FESS/Ops Shutdown Summary Nov 9 th, 2012. CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.

Slides:



Advertisements
Similar presentations
1 Compliance & Credits: The Tools, The Rules and How They Affect Your HUD Multifamily Housing Project (Real Estate Assessment Center Inspections) Presented.
Advertisements

ONE STOP Real Estate Services G ill G roup
Engineering Services Planning Limited
Substation L1/ MCC L1 Update March 21 st, Current Location.
Heating, Ventilating, and Air-Conditioning
Valley City State University | Facilities Services
Part III –Property Condition Report
HEAT PUMPS.
Utility Outage (Steam & Electrical) Commencing March 21, 2009.
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
MEP design Mechanical, Electrical, Plumbing. Often separate consultants Can be separate even within a single firm Often performed on a design-build basis.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Coastal Region Tornado Damage March 15, Plant McIntosh Steam Damage Notes verbatim from steam plant log book Bad lighting strike on unit. Mw’s dropped.
Air-Conditioning Control Systems
Booster System Basics: Constant Speed Systems
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Engineer Presentation
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
AIR CONDITIONING (COOLING)
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
INFRARED THERMOGRAPHY ELECTRICAL INSPECTIONS .
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
HVACR116 – Trade Skills Mechanical Drawings.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Utility Engineers, PC.  Generation  Transmission  Distribution.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
SERVICE ENTRANCE EQUIPMENT
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
Symbols and Room Finishes
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
S A Griffiths CM42 June 2015 Electrical & Control.
1 Taming the Data Center SDR 1.3 Butch Adkins Infrastructure & Operations.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Section 6: Air-Conditioning (Heating And Humidification)
Capital Projects Requests
CUB Outage Schedule April 21, 2006.
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
FRESNO COUNTY WEST ANNEX JAIL
Heating, Ventilating, and Air-Conditioning
Calculations: Transformers and Service Conductor Calculations
Adding Zones to Existing Systems
Presentation transcript:

FESS/Ops Shutdown Summary Nov 9 th, 2012

CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF – CUB Cooling Towers- Fill and Fan Sections Need Repair or Replacement, $43,000/Cell to Repair, $80,000 to Replace

CUB Status (Cont.) Cooling tower #7 Leaking at Seams, Contractor called in to assess. Cooling Tower Pump #2 (300 Hp., 8,260 GPM) – VFD rebuilt and Control card replaced, on line

CUB Cooling Outage/WH Fdr 44 Maintenance November 4 th,2012 – Installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet Completed This will now allow replacement of 4160 X 120 Volt Transformers without shutting down the entire 4160 Cabinet, Chillers and Experiments. – CUB cooling outage affected Wilson Hall, XG/LinAcc/Footprint Area, MI60, and MI65.

CUB Cooling Outage, (Cont.) – CUB Cooling Outage coordinated with the Annual Wilson Hall (FDR 44) Power Outage for Electrical Maintenance Scheduled for Nov. 4 th, 2012 Wilson Hall was without Power (Except for Emergency Generator Loads) and without Primary Cooling CD 5 th Floor and 8 th Floor computing rooms were down The XG/LinAcc/Footprint Area, MI60, and MI65 were without Primary Cooling. Mac Computer Room and XG Firus Room were provided with Spot Coolers The WH Comm. Center and Telecomm. Switch Rooms were provided Cooling from Emergency Generators and Spot Coolers

November 3 rd and 4 th 2012 FDR 40/FDR 44 and CUB Cooling Outages Feeder 40 – LINAC and X-Gallery X-Gallery Roof Drain Feeder 44 – Wilson Hall CUB Cooling Chiller Water Outage – 4160 Volt Isolation Barrier Installation

Feeder 40 November 3 rd Electrical Outage – Findings Lower LINAC Area Substation Y-L1 High Voltage Switch Failed to Operate Properly – CORRECTIVE: lubrication and exercising the switch 480 Volt Main Breaker Extremely hard to rack in/out– CORRECTIVE: lubrication and exercising the racking mechanism

Feeder 40 November 3 rd Electrical Outage – Findings Lower LINAC Area DHP-L2-2 (Asset L-128) 350 Amp Breaker – Breaker Handle Broke When Operating CORRECTIVE: Replaced handle

LINAC Lower Level 350 Amp Breaker Handle Replacement

LINAC North Stairway Lower Level Sump Emergency Pumping for Electrical Outage

X-Gallery Computer Room Roof Drain Piping ~ 40 years old, Extra Heavy Duty Cast Iron Piping, (note wall thickness)

