Example #9 Integrated Magnetics Example

Slides:



Advertisements
Similar presentations
1 Application Software Course Simulink By: Mahdi Akbari 2010.
Advertisements

How to Build Macro-Models in Tina SPICE
Welcome to Famis From W&M home page – Search famis.
1 1 Mechanical Design and Production Dept, Faculty of Engineering, Zagazig University, Egypt. Mechanical Design and Production Dept, Faculty of Engineering,
JustinMind: Dynamic Panels
AS ICT Building MS-Access Databases. Creating a Combo Box Drop Down List 1.When creating a Field requiring a Drop Down list in a Table, select the Lookup.
All rights reserved. Copyright G. Peifer 1 Using Computer Spreadsheets to Solve Equations 1.Log into the Network and open Microsoft Excel. 2.Finding.
Select New Project from Project menu to create a new project File.
Interactive Boardmaker Basics By: Vanessa Wilkinson (nee Bushbacher) & Robyn Jung.
PRIMARY, SECONDARY & QUANTITATIVE RESEARCH TASK HYPERLINK APPLICATION PROCEDURE 1.
Introduction Headers & Footers. You will learn how to: Create, Format, Edit and Delete Create Different Header/Footer in a Document Create a First Page.
DRAWING USING SURFACES 115. To start your SURFACES drawing, go to new drawing, choose PART. Once the Part screen appears, click on START, choose MECHANICAL.
Course ILT Formatting characters and paragraphs Unit objectives Change the appearance of text by applying character formatting Align text by using tabs.
Visual Basic 2010 How to Program. © by Pearson Education, Inc. All Rights Reserved.2.
Visual Basic 2010 How to Program Reference: Instructor: Maysoon Bin Duwais slides Visual Basic 2010 how to program by Deitel © by Pearson Education,
Introduction to ABAQUS 27 th February, Units Before starting to define any model, you need to decide which system of units you will use. ABAQUS.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Virtual components in assemblies.
Roentgen photo effect. This detailed, thoroughly explained lesson will show you how to create very attractive roentgen photo effect. You can use this.
BoardMaker Ver 6 Creating Interactive Activities for the Classroom.
0 iTools View Builder 2 iTools - View Builder You will also need to have a simulation 3216 running in iTools to link to later.
Printing and Page Formatting ITSW 1401, Intro to Word Processing Instructor: Glenda H. Easter.
1 Creating Icons for Commands When there is not an icon related to a command in your toolbars, you will see a question mark (?). No preview available …
Working in 3D using digital elevation models An example using ArcScene to investigate ice elevation and bed elevation data in Antarctic.
Chapter 10 Using and Creating Symbols. Objectives Set the scale of a drawing for inserting symbols Use the DesignCenter and Content Browser to insert.
SMART Response Initial Set-up: Windows PC Teacher and Class Set-up Creating a Quiz, Test, or Survey Delivering an Assessment Reports Additional Question.
1/28/2010 Network Plus Windows Networking Network Identification Identifies name and type of network. Installed adapters –Performed during Windows installation.
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 4 1 Microsoft Office FrontPage 2003 Tutorial 4 – Using Shared Borders and Themes.
When you start Photo Story the title screen gives you three options. The following slides will illustrate the directions when “Begin a new story” has been.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
Intro to MFC. Open VS and create new project 1)Open MS Visual Studio 2008 Professional (It must be the Professional Edition, the Express Edition will.
Oracle Data Integrator Workflow Management: The Packages.
A Small Tutorial on : 1) Managing Photos 2) Uploading Photos 3) Creating Blog.
Quick guide on making PowerPoint slides  PowerPoint is a presentation program  A PowerPoint slideshow is a stack of slides being presented one after.
The George Washington University School of Engineering and Applied Science Department of Electrical and Computer Engineering ECE122 – 30 Lab 3: Layout.
Project Deployment IT [211 CAP] How to convert your project to a full application.
Configuring System Settings Lesson 3. Skills Matrix Technology SkillObjective DomainObjective # Introducing Windows AeroConfigure and troubleshoot Windows.
WS14-1 VND101, Workshop 14 MSC.visualNastran 4D Exercise Workbook Foot Support.
UCLPv2-HOPI Issues BoF Joint Techs Workshop Vancouver, BC 2005.
Creating an Action Button in PowerPoint XP You will need to create all of your slides first. Then you are ready to start making buttons!
Views Revit® Architecture CHAPTER OBJECTIVES Understand and use Floor Plan and Reflected Ceiling Plan (RFC) views. Learn how to create Elevation.
Using COMET with Visio Visio UML Modeling. Creating a Drawing After opening Visio, you will see a list of templates available.
Course 6: Analyzing AVO/AVA Analysis. Use gassman’s equations to predict velocity Objective accurately predict changes in amplitude.
Web Design-Lecture3-QN-2003 Web Design Enhancing a Website.
Unit 1: Plotting DT2510: Advanced CAD Methods. Identifying the user interface: Application menu Quick Access toolbar InfoCenter Ribbon Drawing window.
* DataSpace. * What is DataSpace * DataSpace is a third party add-on to ArcGIS Desktop * Developed by US Bureau of Reclamations * Allows the user to arrange.
Click the I Pro and select MANAGE and the PROJECTS. This will allow you to set up a folder that will contain the files for your current project. If you.
Microsoft Word Tutorials Created by L. George 2005.
Customizing Menus and Toolbars CHAPTER 12 Customizing Menus and Toolbars.
IE 411/511: Visual Programming for Industrial Applications Lecture Notes #2 Introduction to the Visual Basic Express 2010 Integrated Development Environment.
Integrating Components and Dynamic Text Boxes with the Animated Map– Lesson 101 Integrating Components and Dynamic Text Boxes with the Animated Map Lesson.
Pg 1 PEmag Assorted Features. Pg 2 Overview  PEmag is the “Advanced Modeling module” for PExprt  Based on finite element analysis  Considers geometry,
Example Problem #2 Maxwell 2D Hall Sensor. T7_3D, pg. 2 7/21/02 Hall Sensor Description: The Hall sensor works similarly to the vr sensor, except that.
Example #7 Influence of core gap on the winding losses.
Making a 24hr Timer.
Dive Into® Visual Basic 2010 Express
Windows Tutorial 3 Personalizing Your Windows Environment
INTRO to PIXLR.com.
Example #8 Influence of the interleaving on the winding losses
Mastering Autodesk Revit MEP 2016 CHAPTER 14: Circuiting and Panels
PExprt Modeling Procedure
Maxwell 3D Transient.
Configuring System Settings
Microsoft Windows XP Inside Out Second Edition
PExprt Model Types.
Signature: Microsoft Word 2003
Introduction to SolidWorks
Import Files The Import button will either add a layer to the map (in the case of SHAPE files such as those created by ESRI products) or open image files.
SOP of System Security Settings
Navigating Excel.
eSeries Entities By Julie Ladner
Presentation transcript:

