DPF2000 ATLAS Pixel Detector M. G. D. Gilchriese Lawrence Berkeley National Laboratory August 2000.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

The ATLAS Pixel Detector
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
M. Gilchriese Evaporative Cooling Tests of Pixel Disk Sectors June 2000 E. Anderssen, M. Gilchriese, F. Goozen, F. McCormack, J. Taylor, T. Weber, J. Wirth.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Mechanics and Cooling of Pixel Detectors Pixel2000 Conference Genoa, June 5th 2000 M.Olcese CERN/INFN-Genoa.
July 21, 1999 Silicon Subsystem M. G. D. Gilchriese.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 A brief overview of the ATLAS Pixel Detector.
P i x e l C a r m e l Sept. 9, 2002M. Garcia-Sciveres - The ATLAS Pixel Detector1 The ATLAS Pixel Detector Pixel 2002 Workshop M. Garcia-Sciveres.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
M. Gilchriese Pixel Detector Status ATLAS Collaboration Meeting BNL June 5, 2001.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
M. Gilchriese - November 14, Module Decision - To Do List By pixel meetings associated with February 22-26, 1999 ATLAS week Beyond making and testing.
Director’s Review November 1999 ATLAS Physics Division Staff M. Barnett, D. Bintinger, N. Busek,A. Ciocio, K. Einsweiler, M. Gilchriese, F. Goozen, C.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Detector building Notes of our discussion
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Adapting the via last Design
P. Calafiura, C. Day, C. Leggett, J. Milford, D. Quarrie, C. Tull
Presentation transcript:

DPF2000 ATLAS Pixel Detector M. G. D. Gilchriese Lawrence Berkeley National Laboratory August 2000

DPF  m ATLAS - Pixel Detector Inner Detector Rapidity coverage < |2.5| About 10 8 pixels. 3 barrel layers, 2x5 disks Innermost barrel layer insertable from outside Inner Detector About 2 m 2 active area About 2,000 modules Pixel Detector ATLAS Detector

DPF Pixel Concept and Institutions Barrel region Disk region LHC radiation levels prevent long-term operation of silicon strip detectors for R< 25 cm Pixel detectors with much smaller cell size(and lower capacitance) yield almost order of magnitude better signal-to-noise and thus potential for greater radiation resistance. Radiation hard(25-50 MRad) everything - electronics, sensors, mechanics. Collaborating Countries and Institutions Canada(Toronto), Czech Republic(Academy of Sciences-Institute of Physics, Czech Technical University, Charles University), France(CPPM-Marseille), Germany(Bonn, Dortmund, Siegen, Wuppertal), Italy(Genoa, Milan, Udine),Netherlands(NIKHEF) United States(Iowa State, LBNL, New Mexico, Ohio State, Oklahoma, SUNY-Albany, Wisconsin)

DPF Pixel Module Power/DCS flex cable Bias flex cable Optical fibers Front-end chips Clock and Control Chip Optical package Interconnect flex hybrid Wire bonds Resistors/capacitors Temperature sensor Silicon sensor Module is basic building block of system Major effort to develop components and assemble prototypes. Optical components likely to move off module

DPF Pixel Electronics and Modules Full-scale rad-soft electronics prototypes fabricated in rad-soft technologies in 1998 and tested extensively, including with irradiated detectors, since then. Bare 16-chip modules 16-chip modules with flex hybrid Dozens of single chip/sensor assemblies of different types

DPF Pixel Electronics General features –Active matrix 18x160 pixels –Inactive area for buffer and control –50x400 micron pixel size in prototypes and most of system. Goal of 50x300 microns innermost layer. Critical requirements –Time walk <20 ns –Timing uniformity across array(<few ns) –Low threshold(2-3K e - s) –Threshold uniformity (implemented by having DAC in each pixel) –Low noise(<few hundred e) –Low deadtime(<1% or so) –Robust(dead pixel OK, dead column not good, dead chip bad) –All of the above at 25 Mrad or more Important requirements –Time-Over-Threshold(TOT) measurement of charge –Maximize active area –Die size with acceptable yield –Thin(150 micron goal)-less material 11mm 7.4mm

DPF Rad-Soft Prototype Summary Multiple versions(FE-A, B and C) fabricated by 1998 and tested extensively in test beams in 1998 and Bumped bonded to detectors, including irradiated detectors. 16 chip modules fabricated successfully, including with thin(about 150 micron) ICs In general, LHC specs have been met. Operation with thresholds around 3,000 electrons demonstrated Noise values electrons demonstrated. Threshold uniformity(with threshold tuning via 3 bit DACs in each pixel) also about 150 electrons. Proof-of-principle demonstrated.