X-Gallery Computer Room – Roof Drain Piping –Bad Lead Joint Cause of Failure

X-Gallery Computer Room Roof Drain Piping, Bad Lead Joint

CUB 4160 Started Cabinet - Exposed Vertical Bus

CUB 4160 Bus Barrier (before modification/additional Bus Protection) Initial installation design - This Portion of Bus left unprotected (Modification need)

CUB 4160 Bus w/additional Bus Protection at Top - Final Design Additional Barrier Fabricated Ventilation areas

CUB 4160 Cabinet Bus Barriers w/final modifications completed

Feeder 44 Outage - WH Basement Switchgear - High Voltage Section PM

Feeder 44 Outage – WH Basement Switchgear 480 Volt Breaker Inspections – Total of 16 Breakers Inspected / Cleaned / Tested (Replaced 3 Trip Devices – Found Defective during trip current testing)

Feeder 44 Outage – WH Basement Switchgear 480 Volt Breaker Inspections – Total of 16 Breakers Inspected / Cleaned / Tested

Feeder 44 Outage - WH Basement Switchgear WH Bsmt Xformer – 13.8 Kv 480 Volt (one of two transformers within)

Flex Bus Damaged by Transformer Failure (addition cable added for ampacity) ~1988?

Feeder 44 Outage - WH Basement Switchgear – Typical 480 Volt Cabling in back of Switchgear

Feeder 44 Outage - WH Basement MCC Thermal Imaging Report – AC1W MCC Main Breaker “A” Phase

Feeder 44 Outage - WH Basement MCC Thermal Imaging Report – Main Breaker Removed Due to “A” Phase Lug HOT

AC1 West Breaker - Broken Lug Bolt

No Head Markings on AC1 West Breaker Lug Bolt

Feeder 44 Outage – Exterior S&C 4 Bay Switch PM – DSTR-A02

Snakes Head Snakes Juice

S&C Switch Snake Phased Out!

S&C Switch Snake (under-rated conductor)

Mechanical – F3 Manhole- Sump Replacement, parts received, to be scheduled during Shutdown – PV07- MI60 Pump Vault 7, 150 Hp. Pond Pump Suction Valve won’t close, requires shutdown of both Pumps to repair Pump, replace valve, (need schedule for repair).

Mechanical (Cont.) – Site Wide Valve Exercising, V.I.P.E.R. Roll-out Annual Valve Exercising required by NFPA 25 Valve Intuitive Powered Equipped Rover (V.I.P.E.R.) Purchased, Software, Exercising Procedure and Commissioning Completed Domestic Water Valve Exercising in Village has been completed, Main Site WIP

Mechanical, (Cont.) Site-Wide ICW Flush Completed, Live Zebra Mussels Found at following locations: – IHFP-612Across from IARC/OTE – IHFP-107AP10 – IHFP-109AP30 – IHFP-110AP50 – IHFP-111AP0 – IHFP-185KRS – IHFP-203F0 – IHFP-041B0 – IHFP-113NE Wilson Hall – IHFP-106S Corner XG and TRG – IHFP-216D0 Outback

Tritium In Sewers (cont.) Tritium in the Sewers Source Identified as CUB Softener Sampling Discharges, (further testing required to verify as sole source).

Mechanical (Cont.) RHC5 XG Operators Room (Light Side) Reheat Coil #5 supplies 2 Registers to Operators Room and Abandoned ductwork above XG Computer Room, (at least 1 supply uncapped and open above dropped ceiling) RHC5 is currently held closed by having main air applied directly to the valve RHC5 could be re-enabled through installation of a pneumatic Thermostat locate in the Operators Room Since the Trunk line from AC2 is mostly blanked off above the Computer Room Ceiling, a solution to the Operators Area would be a re-route of this ductwork.

High Voltage/ Beam-line Maintenance Work – PM Lab A North Area, Labs A,B,C,D,E,F,G Affects NMS/Cryostat Bldg. Reschedule for March 2013

HVAC Site Wide Boiler Inspections, Nearing Completion CMTF HVAC Unit Warranty Repairs Completed – Gas Line relocation WIP (to allow access to Ctrl. Panel)

FESS/Ops Engineering NTSB Storm Water Pump Piping Completed CUB 95 Degree Booster LCW pump #3 Replacement, (Completed for 2 nd time) CUB 95 LCW System Filled, Circulating ~50% MI30 ICW Break at PIV44, WIP – ICW Off to MI20, 30, 31, 39, 40 AP10 ICW Break between PIV100 and 102 at MuCool, section of ICW Off, No Bldgs. affected

MI30 PIV44 Excavation

MI31 Sink Hole To Be Scheduled