Operational experience with high power proton beams David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ADSR.

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

Front end test stand — WP2
ISIS Accelerator Division
IEC61508 at ISIS Bob Mannix (Controls Group) Alan Stevens (Accelerator Operations Group)
Ribbon Electron Beam Profile Monitor For Bunched Beam Tomography Muons, Inc. Innovation in research.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
ADSR systems and their contribution to our energy needs Roger Barlow DIUS visit Manchester, 16 th September 2008.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Operational experience with high beam powers at ISIS David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ICFA HB2008,
ADSRs and FFAGs Roger Barlow. 7 Jan 2008Workshop on ADSRs and FFAGsSlide 2 The ADSR Accelerator Driven Subcritical Reactor Accelerator Protons ~1 GeV.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Alexander Aleksandrov Oak Ridge National Laboratory
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Open Question: Should Fermilab consider joining the effort on R&D for Accelerator based Transmutation of nuclear Waste (ATW) Paul Lebrun - FNAL ● Context.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISIS Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement Rutherford Appleton Laboratory, Oxfordshire.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
ADSR: Accelerator Reliability Dr Rebecca Seviour Lancaster University & Cockcroft Institute.
Beam losses on ISIS and induced radioactivity from MICE David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC.
First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
FLDt First Line Diagnosis tool ‘The fault analysis tool for the ISIS Accelerator’ Update Oct 2014 WAO Mainz Julian Brower CEng FIET Section Leader ISIS.
ISIS operational update
Muon Ionisation Cooling Experiment Overview
Uppsala Commitment to ESS and FREIA Planning
Radiation protection of Linac4 M. Silari Radiation Protection Group
Targets & conversion to secondary radiation summary
Mathew C. Wright January 26, 2009
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
Maintenance at ALBA facility: Strategy for the conventional services
Joint session – Beta-beams
Presentation transcript:

Operational experience with high power proton beams David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ADSR workshop, Cambridge, 13 January 2009

2 High power proton accelerators used and proposed for: Spallation neutron sources (molecular studies) Neutrino factories (life, universe & everything) Tritium production Transmutation (nuclear waste) Electricity generation  review of high power proton accelerator operations ADSRs

3 Current high power proton accelerators: PSI (Villigen, Switzerland) LANSCE (Los Alamos) SNS (Oak Ridge) ISIS (RAL, Oxon.) J-PARC (Tokai-mura) Concentrating on user-facility accelerators Decreasing power

Guinness Book of Records — can no longer show this photo

5 ISIS — world’s most productive spallation neutron facility ISIS J-PARC, PSI, SNS ISIS:800 MeV protons on to tungsten targets, 0.2 MW TS-1, 0.16 MW, 40 pps; TS-2, 0.04 MW, 10 pps ~800 neutron experiments per year ~1600 visitors/year (~5000 visits) ISIS accelerators wholly for neutron factories Also muon factory Decreasing number of target stations

Rutherford Appleton Laboratory, looking north ISISDiamond

Rutherford Appleton Laboratory, looking north-east ISIS

70 MeV H – linac 800 MeV proton synchrotron TS-1

ISIS from air

View down north side of ISIS 70 MeV H – MeV linac

Superperiods 9, 0 and 1 of the ISIS 800 MeV synchrotron

ISIS TS-1 experimental hall

ISIS TS-2 experimental hall

14 Key dates: Dec. 1984, first beam to TS-1 Dec. 2007, first protons to TS-2 Aug. 2008, first neutrons from TS-2

15 How reliable is ISIS? Cf.big chemical plant (good performance)~80% oil refinery (good performance)~70%

16 How reliable is ISIS? Cf.big chemical plant (good performance)~80% oil refinery (good performance)~70% ISIS 10-year average availability: 88% (±6% stand. dev.)

17

18

19 How reliable is ISIS? Cf.big chemical plant (good performance)~80% oil refinery (good performance)~70% ISIS 10-year average: 88% (±6% stand. dev.) Cf. ILL reactor (Grenoble):

20 ISIS cf. other high power proton accelerators Lujan = neutron scattering centre at LANSCE (800 MeV protons, PSR) NuMI = Fermilab main injector (neutrino production) (120 GeV protons)

21 ISIS70 MeV H – linac0.2 MW MeV H + synchrotron J-PARC180 MeV H – linac0.2 MW GeV + 50 GeV synchrotrons LANSCE800 MeV H + /H – linac0.8 MW + accumulator ring (0.1 MW) PSI590 MeV cyclotron1.2 MW + 72 MeV injector cyclotron SNS1 GeV H – linac0.6 MW 2 + accumulator ring 1: For limited time during commissioning; ultimate design 1 MW with 400 MeV linac. 2: Still commissioning; 1 MW design operation.

