P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010.

Slides:



Advertisements
Similar presentations
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
Advertisements

CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/27 A Control Software for the ALICE High Level Trigger Timm.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
ALICE Data Challenge V P. VANDE VYVRE – CERN/PH LCG PEB - CERN March 2004.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Artdaq Introduction artdaq is a toolkit for creating the event building and filtering portions of a DAQ. A set of ready-to-use components along with hooks.
System performance monitoring in the ALICE Data Acquisition System with Zabbix Adriana Telesca October 15 th, 2013 CHEP 2013, Amsterdam.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
1 Status report on DAQ E. Dénes – Wigner RCF/NFI ALICE Bp meeting – March
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
R. Divià, U. Fuchs, P. Vande Vyvre – CERN/PH 13 June 2012.
1 Alice DAQ Configuration DB
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
The ALICE DAQ: Current Status and Future Challenges P. VANDE VYVRE CERN-EP/AID.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
AFFAIR – fabric monitoring ROOT 2005 Tome Antičić Ruđer Bošković Institute, Zagreb,Croatia ALICE,CERN Tome Antičić Ruđer Bošković.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
NA49-future Meeting, January 26, 20071Ervin Dénes, KFKI - RMKI DATE the DAQ s/w for ALICE (Birmingham, Budapest, CERN, Istanbul, Mexico, Split, Zagreb.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
News on GEM Readout with the SRS, DATE & AMORE
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
P. Vande Vyvre – CERN/PH CERN – January Research Theme 2: DAQ ARCHITECT – Jan 2011 P. Vande Vyvre – CERN/PH2 Current DAQ status: Large computing.
LHC experimental data: From today’s Data Challenges to the promise of tomorrow B. Panzer – CERN/IT, F. Rademakers – CERN/EP, P. Vande Vyvre - CERN/EP Academic.
Pierre VANDE VYVRE for the O 2 project 15-Oct-2013 – CHEP – Amsterdam, Netherlands.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
ALICE Online Upgrade P. VANDE VYVRE – CERN/PH ALICE meeting in Budapest – March 2012.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
Monitoring for the ALICE O 2 Project 11 February 2016.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
ALICE O 2 | 2015 | Pierre Vande Vyvre O 2 Project Pierre VANDE VYVRE.
Workshop ALICE Upgrade Overview Thorsten Kollegger for the ALICE Collaboration ALICE | Workshop |
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
Barthélémy von Haller CERN PH/AID For the ALICE Collaboration The ALICE data quality monitoring system.
DAQ thoughts about upgrade 11/07/2012
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
ALICE Computing Data Challenge VI
ALICE moves into warp drive
PC Farms & Central Data Recording
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
Controlling a large CPU farm using industrial tools
ALICE – First paper.
IEEE NPSS Real Time Conference 2009
Commissioning of the ALICE HLT, TPC and PHOS systems
Dagmar Adamova (NPI AS CR Prague/Rez) and Maarten Litmaath (CERN)
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Experience between AMORE/Offline and sub-systems
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
ALICE Data Challenges Fons Rademakers Click to add notes.
Implementation of DHLT Monitoring Tool for ALICE
Presentation transcript:

P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010

Detectors participation to Physics runs CHEP – Oct 2010P. Vande Vyvre – CERN/PH2

Data taking with the whole ALICE CHEP – Oct 2010P. Vande Vyvre – CERN/PH3

Data Taking Status CHEP – Oct 2010P. Vande Vyvre – CERN/PH4 Total events collected: ~ 950 M 763 M INT1B: minimum bias 53.6 M MUS1B: single muon on INT M SH1B: high multiplicity (SPD) B = beams on both sides A and C > 700 TB of physics data All data read out are recorded

ALICE TRG/DAQ/HLT CHEP – Oct 2010P. Vande Vyvre – CERN/PH5 GDC TDSM CTP LTU TTC FERO LTU TTC FERO LDC BUSY Rare/All Event Fragment Sub-event Event File Storage Network PDS L0, L1a, L2 360 DDLs D-RORC EDM LDC D-RORC Load Bal. LDC D-RORC HLT Farm FEP DDL H-RORC 10 DDLs 10 D-RORC 10 HLT LDC 120 DDLs DA DQM DSS Event Building Network 430 D-RORC 125 Detector LDC 75 GDC 30 TDSM 18 DSS 60 DA/DQM 75 TDS Archiving on Tape in the Computing Centre (Meyrin)

SAN Evolution (1) CHEP – Oct 2010P. Vande Vyvre – CERN/PH6 FC4G 16 ports Server Storage FC4G 16 ports Server Storage (hw deployment 10-40% performance): - Storage Area Network (SAN): 1-4 FC switches (16 FC4G, 4 FC10G) - Up to 30 servers - Up 30 storage arrays FC4G 16 ports Server Storage FC4G 16 ports Server Storage

