1 WA105 General Meeting CERN, 21/9/2015 Technical Board, introduction Dario Autiero, IPNL Lyon.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
N_TOF fission data of interest for ADS
CERN LBNE Test Experiment. Plan view of Bat
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
M. Bianco On behalf of the ATLAS Collaboration
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
CLAS12 Drift Chamber Prototyping
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 WA105 General Meeting CERN, 21/9/2015 Status of charge readout analog and digital FE Dario Autiero, L. Balleyguier, E.Bechetoille, D.Caiulo, B.Carlus,
Discussion slides Dual-Phase ProtoDune 25/2/2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
1 WA105 General Meeting CERN, 21/1/2015 Status of charge readout FE electronics and DAQ Dario Autiero,E.Bechetoille, D.Caiulo, B.Carlus, L. Chaussard,
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 WA105/ProtoDUNE dual-phase General Meeting CERN, 7/3/2016 Status of charge readout analog and digital FE Dario Autiero, L. Balleyguier, E.Bechetoille,
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Analysis of LumiCal data from the 2010 testbeam
Calorimeter Status Electronics Installation and Commissioning
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
AFE II Status First board under test!!.
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Toward a costing model What next? Technology decision n Schedule
The digital read-out for the CSC system of the TOTEM experiment at LHC
BESIII EMC electronics
The digital read-out for the CSC system of the TOTEM experiment at LHC
The LHCb Front-end Electronics System Status and Future Development
Plans for the 2004 CSC Beam Test
Presentation transcript:

1 WA105 General Meeting CERN, 21/9/2015 Technical Board, introduction Dario Autiero, IPNL Lyon

2 Constant TB activity since end of January discussing the main aspects of the 6x6x6: EHN1 Integration Beam design and instrumentation Cryostat design Cryogenics Light readout DAQ integration Online processing facility LEM production and commissioning CRP structure design Cathode and field cage design HV system Feedthroughs Cosmic rays measurements Last months efforts focused on Cryostat and detector interface interfaces (feedthroughs + CRP design) integration in EHN1  Rather urgent issues to be finalized for the cryostat In parallel constant progress with the 3x1 construction followed in the 3x1 meetings

3 3x1 weekly meetings:

4 Increase of activities since June on the EHN1 integration with dedicated integration meetings (5 so far), alternated to the neutrino platform meetings: Discussed: General advancement of EHN1 construction Cryostat requirements Cryostat integration and position wrt beam, muon background, clean room buffer, single phase test Mounting procedures for the cryostat Counting rooms, access to the top of the cryostat Power and network requirements Ilias had the goal of defining the requirements and a first layout of EHN1 integration by the middle of September Also the design of the beam line has to be finalized by the end of this month  Two dedicated presentations at this WA105 general meeting Additional infos: Progress reports to SPSC in April and June 2015

5 Rather tight schedule defined in the WA105 MOU: The next 3 months will be crucial to finalize many details of the design: Orders for the external cryostat structure are foreseen by Marzio to be submitted by the end of the year. Marzio is actually focusing on having a similar design for the single-phase and double- phase cryostats. Calculations on the external structure are being validated by an external company A detailed discussion on the cryostat design by CERN with GTT did not happen yet a document with the requirements and conceptual scheme for GTT should be completed by this week  We have to focus in the next weeks in checking that the final design is OK with respect to the requirements we have submitted in these months, positions of the penetrations etc..

