication Harness Interface test configuration Data collection during interface test Funding problem