The 7th CJK NGN Working Group Meeting October 10 ~ 11, Tokyo, Japan CJK NGN Test-bed Activity Status Report 2006. 10. 11 Taesang Choi

Slides:



Advertisements
Similar presentations
Integrated Management for the Next Generation Network
Advertisements

Telekom Malaysia’s NGN Implementation Plan
Figure 7-1 Softswitch Components Signaling Gateway Feature Server Softswitch Universal Media Gateway SGCP SIP MGCP MGCP (Media Gateway Control Protocol)
SIP & SS7 (SIP-02) Monday - 09/10/07, 10:00-10:45am.
Security in VoIP Networks Juan C Pelaez Florida Atlantic University Security in VoIP Networks Juan C Pelaez Florida Atlantic University.
1 Overview of Multiservice Switching Forum (MSF) Technical Activities and Direction Dave McDysan, WorldCom Technical Committee Chair Dave McDysan, WorldCom.
VoIP Network Diagram Internet PSTN Network DVX
AIMS Workshop Heidelberg, 9-11 March /20 A Telecom and IP Project from ETSI Gerald Meyer
Presents H.323 Forum ETSI TIPHON Presented by: Richard Brennan - Telxxis LLC Vice-Chair ETSI-TIPHON.
Why Converged Networks Make Sense: VoIP a First Step July 26, 2006.
Overview Of NGN & IP TAX.
 3G is the third generation of tele standards and technology for mobile networking, superseding 2.5G. It is based on the International Telecommunication.
Voice over Internet Protocol (VoIP) Training and Development.
Information and Communication Networks Challenges and Opportunities Advantages of a new architectural paradigm PSTN Switch Line Card Trunk I/F Line Card.
Advanced Signalling Research Lab. Fall ‘99 VON VON protocols - SIP Gonzalo Camarillo Atlanta September 28th, 1999 Gonzalo Camarillo
© 2009 Avaya Inc. All rights reserved. Introduction to SIP Trunking Alan Klein Consulting Systems Engineer February 2009.
1 Leveraging SS7 to Deliver IP Services Carl Bergstrom Director – IN & IP Services VeriSign Telecommunication Services Internet Telephony Conference, February.
NGN Work in ITU-T SG Yukio Hiramatsu Chairman of ITU-T SG11 1GSC-9, Seoul SOURCE:ITU-T TITLE:NGN Work in ITU-T SG11 AGENDA ITEM:5.0 CONTACT:Yukio.
 oft  P. Verbeeck/L. Schatteman - March 2000 All rights reserved © 2000, Alcatel, Antwerp. Selim SARPER - Program Director & ARGE Müdürü
NGN Next Generation Network (NGN) is a service oriented network.
11/21/991 PSTN A T1 (1.5 Kbps) is a time-multiplexed signal of 24 DS0 (64 kbps) A T-S-T (Time-Space-Time) division multiplexed switch maps bits arriving.
Next Generation Networks NGN Services Capabilities PTCL Training & Development1.
Peering & Routing Designs Using Session Controllers & Media Gateways James Rafferty Voice Peering Forum March 8, 2007.
VoIP Technology Briefing
Quintum Confidential and Proprietary 1 Quintum Technologies, Inc. Session Border Controller and VoIP Devices Behind Firewalls Tim Thornton, CTO.
Introduction to SIP Based ENUM IP Telephony Infrastructure 資策會 網路及通訊實驗室 Conference over IP Team 楊政遠 博士
Copyright  StarVox, Inc, - All Rights Reserved- Services Platform Requirements for for Next Generation Networks Next Generation.
PTCL Training & Development
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test Scenario Proposal by TTA Taesang Choi
The 11th CJK NGN-WG Meeting 1 11 th CJK NGN-WG (CJK NGN Test-bed Activity Report) CJK NGN Test-bed Ad-hoc Group.
What is SIGTRAN?. SIGTRAN Signaling Transport (SIGTRAN) is an Internet Engineering Task Force (IETF) standard for transporting Public-Switched Telephone.
PTCL Training & Development
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
TBE 2710 Chapter 12 Signaling.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test-bed Proposal by TTA Taesang Choi
Softswitch SIP Proxy Server Call Manager IP Telephony Router Tablet PC IP PBX Class 5 Switch Class 4 Switch PBX Access Gateway Broadband Router Voice Gateway.
PTCL Training & Development
Samsung Communication Manager Active-Active System Constraints Mar
A Signaling Architecture for All IP Wireless Networks ITSUMO Group An SAIC Company.
Ikhlaq Sidhu, Ph.D. Vice President, S4 Division Personal Connectivity Business Unit March 1999 ® SIP Update VON Europe 99.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Multimedia Access Platforms Glen Freundlich Avaya, Inc.
A Scalable SIP-based Architecture to Offer Value-added Services in a Converged IN/IP Environment F.S.Salloum, Tasos Dagiuklas, Maria Skoura 16 January.
PTCL Training & Development1 Introduction To Gateways.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
CJK test-bed study Service control based on MPM-RACF communications Test-bed Ad-hoc Group Hideaki YAMADA, Norihiro FUKUMOTO KDDI (KDDI R&D.
SIP & How It Relates To YOUR Business. Jeff S. Olson Director of Marco Carrier Services David Bailey-Aldrich Technology.
NGN Economics and Network Evolution
HOW TO GUIDE: INEXPENSIVE INTERNET PROTOCOL TELEPHONY SOLUTION Created by: Cameron Adkisson Eastern Kentucky University
RACF Considerations in CJK NGN Test-Bed Youngwook Cha, Taesang Choi, Youhyeon Jeong
Voice services in NGN/IMS architectures March 2008.
1 © 2003, Cisco Systems, Inc. All rights reserved. CISCO CONFIDENTIAL Cisco SP Voice solutions Review Ching-Ying Tong
CJK NGN Test-bed Activities Phase I & II Testing Result
CJK NGN Test-bed Ad-hoc Group
Evaluation Scenarios of the CJK NGN Test-bed
CJK test-bed study based on MPM
IP Telephony (VoIP).
CJK NGN test-bed study Phase Ⅲ&Ⅳ
NGN Deployment for China Mobile
Status report on CJK NGN Working Group
NET 3710 Signaling.
CJK NGN test-bed study Phase III&IV
Status report on CJK NGN Working Group
Proposal for the CJK NGN Test-bed Activity
Mixing Calling Plan and Direct Routing connectivity for the same user is optional, but could be useful, for example, when the user is assigned a.
Taesang Choi CJK Testbed Collaboration for NGN Taesang Choi
Liu Duo CJK4_014 NGN activities in CCSA Liu Duo
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Presentation transcript:

The 7th CJK NGN Working Group Meeting October 10 ~ 11, Tokyo, Japan CJK NGN Test-bed Activity Status Report Taesang Choi

7 차 CJK NGN Working Group Meeting 2 Topics Brief Overview of Agreed Action Plan until 6 th NGN WG Meeting at Hangzhou, China CCSA’s Proposed Testing Lab Architecture and Scenarios ETRI’s Proposed Testing Lab Architecture and Scenarios Network Connectivity and Initial Testing Results Next Steps

7 차 CJK NGN Working Group Meeting 3 Test Scenarios Scenario 1: Single Call Server within a single NGN Network Domain without PSTN Scenario 2: Call Servers across multiple IP Network Domains without PSTN Scenario 3: Single Call Server within a single NGN Network Domain with PSTN Scenario 4: Call Servers across multiple NGN Network Domains with PSTN Scenario 5: Call Servers across multiple NGN Network Domains with PSTN & Value Added Services –This scenario adds Value Added Services to scenario 4 using Media Servers and Application Servers Scenario 6: Performance Evaluation Scenario 7: Call Servers across multiple NGN Network Domains with PSTN, Value Added Services and RACF Involvement

7 차 CJK NGN Working Group Meeting 4 Testing Schedule Phase I: rd /4 th Quarter –Network Connectivity –Senario1 only –First Report/Demo during 8 th CJK NGN Meeting (January 2007) Phase II: st /2 nd Quarter –Scenario 2 ~ 4 –Second Report/Demo during 9 th CJK NGN Meeting Phase III: rd /4 th ~ st /2 nd Quarter –Scenario 5 ~ 7 –Testing details will further be defined depending on the technology availability status –Third Report/Demo 11 th CJK NGN Meeting

7 차 CJK NGN Working Group Meeting 5 Working Plan Organize an engineering team to finalize network configuration, test scenarios, and items Initiate Phase I working plan Report the progress status to CJK NGN WG periodically via the WG reflector Report the result of Phase I work to 8 th CJK NGN WG