22 Trips — require operator intervention to reset Inhibits — automatically reset after ~1 second No. of inhibits = several × no. of trips Inhibits:non-specific beam losses running near some edge

23

24

25

26

27 Trip and inhibit summaries: Trips longerAverage no. ofStandard thantrips per daydeviation 1 second hour hours hours Inhibits per day— automatically reset AverageSt. dev ~100 “beam offs” per day

Factors determining success of user facility

29

30 2/3 power law

31 Availabilities — good or bad — as they are because machine runs for only ~2/3 year per year Maintenance/shutdown ~1 week machine physics + run-up ~40-day cycle ~3-day machine physics 220 days running maximum — any more would have substantial resource implications In principle “just in time” preventative maintenance régime, but effectively partly/mostly responsive régime — too expensive otherwise ~5/year

32 Crew: 5 teams of 4 — 24 hours/day, 365 days/year — even during shutdowns (although shift size may reduce) Each team:Duty Officer Assistant Duty Officer Shift Technician Operations Assistant Team of 5 health physicists — one of whom on call Accelerator and target: ~30 people on call at any one time 24 hours/day, 7 days/week — 45 names Instruments, sample & environment: ~15 on call (TS-1) With TS-2, ~100 people total mostly “electrical”

33 Operating ISIS Beam losses Concentrated at one place — on collectors Imperative to keep beam losses low (~1 W/m) ISIS: ~1 kW lost, 163 m circumference, ~6 W/m ISIS only ~0.2 MW, but ×2 beam losses would make life very difficult (2–3 mSv annual dose limit) Protection from activated machine components Time, distance, shielding — elementary, but important Explicitly included in designs

34 12 “major” categories Always some arbitrariness

35

36

37 How improve ISIS accelerator availabilities? Subtract target down-time 88%  90% Money-no-object staffing 90%  95% ? Under-run equipment 4616 tetrodes (linac RF): mean life ~10–20k hours 4648 tetrodes (synch. RF, markedly under-run): mean life 68k hours (June 2004 data)

38 How improve ISIS accelerator availabilities? — 2 “Better” engineering What is “better”? Avoid “value engineering” PLC control systems not always better than old relay systems Sometimes simplicity best Minimise numbers of electrical connections Lots of off-line test/proving rigs, e.g. Run all tubes for 1000 hours before installation

39 How improve ISIS accelerator availabilities? — 3 Lots of warnings, e.g. Reflected RF powers increasing Water pump bearings becoming noisy Big transformers becoming hot But need staff on hand to act on warnings UPSs for sensitive plant Mains-dip crash-offs can give serious problems But resources needed to service UPSs Interlocks to trip off plant “gently” — not just make main contactor fall out Good water chemistry control

40 How improve ISIS accelerator availabilities? — 4 ~1-second trips — due to beam losses Often cause simply unknown Sometimes RF instabilities (but sometimes magnet PSUs) Mitigation from feedback systems already incorporated Sometimes bad electrical connections — high currents often involved Hitherto no real need to mitigate Tackle by redundancy? — provided common mode issues don’t dominate

41 Essential conclusions? Good engineering Lots of people Parallel accelerators (>2) Expensive!

42

43 Some relevant issues Plan in detail — break down into many sub-tasks — estimate radiation doses for each sub-task UK legal limit: 20 mSv/year RAL investigation level: 6 mSv/year ISIS practice: 3 mSv/year Design all new apparatus with active handling specifically in mind — e.g. Lifting lugs V-band not Conflat seals Ensure plenty of space around Detailed project management of task

V-band seals Conflat seals Lifting lugs Lifting lug

Long mechanical drives to reduce need to work close to high-radiation locations (e.g. when changing motor drives for beam collimators)

ISIS synchrotron room — originally built for Nimrod Ample space essential for repairs, exchange of large components, etc. Nimrod sector

Overhead cranes very important — especially for handling activated components Aim to have two in each area

Shielding Configurable shielding to reduce dose rates locally