An Introduction to Cathodic Protection. The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused.

Slides:



Advertisements
Similar presentations
Bridge Corrosion A look at the corrosion of steel in Bridges.
Advertisements

(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Coat Hook Revision Notes
CASTING A CONCRETE WALL
Cathodic Protection of Steel in Concrete
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Step-by-step assembly instructions
HVAC523 Soldering.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
REPAIRING/RECONDITIONING TOOLS UNIT *Obvious use of tools is to build, repair and adjust objects *High quality tools will last for years if used & maintained.
CBCAUTOMOTIVERKCBCAUTOMOTIVERK CYLINDER BLOCK INSPECTION & CLEANING u Chapter 11 u Classroom Manual u Page 259 u Lab Manual u Page 269.
Distress, Evaluation, and Repair of Historic Concrete Jarkko Simonen, P.E. Wiss, Janney, Elstner Associates, Inc.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Fuel cells differ from batteries in that the former do not store chemical energy. Reactants must be constantly resupplied and products must be constantly.
Objectives : ANALYZE home maintenance techniques.
Repairing and Reconditioning Tools Tool Fitting. Objectives: 1)Identify and remove rust from tools in the lab with 100% accuracy 2)Demonstrate the application.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
Lesson 2. Galvanic Cells In the reaction between Zn and CuSO 4, the zinc is oxidized by copper (II) ions. Zn 0 (s) + Cu 2+ (aq) + SO 4 2-  Cu 0 (s) +
Corrosion & Associated Degradation
CONSTRUCTING A FIVE CABIN LATRINE
Agricultural Mechanics 1 Kingsburg High School. Identifying Metals  All metals are either ferrous or nonferrous Ferrous metals contain iron(Fe) Nonferrous.
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
Cracks in Concrete. 2-Classifications 2-Classifications 3-Concrete removal, preparation 4-References Cracks in Concrete 1-lntroduction.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Physical Science Applications in Agriculture Unit Physical Science Systems.
Presented by: Peter Emmons,
Base metal prep.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
4 Chapter Power Tools and Equipment.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Deferred Maintenance CFAA Conference Presented by: Paul Belanger P.Eng., Belanger Engineering Bill Zigomanis, Boardwalk REIT Ivan Murgic, Greenrock Property.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
NGfL CYMRU GCaD PRESENTATION PAINTING & DECORATING PAINTING & DECORATING.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
EMPLOY AN M18A1 CLAYMORE MINE
The Use of Zinc Anodes to Extend the Life of Concrete Patch Repair Jack Bennett J.E. Bennett Consultants, Inc.
POWER TOOLS Electric drills
Rubbish Hook SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Intaglio Materials.
University of Nebraska–Lincoln Know how. Know now.
Roof Hook SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
Agricultural Mechanics Career Development Event Concrete and Masonry
Model Agricultural Core Curriculum: Supplement University of California, Davis 911.T 1 Basic Hand and Power Tools Hand Tool Safety Carry with sharp point.
appseal ® STP Acrylic based elastomeric strip Areas of application: (A) Over Construction joints. (B) Over Expansion joints. 1.
neha speciality chemicals pvt. ltd. 1 appseal ® AM 111 Acrylic based elastomeric membrane.
How To Install a Centrifugal Water Pump. Installation Process First of all, consult the manual book to determine the right process of installation.
Institute of Building Materials Research Conservations Repair and Polymer Composites RWTH Aachen University, Germany “Who`s managing the quality in the.
MATERIAL SCIENCE HONORS CORROSION. Corrosion The degradation of a material due to a reaction with its environment.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
5. FERROCEMENT.
Automotive Engines Theory and Servicing
Concrete Repair.
Base Metal Preparation
Minimizer Confidential
Minimizer Confidential
Unit 13 Ag Mechanics Fastening metal.
Objectives : ANALYZE home maintenance techniques
Fiberglass-Reinforced Sheet Flooring Installation System
B-Clean™ Heavy-Duty Concrete & Masonry Cleaner
Corrosion Control methods
3 Effective Methods to Repair the Cracked Plastic Radiator of Car.
Fiberglass-Reinforced Sheet Flooring Installation System
إختبار وتقييم المنشآت الخرسانية
Corrosion & Associated Degradation
Corrosion Control Must be addressed at the design stage
CATHODIC PROTECTION OF REINFORCED CONCRETE STRUCTURES
Presentation transcript:

An Introduction to Cathodic Protection

The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused the reinforcement within the concrete to corrode. This expanding rust has caused the surface to spall and crack leaving the reinforcement exposed to further attack.

The Solution The Corrosion Engineer has designed a corrosion control system using Galvashield XP zinc anodes to provide localized protection to the perimeter of the patch repairs, and Galvashield CC anodes drilled and fitted to provide targeted corrosion control to the surrounding sound concrete.

The defective areas are identified by an acoustic hammer test survey and marked out. The defective concrete is then broken out using electrical breakers and the edges cut using diamond blade angle grinders.

The concrete has to be broken out and the reinforcement chased back until clean steel is reached. Breaking out behind the steel reinforcement bars must also be carried out to allow the complete removal of rust (even behind the bars).

The steel is cleaned to remove all rust using either a gritbalasting technique or mechanical wire brushes and emery cloth. This ensure complete removal of all corrosion and gives a good connection for the galvanic XP anodes.

The anodes selected for this project were the Galvashield XP 2 for the patch repairs and Galvashield CC for the sound but contaminated concrete. Galvashield CC Unit Galvashield XP 2 Unit Galvashield CC Connector

The Galvanic XP 2 anodes are wire tied to the reinforcement. The wires not just holding the anode in place but also forming the electrical connection.

The steel reinforcement is then painted with a zinc rich primer to protect the steel

The concrete is marked out to the Corrosion Engineers drawings and then Cover meter surveyed to ensure that core holes do not cut through the existing reinforcement. Positions adjusted and the holes cored. A slot between the core holes is made using an angle grinder.

The core holes are flushed out to clean them and then pre-soaked to ensure that the specialist gouting mortar for the Galvashield CC units doesn’t dry to quickly. The CC units are also pre-soaked prior to installation

The specialist grout is mixed and pushed into the core hole. The Galvashield CC unit is then pressed firmly into the hole.

The excess grout is wiped away and the connection wire cleaned of any grout residue.

The connecting wire is then passed between each anode and connected using the special crimp on connection unit

An area alongside the run of anodes is opened up to expose a section of reinforcement. The ends of each run of anodes (normally between 6-10) are connected to directly to this reinforcement bar using a rivet through a pre-drilled hole.

All connections are tested for continuity by the installers and then double checked by the corrosion Engineer.

Traditional concrete repairs are then carried out to the broken out patch repairs, core holes, chases for wire connections and any other defects such as cracks identified during the works.

The splash zone areas are then high power pressure washed to remove any dirt, algae, grease or other contaminants. The areas are then primed and given two coats of an Anti-Carbonation coating.