SAN Evolution (2) CHEP – Oct 2010P. Vande Vyvre – CERN/PH7 FC4G 16 ports Server Storage Server Storage FC4G 16 ports Server Storage FC4G 16 ports Server Storage FC10G 4 ports FC4G 32 ports Server Storage Server Storage Server Storage Server Storage 2009: (hw deployment 100% performance) - 2 enterprises FC switches (8 slots, 16 FC4G, 4 FC10G) servers over FC4G - 75 storage arrays

Transient Data Storage CHEP – Oct 2010P. Vande Vyvre – CERN/PH8 Storage Area Network (SAN): 180 ports FC4G 75 Transient Data Storage (TDS) storage arrays each divided in 3 RAID6 volumes Nodes accessing data over FC4G: 75 data formatting and writing-only nodes (GDC) 30 reading-only nodes exporting data files to Permanent Data Storage (PDS) Unique logical view by cluster file sharing ! GDC TDSM GDC Storage Network (FC4G) TDS Event Building Network (Gbit Ethernet) 75 GDC 30 TDSM 75 TDS PDS Archiving on Tape in the Computing Centre

Cluster File System CHEP – Oct 2010P. Vande Vyvre – CERN/PH9 Cluster File System (Quantum StorNext): Sharing of ~1000 disks by ~100 PCs Global file system (system management) Preserve hardware performance Make file system across all Racks “R” global file space Add “AFFINITIES” Certain directories are bound to certain Containers C1C2C3C4 C5C6C7C8 C9C10C11C12 C13C14C15C16 C17C18C19C20 C21C22C23C24 R1 R2 R3 /filespace/global_file.raw /filespace/R3/C22/ /filespace/R3/C22/local_file.raw

Preparation of the Heavy-Ion Run CHEP – Oct 2010P. Vande Vyvre – CERN/PH10 Detector readout to DAQ Up to 4.5 GB/s With or without data compression DAQ to computing center Up to 2.5 GB/s CPU usage

Data Quality Monitoring CHEP – Oct 2010P. Vande Vyvre – CERN/PH11 CR1 ACR CERN CC CAF Generic GUI Detector Shifter DQM/QA Shifter eLogBook On-Call Experts Detector GUI Detector Shifter DQM/QA Shifter Detector Team Offline ACR Projector AliEve Expert Access CR2 HLT nodes Detector code DA/DQM nodes AMORE DB Detector QAs (expert & shifter) Detector agents DA’s Prompt Reco 2x Prompt Reco 2x Histo, objects Obj. Histograms DAQ Histo, ESD’s

AMORE: ALICE DQM framework CHEP – Oct 2010P. Vande Vyvre – CERN/PH12 For more information: Tuesday 14:30 in the Auditorium Generic GUI: - Multiple agents - Multiple tabs

Electronic Logbook CHEP – Oct 2010P. Vande Vyvre – CERN/PH13 - Portal to the ALICE online - Access from outside the experimental area 1 Run => 1 Line Run Details View

DQM access through the eLogBook CHEP – Oct 2010P. Vande Vyvre – CERN/PH14

Experiment Operation CHEP – Oct 2010P. Vande Vyvre – CERN/PH15 Shift crew of 24 people at startup: heavy load on the collaboration. Unsustainable for very long ! Large effort to improve the situation Experiment automation by extension of the Experiment Control System Combine shifts and train shifters Addition of a tool to configure the whole experiment: ALICE Configuration Tool (ACT) Shift crew reduced from 24 to 6 persons

ALICE Configuration Tool CHEP – Oct 2010P. Vande Vyvre – CERN/PH16 Global configuration of the whole ALICE experiment. For more information: Poster PO-WED-008 on Wednesday

ALICE Upgrade CHEP – Oct 2010P. Vande Vyvre – CERN/PH17 Different upgrades are considered for the ALICE detector Modification or construction of a new Inner Tracking System (ITS) Addition of a Forward Calorimeter (FOCAL) Addition of a Very High Momentum Particle Identification (VHMPID) Faster readout for the TPC No decision yet on any of the above DAQ R&D started: PC’s evolution: from PCI-X to PCI-e Address the detector upgrades: cheaper or faster readout Improve the data taking efficiency by extension or addition of new software packages Improve the data taking efficiency by improving the service management (e.g. ITIL) Explicit service definition Improve the quality of service From organic to a more conscious evolution

PC evolution from PCI-X to PCI-e CHEP – Oct 2010P. Vande Vyvre – CERN/PH18 Readout of all detectors using 2 Gb/s optical links and PC adapter PCI-X PC evolution: PCI-e version of the adapter PCI-X 64 bits 100 MHz PCI-e 4x

Detector Readout Upgrade CHEP – Oct 2010P. Vande Vyvre – CERN/PH19 More options for the detector readout Legacy: DDL Low-cost: Ethernet/IP readout R&D for a High-End option: CERN PH-ESE versatile link Common DAQ and HLT RORC with 6 Gb/s links 10 Gb Eth (See below performance of DATE with 10 Gb Eth/IP readout)

Conclusion CHEP – Oct 2010P. Vande Vyvre – CERN/PH20 Lots of progress since startup Lots of pp data collected (close to the target of 10 9 pp events for year 1) DAQ includes a high performance storage system Ready for the Heavy Ion run ! Work has started on the upgrade