City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.

Slides:



Advertisements
Similar presentations
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Advertisements

The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Duane Hill, District Engineer
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Wastewater Treatment & Collection System Improvements.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY, PETALUMA, CA North Bay Watershed Association December 7, 2007.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
STH 29 and CTH O Construction Project Manager: Richard Simon Project Leader: Dave Julson.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Nick Johnson, PE Senior Project Manager October 1, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
F ACILITIES, P LANNING, AND C ONSTRUCTION November 16, 2015 – Monthly Construction Report Report.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY PETALUMA, CA North Bay Watershed Association Conference April 9, 2010.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Wastewater Treatment Plant Background Slide #1 5/27/2004 CITY OF GALT public works Wastewater Background May 2004.
Stormwater Management
WATER – WASTEWATER TREATMENT EXPERIENCE
Town of Brighton, Department of Public Works
Filter Rehabilitation and Seismic Upgrades – Construction Update
Bond Oversight Committee
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Manchester’s CSO Program: A Look Behind and a Look Ahead
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Meeting of the LCLS Facilities Advisory Committee
Illinois Waterway 2020 Consolidated Closure
Wastewater Facilities Upgrade Project
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Delta Water Supply Project
Coronado Elementary School Project Status
Minuteman Vocational Technical Regional High School Progress
Capital Improvement Plan April 9, 2018 Status Update
Richland Creek Water Supply Program Program Update
Stream Crossing Replacement Policy
May 9, 2019.
Presentation transcript:

City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006

pet1106i ppt/2 Overview of Construction Status Work progressWork progress ScheduleSchedule Project administrationProject administration  Submittal status  Field/change orders CostsCosts Anticipated workAnticipated work

pet1106i ppt/3 Ellis Creek North Crossing 42” secondary effluent42” secondary effluent 16” 42” headworks16” 42” headworks 20” recycled water20” recycled water Road for project construction trafficRoad for project construction traffic

pet1106i ppt/4 Site Grading West access roadWest access road  Aggregate base Polishing treatment wetlandsPolishing treatment wetlands Construction roadsConstruction roads

Headworks Facility Slab on grade grit areaSlab on grade grit area First wallsFirst walls

Oxidation Ditches Oxidation Ditch No. 1Oxidation Ditch No. 1  36 of 65 walls Oxidation Ditch No. 2Oxidation Ditch No. 2  21 of 57 walls

pet1106i ppt/7 Secondary Clarifiers 10 of 12 walls No. 110 of 12 walls No. 1 7 of 12 walls No. 27 of 12 walls No. 2

Filter Support Building Slab on grade pouredSlab on grade poured

pet1106i ppt/9 UV Disinfection Facility 65% of walls completed65% of walls completed

pet1106i ppt/10 Thickener Building Slab on grade lower sumpSlab on grade lower sump Walls sump areaWalls sump area

pet1106i ppt/11 O&M Building Maintenance wallsMaintenance walls Block walls continuedBlock walls continued

pet1106i ppt/12 Yard Piping 23,272 completed of 91,000 lf23,272 completed of 91,000 lf Access roadAccess road  12” water  4” natural gas

pet1106i ppt/13 Yard Piping (cont.) 20” Urban recycled water20” Urban recycled water 12” 3W12” 3W

pet1106i ppt/14 Yard Piping (cont.) 42” polishing wetland effluent42” polishing wetland effluent 26” effluent pipe at pond 9 and pond 1026” effluent pipe at pond 9 and pond 10

pet1106i ppt/15 Electrical Duct Banks West of ox ditch 2West of ox ditch 2 South of headworks to south Creek crossingSouth of headworks to south Creek crossing 8,189 of 46,000 lf8,189 of 46,000 lf

pet1106i ppt/16 Existing Pond Facility Modifications Wetland pump stationWetland pump station  Slab on grade poured  Walls started Pond 8 to Pond 9 LeveePond 8 to Pond 9 Levee  Finished pile installation  Pond 8 returned to operations Aerated lagoonAerated lagoon  Inlet structure formed and poured Pond 1Pond 1  7 horizontal brush aerators installed

