Phase II and Compost Facility Upgrade Projects February 16, 2012.

Slides:



Advertisements
Similar presentations
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Nutrient Issues at the Blue Plains WWTP February 2004.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
SEWER DEPARTMENT FY 2008/09 BUDGET WORKSHOP April 9, 2008.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Response to LDEQ Consolidated Compliance Order and Notice of Potential Penalty.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Wastewater Fund. Wastewater Revenue $296,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
Wastewater Treatment & Collection System Improvements.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
The City of North Bend Sanitary Sewer System
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
City of Norman Energy Management EPA Region VI Pretreatment Workshop August 4, 2010.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
Building A Better Biosolids Future. A Brief History Sewage Treatment in Detroit  “ The Grand Sewer” 1836  The Fairview Sewer 1913  The Detroit WWTP.
Energy Audits for Water and Wastewater Utilities US EPA Region 1 New England MA DEP-DOER-EOEEA.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Jen Muir JKMuir, LLC Leo H. LeBoeuf CL&P
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Project History Town of Newport Population: 550 Vermillion County Seat.
January 6,  INTRODUCTION  OVERVIEW OF FUNDS  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ Background Information and Capital Projects ◦
Persevering to Get What You Need Mark Estes HCSA Executive Director Scott Ehrhardt P.E, George Anipsitakis PhD P.E, HCSA Maple Ave Regional WWTP Expansion.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Ledyard Wastewater Facilities Management Plan A Presentation to the Ledyard Town Council/ Water Pollution Control Authority By Maguire Group Inc. January.
Public Information Meeting Wastewater Treatment January 26, 2016.
CEE 426 September :05 PM UW Madison Room _____ Engineering Hall Energy in Wastewater Treatment Plants Thomas E. Jenkins, P.E. 1.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
TOWN OF TYNGSBOROUGH Ballot Question September 14, 2010 Capital Exclusion Overview.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
WATER SYSTEM WORKSHOP February 27, 2012
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Portugal Cove - St. Philip’s
Wastewater Fee Increases
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Recycled Water Project – Sharon Heights GCC
Sewer User Rate Increase PUBLIC HEARING
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Wastewater Facilities Upgrade Project
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
SEWER DEPARTMENT BUDGET WORKSHOP
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Capital Improvement Plan April 9, 2018 Status Update
The Project Overview and Status Report
Presentation transcript:

Phase II and Compost Facility Upgrade Projects February 16, 2012

Summary of Projects WW Phase I-Completed in Funded through capital reserve funds. Modified aeration system, removed Trickling Filter from service, and replaced secondary sludge dewatering equipment WW Phase I-Completed in Funded through capital reserve funds. Modified aeration system, removed Trickling Filter from service, and replaced secondary sludge dewatering equipment WW Phase II-Proposed for FY $4.2 million funded through SRF loan. WW Phase II-Proposed for FY $4.2 million funded through SRF loan. WW Phase III (final phase)- Proposed for FY $4.5 million. Replace clarifier drives, electrical upgrades, headwork's screening plant, sludge pump replacement WW Phase III (final phase)- Proposed for FY $4.5 million. Replace clarifier drives, electrical upgrades, headwork's screening plant, sludge pump replacement Compost Facility-Proposed for $2.875 million Compost Facility-Proposed for $2.875 million Thornton's Ferry and Souhegan Pump Station Upgrades- Proposed for $2.8 million Thornton's Ferry and Souhegan Pump Station Upgrades- Proposed for $2.8 million

Wastewater Facility Needs Forty two year old equipment needs replacing and in some cases is oversized for current flows and loads Forty two year old equipment needs replacing and in some cases is oversized for current flows and loads Necessary for continued compliance with the Town’s EPA discharge permit Necessary for continued compliance with the Town’s EPA discharge permit Upgrades and replacements will be paid for through sewer user fees; not through taxes Upgrades and replacements will be paid for through sewer user fees; not through taxes Estimated cost of Phase II is 4.2 million dollars Estimated cost of Phase II is 4.2 million dollars

Raw Wastewater Pumps Replace two old pumps with three more efficient pumps Replace two old pumps with three more efficient pumps Estimated cost is $606,000 Estimated cost is $606,000 Estimated annual electrical savings is $21,000 Estimated annual electrical savings is $21,000

Primary Clarifier Effluent Pumps Replace two old primary effluent pumps with three more efficient pumps Replace two old primary effluent pumps with three more efficient pumps Estimated cost is $575,000 Estimated cost is $575,000 Estimated annual electrical savings is $9,000 Estimated annual electrical savings is $9,000

Aeration System Replace 5 aeration blowers with more efficient blowers. Estimated cost is $993,000 Replace 5 aeration blowers with more efficient blowers. Estimated cost is $993,000 Replace 4 return sludge pumps. Estimated cost is $472,000 Replace 4 return sludge pumps. Estimated cost is $472,000 Modify aeration system with internal recycle pumps to reduce energy demand by 20%. Estimated cost is $794,000 Modify aeration system with internal recycle pumps to reduce energy demand by 20%. Estimated cost is $794,000 Overall estimated annual electrical savings is $30,000 Overall estimated annual electrical savings is $30,000

Plant Water System Replace original plant water system Replace original plant water system Estimated Cost is $242,000 Estimated Cost is $242,000 Estimated annual electrical savings is $2,500 Estimated annual electrical savings is $2,500