6 Some general requirements on the WA105 cryostat:  Inner Cryostat dimensions: 8x8x8 m3  Average heath flow: <=5W/m2  Operating gas pressure: ranging from -50 to +100 mbar with respect to atmospheric pressure  Detector weight: 15.38/12.82 T (dry/wet weight) Of which: Anode deck: 2.68 T, Field cage 12.70/10.14 T (dry/wet weight)  Penetrations: Anode Suspension FTs: N. 12, crossing tube diameter 40 mm Field cage suspension FTs: N. 16, crossing tube diameter 80 mm Signal chimney FTs: N. 12, crossing tube diameter 277 mm Slow control chimneys: N. 4, crossing tube diameter 80 mm HV FT: N. 1, crossing tube diameter 156 mm Manhole: N. 1, crossing tube diameter 609 mm  TCO access connected to clean room buffer, beam window pointing to center of detector active volume  Cryogenic penetrations defined by the cryogenic group

7 3x1 cryostat construction with insulation panels and corrugated membrane completed in first half of August 2015 Local leak tests performed with He leak checker in sniffer mode (sensitivity 1 E -6 mbar l/s), no leaks found. Work in progress to define a more sensitive accumulation test which should globally achieve a sensitivity of 1 E -6 mbar l/s or better over the entire surface of the membrane Top-cap ordered to GABADI after some adaptations to requirements from cryogenic group 3x1 design ensures the requirement of 5 W/m2 with 1 m insulation thickness with a combination of 3 panels ( mm). 400 mm panels are the standard ones in LNG construction. TBC configuration for 6x6x6

EHN1 Extension WA105 Single phase test 8

9 Cryogenics: finalization of cryogenic system for 3x1  6x6 design not started yet, needed in the pipeline immediately after completion of 3x1 on the basis of 3x1 as building block  presentations by D. Montanari and S. Wu

10 Field cage and cathode design: Finalization of feedthroughs + field cage + cathode design (see presentation by Franco) 3 field rings interrupted for the particle beam “chamber” Cathode made by a pair of outer ring (as field rings) and transparent- conductive glass/acrylic/polycarbonate panels with embedded wire mesh and WLS.  New techniques for the realization of the cathode (transparent ITO conductive coating on large PMMA plates)  Presentation by C. Regenfus Hanging chain

11 WA105 6x6x6 installation sequence and logistics: Installation logistics for the 6x6x6 not discussed at this meeting Important to finalize the detector installation procedure: CRB use, mounting procedures once the final dimensions of all elements (CRP frames, field cage elements, cathode elements, etc..) are know. Foreseen to have a full week of work with Roger Collins to define the installation procedure once all the elements are precisely known,  to be organized before the end of the year

12

13 DUNE optimization: Far detector anode plane composed of 80 (4x20) independent Charge Readout Plane units (CRPs) 3x3 m readout channels/CRP unit Suspension chimney Signal chimney 640 ch Slow control chimney 3m uTCA crate Each CRP:  36 LEM/anode sandwiches (LAS) 50x50 cm 2  3 signal chimney feedthroughs 640 channels  3 suspension feedthroughs for level adjustment  1 slow control feedthrough  X,Y collection strips of 3 m, mm pitch (like in WA105 6x6x6 m 3 ) Strips connections scheme Y1-160Y Y Y Y Y X1-160 X X X X X x50 cm 2 LAS uTCA crate

14 Zoom on a corner of the DUNE detector including 2 CRP unit

15 Detector quantities  80 CRP units  60 Field shaping rings  240 Signal FT chimneys  240 Suspension chimneys  180 PMTs

16 Possible implementation of the WA105 anode with 4 DUNE 3x3 m 2 CRP units

17 DUNE CDR Far Detector Alternate design, synergies and WA105 sections Design for a double-phase 10 kton module defined in the DUNE CDR for CD1-refresh (April-July 2015) Continuation of 10 kton design activities in the framework of the DUNE Far Detector working group (Double-phase subgroup, Conveners M.Zito, S. Murphy) Activity to be pursued in strict contact with WA105 developments Next urgent step in view of CD3a review of the facility: definition of detector interface and logistics requirements  review of construction/installation design and detailed logistics of the construction steps studied for Phyhasalmi for the SURF double-phase 10 kton detector installation Far Detector Alternative Design WA105 Synergies

18 Anode deck design:  dedicated TB meeting last Monday  hot item to be discussed at this meeting (see presentation by LAPP group), finalize design of 3x3 DUNE-like CRP modules (structure, assembly procedure extraction grid integration) Horizontal cold bath test of the 3x1 CRP successful. Photogrammetry 3D characterization on 260 points ~100 um accuracy