7 차 CJK NGN Working Group Meeting 6 CCSA CS Architecture IP Network Lanswitch FE PSTN SoftX3000 SIGTRAN U-NICA MRS6100 IOSS OpenEye SoftPhone VedioPhone IAD STUN Lanswitch SCP SG7000 STP UMG 8900+UA5000 POTS / BRI/ADSL … Lanswitch Eudemon MGCP UMSN2000 SIP/MGCP /H.248/H.323 SIP MGCP H.248 ISUP INAP FTP/FTAM E1 SNMP USAU ISUP SIGTRAN SIP H.323

7 차 CJK NGN Working Group Meeting 7 CCSA Testcase Proposal NumberServiceCombinationTest case Basic voice callMGCP IAD–H.248 AG or IADNormal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist MGCP IAD–SIP phoneNormal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist SIP phone–H.248 AG or IADNormal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist

7 차 CJK NGN Working Group Meeting 8 CCSA Testcase Proposal PSTN user – SIP phoneNormal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number doesn’t exist Multimedia callSIP phone – SIP phone FaxIAD/AG–IAD/AGIncluding G.711 and T.38

7 차 CJK NGN Working Group Meeting 9 ETRI’s CS Architecture SCP STP Circuit Switch TG SG Softswitch Application Server Back-End Servers SIP Network SSW Network H.323 Network External IP Network H.323 SIP-T H.323 BICC* SIP(-T) OSA/Parlay SIP(-T) SS7 ISUP/TCAP/SCCP AIN INAP Sigtran (SCTP/M3UA) SS7 TDM (ISUP) INAP MS/IVR SIP MGCP H.248/Megaco SIP H.323 MGCP H.248/Megaco* MGCP H.248/Megaco BSSNMS FTP or Proprietary SNMP 3 rd Party Application Server SIP Server SSW GK Server SIP Diameter RADIUS Proprietary Residential Access Enterprise Access GK IP-PBX SIP(-T),H.323 OSA/Parlay Gateway AG / RG SBC

7 차 CJK NGN Working Group Meeting 10 CCSA Testcase Proposal NumberServiceCombinationTest case Basic voice callMGCP IAD–H.248 AG or IAD Not Available by ETRI Normal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist MGCP IAD–SIP phone Available only for SIP phone in ETRI side Normal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist SIP phone–H.248 AG or IAD Available only for SIP phone in ETRI side Normal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number does’t exist

7 차 CJK NGN Working Group Meeting 11 CCSA Testcase Proposal PSTN user – SIP phone Available by ETRI Normal call Abnormal call- the called party is busy Abnormal call- no answer Abnormal call- the number doesn’t exist Multimedia callSIP phone – SIP phone Available by ETRI FaxIAD/AG–IAD/AG Not Available by ETRI Including G.711 and T.38

7 차 CJK NGN Working Group Meeting 12 Border Router CERNET Meeting Room Internet PSTN 모델망 Support Facility Management/ Monitoring System, GW, SIP phones, … 100BT 2G Ethernet 155M POS, GRE Tunnel between and BTE1 TDM Signaling Link Bearer Link SG/TGRACFCSPacket Monitor GBE, 100BT, 10BT AS/MS 100BT GBE SBC 100BT L2 스위치 100BT(VLAN) Japan ETRI’s CS Lab Network Configuration /16 CCSA CS Lab x – Call Server – SIP Terminal

7 차 CJK NGN Working Group Meeting 13 Engineering Team Work Status CS Labs Network Connectivity Test done on 9/22/06 RTNET connects APII via CERNET ETRI connects APII via KOREN Since CCSA CS Labs uses private addresses, GRE tunnel between ETRI’s CS Labs and its router is used The network connectivity test was successfully completed The first test was agreed to perform the 2 nd scenario with SIP phones only Due to the lack of time (long holiday for both CCSA and TTA), more detailed testing will be conducted after this meeting until the end of The results will be reported at the 8 th CJK NGN WG meeting.

7 차 CJK NGN Working Group Meeting 14 Next Steps Need to work on testing item details such as defining URI format for other testing scenarios ETRI’s CS Labs needs to upgrade SW version to meet the testing requirements proposed Actual testing will mostly be conducted mainly on November and December when NGN GSI October meeting ends Need to incorporate new testing cases if agreed during this meeting