SCADA Improvements Supervisory Control and Data Acquisition Supervisory Control and Data Acquisition SCADA provides automated control of facility functions and unattended operation at night SCADA provides automated control of facility functions and unattended operation at night Estimated improvement cost is $229,600 Estimated improvement cost is $229,600

Dechlorination System Dechlorination is the elimination of free chlorine by adding sodium-bisulfite before discharge to the Merrimack River Dechlorination is the elimination of free chlorine by adding sodium-bisulfite before discharge to the Merrimack River Recommend installing new dechlorination facilities Recommend installing new dechlorination facilities Estimated cost is $198,000 Estimated cost is $198,000

Facility Lighting Based on recommendations in PSNH energy audit Based on recommendations in PSNH energy audit Replace existing lighting systems in all buildings with new and more efficient lights and motion sensitive lights Replace existing lighting systems in all buildings with new and more efficient lights and motion sensitive lights Estimated cost is $90,400 Estimated cost is $90,400 Estimated annual electrical savings is $5,000 Estimated annual electrical savings is $5,000

Summary for Phase II Upgrade Raw Wastewater Pumps $606,000 Raw Wastewater Pumps $606,000 Primary Effluent Pumps $575,000 Primary Effluent Pumps $575,000 Aeration Blowers $993,000 Aeration Blowers $993,000 RAS pumps $472,000 RAS pumps $472,000 Internal Recycle Pumps $794,000 Internal Recycle Pumps $794,000 Plant Water System $242,000 Plant Water System $242,000 SCADA $229,600 SCADA $229,600 Dechlorination $198,000 Dechlorination $198,000 Facility Lighting $90,400 Facility Lighting $90,400 Energy Savings (annual) $67,500 Energy Savings (annual) $67,500

Recommendation State Revolving Loan Fund (SRF) – 20 Year low interest %. Funds have been secured for this project if approved at Town meeting this year State Revolving Loan Fund (SRF) – 20 Year low interest %. Funds have been secured for this project if approved at Town meeting this year State Aid Grant - 20% grant payment or approximately $840,000. State legislature needs to reauthorize program and no payments have been made on new projects State Aid Grant - 20% grant payment or approximately $840,000. State legislature needs to reauthorize program and no payments have been made on new projects

COMPOST FACILITY UPGRADE February 16, 2012

Compost Facility Needs The existing composting building and equipment is now 18 years old and is in need of repair and replacement The existing composting building and equipment is now 18 years old and is in need of repair and replacement Wright-Pierce evaluated the condition of building and equipment in 2006 and developed a cost estimate and recommendations for necessary improvements Wright-Pierce evaluated the condition of building and equipment in 2006 and developed a cost estimate and recommendations for necessary improvements Building structure reviewed in September 2011 with cost estimate revised to $2.875 million Building structure reviewed in September 2011 with cost estimate revised to $2.875 million Upgrades and replacements will be paid for through sewer user fees; not through taxes Upgrades and replacements will be paid for through sewer user fees; not through taxes

Compost Facility Summary Summary of upgrades and associated costs: Summary of upgrades and associated costs: 1) Aeration blower replacement (75) 225,000 2) Biofilter Improvements 10,000 3) 2- new agitators 850,000 4) Structural Coating 1,024,000 5) Electrical Repairs 50,000 6) Control System Upgrade 185,000 7) Amendment Storage Shed Replacement 100,000 8) Engineering 431,000 $2,875,000 $2,875,000

Existing Composting Building

Alternative Disposal Options (in million dollars) Town operated compost facility $12.9 Town operated compost facility $12.9 Privately operated compost facility$13.1 Privately operated compost facility$13.1 Landfill $15.6 Landfill $15.6 Note: 20 year present value estimates Note: 20 year present value estimates

History of Wastewater Sludge Disposal Sludge has been composted for the past 30 years Sludge has been composted for the past 30 years Current facility began operation in 1994 in a totally enclosed metal building that is ventilated through a biofilter for odor control Current facility began operation in 1994 in a totally enclosed metal building that is ventilated through a biofilter for odor control Compost turner

Compost Building Condition Compost Building Condition Due to the moist and corrosive nature of the atmosphere, the building and equipment have shown signs of significant deterioration Due to the moist and corrosive nature of the atmosphere, the building and equipment have shown signs of significant deterioration

Revenues The Town generates up to $140,000 in additional revenue annually by composting outside sources of sludge The Town generates up to $140,000 in additional revenue annually by composting outside sources of sludge Compost revenues for 2011 were $103,000 Compost revenues for 2011 were $103,000 Revenues generated make composting the most cost effective, environmentally sound option Revenues generated make composting the most cost effective, environmentally sound option

Sewer Rates State annual average residential sewer rate is $500 State annual average residential sewer rate is $500 Merrimack annual residential sewer rate is $197 Merrimack annual residential sewer rate is $197 Merrimack ranks 103 lowest out of 109 NH communities that charge a sewer rate Merrimack ranks 103 lowest out of 109 NH communities that charge a sewer rate No Merrimack rate increase proposed for FY No Merrimack rate increase proposed for FY 12-13

Recommendation Recommendation Continue Town operated composting with facility improvements of $2.875 million Continue Town operated composting with facility improvements of $2.875 million 15 year Bond 15 year Bond