19 DAQ timing-trigger integration CC 1CC 2 CC 12PMC CC 6 CC GbE links + 2 spares Bittware card 1Bittware card GbE links + 1 spares Meinberg GPS White Rabbit GrandMaster switch WR slave MCH mezzanine WR slave trigger board Time Beam window NIM signal every 20 s Beam Trigger counter NIM signal ~ a few 100 Hz Charge readout Light readout WR Clock + time + triggers Digitized data Time Data processing PC 1Data processing PC 2 Trigger PC Cosmics counters

Trigger counter uTCA crate of LRO PMTs For light readout Crate with NIM logic Spill signal (cable) PC with WR time stamping card WR Time stamps: Beam trigger Start of spill External cosmic trigger Calibration pulses External trigger plane for cosmics WR switch Light readout (LRO) WR link x12 Charge readout WR links Light

21 White Rabbit based Time/trigger distribution scheme WR Grand Master SWITCH Meinberg GPS MASTER CLOCK µTCA Shelf WR slave µTCA Shelf WR slave µTCA Shelf WR slave µTCA Shelf WR slave Clock + time + trigger data on uTCA backplane Clock + Time AMC GbE AMC PC WR slave Trigger board No need to develop analog clock distribution system and microTCA receiver cards Beam counters/large area cosmic counters trigger board also in WR standard  generates trigger timestamps transmitted on WR network Light readout DAQ uTCA  generates trigger timestamps transmitted on WR network Development of the WR slave as MCH mezzanine from a commercial WR node Sub-ns sync accuracy Time and Trigger distribution Light readout uTCA crate (generates light triggers)

When we have a beam trigger we can have on average 70 cosmics overlapped on the drift window after the trigger (these cosmics may have interacted with the detector in the 4 ms before the trigger and in the 4 ms after the trigger  chopped tracks, sliding effect

t=beam trigger - 2 ms t=beam trigger  reconstructed event drift t=beam trigger t=beam trigger + 2 ms reconstructed event drift Cosmic overlaps in +- 4 ms around the beam trigger time  Arrival time tagging by LRO signals Cosmic ray Shower Overlap before beam trigger Overlap after beam trigger

 Definition of LRO digitization requirements in collaboration with SB, reported in LRO digitization talk of this afternoon by P. Prat During spills we need a continuous digitization in the +-4 ms around the trigger time of the light (the light signal is instantaneous and has the real arrival time of the cosmics) Sampling can be coarse up to 400 ns to correlate to charge readout  Example: sum 16 samples at 40MHz to get an effective 2.5 MHz sampling like for the charge readout The LRO card has to know spill/out of spill Out of spill it can define a light triggers when n PMTs are over a certain threshold and transmit it over the WR

25 Online storage and data processing  first design defined (see JM’s talk) now see how to move to implementation with CERN Defined basic architecture for local network, storage and computing:  Possibility to run with the beams without zero suppression at 100 Hz, event size 150 MB 15 GB/s, Huffman lossless compression under study  Online buffer storage up to ~PB  Online processing farm for event reconstruction, purity and gain analysis from cosmic ray tracks overlapped to beam events in a +-4ms window around the beam triggers

26 A lot of progress ! (on top of infrastructure preparation and design issues discussed before) a lot of progress on 3x1 construction and preparation of the detector elements for 3x1 and 6x6: LEM tests Feedthroughs prototyping Purification and cryogenics PMTs for light readout HV Slow control Electronics for charge and light readout and DAQ Discussed in the talks of the TB sessions today …

27 Quite crowded agenda: Morning: (A) focused on infrastructure and integration issues Afternoon: (B) Common 6x6 and 3x1 session, progress on detector instrumentation (C) 3x1 Specific session Cosmic ray measurements and large area trigger counters talk added at the last moment to first morning session A B C