Example #9 Integrated Magnetics Example Designing a new 42-volt automotive power system requires knowledge of components, electronics and controls. It has become a truly multi-disciplinary engineering task. Ansoft's Electromechanical System Design Suite is a powerful combination of software simulation technology including electromagnetics, circuits, block diagrams, state machines, and specialized design programs which allow an engineer to successfully design and analyze a complete 42V system from start to finish.

Open PExprt Modeler [PEmag] application This example shows how to setup and solve an Integrated Magnetics model, which has windings on all three core legs. Note: In the Maxwell Projects panel, create a PEmag project instead of a PExprt project. Integrated Magnetic models cannot be generated from PExprt

Select File/New for a new project Opening PEmag from Maxwell Control Panel, a new project is opened by default

Note: Only EE, EI, UU and UI cores are valid for Integrated Magnetics Select E25/10/6 core from Ferroxcube library Un Ferroxcube library, select E25/10/6 and drag the core on the “cross section area” to assign it Note: Only EE, EI, UU and UI cores are valid for Integrated Magnetics

Double click on core element in library tree to edit Edit core properties and select “Double 2D” Double click on core element in library tree to edit

Select winding strategy “1 layer concentric” from Ferroxcube library On Ferroxcube windings tab, drag the “1 layer concentric” winding strategy and drop it on the “cross section area” to assign it

Select winding strategy “3 layer concentric” from Ferroxcube library On Ferrocube windings tab, drag the “3 layer concentric” winding strategy and drop it on the “cross section area” to assign it

Assign AWG20 wire to each layer of “3 Layer Concentric” winding strategy Select 3 Layer Concentric Drag AWG20 wire and drop it on the layer to assign it

Assign 14 turns to each layer Right click on each layer symbol to edit properties and assign 14 turns

Drag the AIR_200um insulator and drop it on the layer to assign it Assign “AIR_200um” insulator to the insulator layer of “3 Layer Concentric” winding strategy Drag the AIR_200um insulator and drop it on the layer to assign it

Right click on the layer to edit properties and change to 12.5mm high Assign 12.5 mm to the layer height Right click on the layer to edit properties and change to 12.5mm high

Connect layers as shown in the picture Use “Connections/Add” to add connections to both winding A and winding B

Assign AWG18 wire to the layer of “1 Layer Concentric” winding strategy and assign 11 turns to the layer Click on 1 Layer Concentric winding Drag AWG18 wire and drop it on the layer to assign it Right click on the layer to edit properties and assign 11 turns

Use “Connections/Add” to add connections Connect layers as shown in the picture Use “Connections/Add” to add connections

Information for each core leg appears Select “Current Design” tab Information for each core leg appears

Select “Winding Setup [Left Leg]” Click on winding setup for each leg to list Available Winding Setups under Available Elements

Select “1 Layer Concentric” from the available elements list Click on Winding setup [Left Leg] and then 1 Layer Concentric to assign it

Repeat the two previous steps for the right leg Click on Winding setup [Right Leg] and then 1 Layer Concentric to assign it

Select 3F3 core material from Ferroxcube library Drag 3F3 core material and drop it on the “cross section area” to assign it Click on “OK” when the Al dialog appears Click on “OK” when the Core Properties dialog appears

The Magnetic Component Definition is done and ready for modeling Click on “2D” button to generate the model Model should take approximately 8 minutes to be generated

Results Choose Results / FEA Based (2D) / FEA Based Results (2D) to view calculated parameters for the Pemag model

Results: Small Signal test available Use “Results\Using the model\Small Signal Test” or click on toolbar button to define the tests

Viewing Maxwell 2D Project Choose Modeler / FEA Based Modeler (2D) / Maxwell 2D link / Eddy Current to open the Maxwell 2D project

Note: In Simplorer, the model can be inported using the Interface6 library and the PExprt element. Note: The nodes of the model are clearly named in the model netlist and in the model symbol

Open “EE_Integrated” example Note: Different bobbins can be assigned to each core leg Open “EE_Integrated” example

Open “EI_Integrated_Planar” example Note: Planar Integrated can also be defined Open “EI_Integrated_Planar” example