DPF Test Beam Data - Efficiency Example Not Irradiated - Thr. 3 Ke Efficiency99.1% Losses0.9% 1 hit hits0.4 2 hits15.6not matched0.1 >2 hits1.7not in time0.4 Irradiated V bias = 600 V Fluence n/cm 2 - Thr. 3 Ke Efficiency98.4% Losses1.6% 1 hit hits0.4 2 hits3.1not matched0.0 >2 hits1.1not in time1.2

DPF Rad-Hard Electronics Status Transition to rad-hard electronics started in early First full prototype(FE-D1) submitted to Temic(DMILL process) in August and received in October Most of the functionality of the chip was OK but –some design errors(relatively benign but slowed down testing) –yield was miserable, essentially zero –nevertheless some chips bonded to detectors and tested to extent possible Very detailed investigations by ATLAS and vendor to understand why yield so poor, including additional wafer fabrication at Temic’s expense. Hints but no definitive understand by vendor(or us) of why yield is so poor. Design errors fixed, two versions of chip to perhaps isolate areas of concern, dedicated test devices, revised optical chips and module control chip….new run submitted to Temic on July 26, wafers back early October. Temic will also process additional wafers themselves with process variations to attempt to identify origin of yield problem. So, if lucky, will have idea about viability of this approach with Temic by end of the year.

DPF More Rad-Hard Electronics Status It has been our policy to pursue at least two rad-hard vendors for the rad- hard chips. Design of front-end chip in Honeywell Silicon-on-Insulator technology advancing well –Denser technology than Temic(easier to cram functionality into pixel) –Preliminary indications are that more rad-hard –But more expensive(for same yield) –Submission of full prototype(FE-H1) on track for October, wafers to arrive early Third possibility is 0.25 micron processes(eg. IBM), for which there has been considerable recent success(BTeV pixel prototypes, CMS silicon strip readout…). Design of full-prototype in this process, FE-I1, will begin late September with target of submission for fabrication by June Can’t continue with three vendors, so must decide which to keep when test data available –Temic by end 2000 –Honeywell by mid 2000 –0.25 micron by end 2000 Will consider using two vendors for final production. Safety. Schedule.

DPF ATLAS Pixel Mechanics Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56) x5 x3 LBNL Europe Final assembly at CERN

DPF ATLAS Pixel Mechanics - Goals Large heat load - 15kW - from electronics But must keep silicon detectors below 0 0 C. Low radiation length/interaction length as possible Ultra-stable structure. Instrinsic resolution(in  ) about 10 microns. Low coefficient of thermal expansion, coefficient of moisture expansion…build at room temperature but operate cold and dry. This has led us to –Integrated mechanics and cooling –Use of carbon-carbon material(high thermal conductivity+stiffness) for local cooling/supports –All carbon(carbon-carbon or carbon fiber) structures.

DPF US Pixel Mechanics Prototypes Prototype end frame section fabricated by December Thermal/mechanical prototype disk fabricated and tested successfully for stability. Second full prototype disk to be tested by next month. Evaporative cooling tests of disk sectors successfully done.

DPF Disk Sector Concept Combined structural support with cooling. Carbon-carbon faceplates. Front and back faceplates offset in phi to provide full coverage(no gaps). Reticulated carbon foam CVD densified between faceplates. Aluminum coolant tube between faceplates. Three precision support points to disk ring. Modules mounted on both sides.

DPF Capillary(0.030” ID 1.2 m long) Exhaust lines IR Thermography Cooling Tests Cooling is provided by evaporation of C 3 F 8. This minimizes radiation length of coolant, avoids water.

DPF Status Summary Silicon detectors –Ready to start preproduction in next month. Modules –Assembly techniques understood although more experience needed, ready to begin preproduction early next year. Mechanics –Ready to start production early next year. Electronics –Rad-soft prototype IC program very successful –Off-detector electronics advancing well, ready to begin production mid- next year. –Transition to rad-hard ICs slower and more difficult than we would like but still advancing steadily, but must cope with impact on overall schedule.