pet1106i ppt/17 Schedule Notice to Proceed – October 10, 2005Notice to Proceed – October 10, 2005 Base contract duration 1,278 daysBase contract duration 1,278 days Original completion date – April 9, 2009Original completion date – April 9, 2009 Time extension authorized – 46Time extension authorized – 46 Revised duration – 1,324Revised duration – 1,324 Revised completion date – May 25, 2009Revised completion date – May 25, 2009 Weather days included in base duration – 40Weather days included in base duration – 40 Weather days expended – 78Weather days expended – 78 Time expended – 355 daysTime expended – 355 days Percent time expended – 28%Percent time expended – 28% Work remains on scheduleWork remains on schedule

pet1106i ppt/18 Costs Base Contract Amount $110,329,000Base Contract Amount $110,329,000 Change Orders Authorized $750,576Change Orders Authorized $750,576 Total Contract Cost $111,079,576Total Contract Cost $111,079,576 Percent Change to Date of Original Contract0.68%Percent Change to Date of Original Contract0.68%

pet1106i ppt/19 Project Administration - Programming SCADA screensSCADA screens  Speed control  Analog set point  Lead/Lad, Duty/ Standby Configuration of PLC 1,3,5,6,7,8,9Configuration of PLC 1,3,5,6,7,8,9 PLC2 75%PLC2 75%  WAS/RAS pumping  Aerator call order

pet1106i ppt/20 State Revolving Loan Fund Update Requested $5,173,877Requested $5,173,877 SRF will save over $60 million in interest versus revenue bondsSRF will save over $60 million in interest versus revenue bonds

pet1106i ppt/21 Project Administration SubmittalsSubmittals  Received 510  Reviewed and returned 445  Pending 64 Field ordersField orders  25 active  Total estimated cost $169,800

pet1106i ppt/22 Change Order Summary Authorized $750,576Authorized $750,576 This month $292,655This month $292,655 HighlightsHighlights  Levee repair Pond 8 to Pond 9 ($289,279) Anticipated next monthAnticipated next month  Lower invert elevation influent line ($17,290)  West access culvert ($20,000)  PG&E connection West Access Road ($20,000)  Oxidation Ditch Anchorage ($39,942)  O&M Bldg beam seats wall pockets ($20,000)  Two deductive changes (-$120,000) -Corrugated HPDE pipe for storm drains -Large Diameter HPDE thickness change

pet1106i ppt/23 Project Management Team $4,701,586 $187,130 $31,377 $34,505 $85,676 $4,362,898 September $40,494,241 Total $1,887,439 Construction Manager Covello $676,257ProgrammerArcSine $477,853EnvironmentalESA $1,674,122EngineerCarollo $35,778,570Contractor Kiewit Total Earned RoleTitle

pet1106i ppt/24 Anticipated Work for October Creek crossingsCreek crossings  Removed and restored West access roadWest access road  Paving, curbs, sidewalks HeadworksHeadworks  Walls Oxidation ditches/secondary clarifiersOxidation ditches/secondary clarifiers  Walls O&M buildingO&M building  Masonry block walls Thickener buildingThickener building  Sump walls

pet1106i ppt/25 Anticipated Work for October (cont.) Main electrical buildingMain electrical building  Excavated Electrical building (MCC9)Electrical building (MCC9)  Excavated  Duct bank UV buildingUV building  Channel walls  Floor Existing pond siteExisting pond site  Pond 9 and 10 planting  Pond 9 pump station walls  Electrical work at aerated lagoon pond 1

pet1106i ppt/26 Anticipated Work for October (cont.) Boiler buildingBoiler building  Excavation Storm water pump stationStorm water pump station  Tie in lines from oxidation ditch area Yard pipingYard piping  27” storm water pipe north of pump station  Bridge over storm water pipes  Culvert at main entrance  Pond 9 and Pond 10 Levee 42” and 26”  Pond 9 and Pond 10 double contained pipe  Connections to thickener building  Connections at filter support building  In-plant pump station to headworks

pet1106i ppt/27 Questions?