DT calibration software: tentative release schedule S.Bolognesi & S.Maselli & G.Mila Alignement&Calibration Meeting, 25 January 2008, CERN.

Slides:



Advertisements
Similar presentations
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Advertisements

LAV contribution to the NA62 trigger Mauro Raggi, LNF ONLINE WG CERN 9/2/2011.
June 1, 2005Milagro Collaboration Meeting TPed Shifting and the Crab Curtis Lansdell University of Maryland.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
HCAL Digitization Rick Wilkinson 1. CMSSW HCAL Simulation Three gains are used as input –Calibration (GeV/fC) From DB gain, by channel –Electronics (fC/photoelectron)
DT calibration status A. Vilela Pereira for the DT calibration team (Università degli Studi di Torino & INFN Torino) Muon Barrel Workshop – July
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Cern -April 24, 2007Atlas Data Quality Workshop M. Primavera1 Muon EF Data Quality Muon EF Data Quality M. Primavera - I.N.F.N. Lecce on behalf of Muon.
HLT DT Calibration (on Data Challenge Dedicated Stream) G. Cerminara N. Amapane M. Giunta CMS Muon Meeting.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Muon Detection at CMS: from Detector and Software Commissioning to SM Physics and Higgs discovery 2° year Ph.D. Seminar, February 2008 Sara Bolognesi -
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1 NaI calibrationneutron observation NaI calibration and neutron observation during the charge exchange experiment 1.Improving the NaI energy resolution.
Ted Liu, July 5,00, idea on Ztrigger L1 Trigger Strategy L1 Trigger Requirements and Trigger Lines L1 Trigger performance Background Study Improving Performance:
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ILD/ECAL MEETING 2014, 東京大学, JAPAN
23/01/2007ID Software Workshop1 SCT performance from the SR1 endcap data Satoru Mima Okayama University ID Software Meeting 23-Jan Noise Study -
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Notes in preparation by the Torino group Sara BolognesiDT Cosmic Meeting 01/11/2007  MTCC note:  calibration section  DQM section  Internal note about.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Study of 1D Hit Error Assignment Marco Terranova, Filippo Pisano, N. Amapane, G. Cerminara.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
28/11/02Guy Dewhirst1 Ultra Light Weights Method Guy Dewhirst Imperial College London.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Comparison of algorithms for hit reconstruction in the DTs: Test of calibration procedures for t trig and drift velocity on Test Beam data Test of calibration.
Jean-Sebastien Graulich, Geneva
Italian g-2 software discussion
CLAS12 Commissioning with Cosmincs
Calibration Status of the art – the first tTrig calculated from data
Tracking System at CERN 06 and 07 test beams
LHAASO-WCDA: Design & Performance
Progress with MUON reconstruction
Status of n-XYTER read-out chain at GSI
CLAS12 Timing Calibration
Calorimeter calibrations with Flight Software.
Mini Tower Preliminary Results
Calibration of DT-MTCC data
Imperial laser system and analysis
Pierluigi Paolucci & Giovanni Polese
Status of the Calibration
Presentation transcript:

DT calibration software: tentative release schedule S.Bolognesi & S.Maselli & G.Mila Alignement&Calibration Meeting, 25 January 2008, CERN

Noise DB  Noise channels computed from random trigger runs or normal runs (looking for hits outside the allowed time region for muon signal) noise channel if number of hit > tuned threshold  Algorithm implemented in CMSSW and systematically tested on sector/wheel commissioning data  TO BE DONE (short-term) separate the algorithm to compute noise channels from the full offline noise study (as a function of time and space) card in cfg to switch on/off the full study implement the writing of the DB DB noise interface already exists (DTStatusFlag) S. Bolognesi (INFN To)AlCa Meeting – CERN 25 January

Test pulse runs  inter-channel synchronization comparing peak position in each wire good test pulse signals noise electronic noise due to enabling/disabling masks  possible long-term DEVELOPMENT: use test pulses also to monitor noise channels to monitor dead channels (made by hand until now) Test pulse signals for a given wire AlCa Meeting – CERN 25 January S. Bolognesi (INFN To)

Time pedestals TDC spectrum time pedestal (t trig ) derivative of the rising edge fit with a Gaussian (,  ) t trig = - k ×   and  computed from the fit and stored in DB with SuperLayer granularity  k factor tuned from residuals  TO BE DONE (mid-term) Phi SL Theta SL implement automatic k factor optimization plotting residuals with the needed granularity it will be the starting point for validation (based on residuals) S. Bolognesi (INFN To)AlCa Meeting – CERN 25 January

Summary  Development foreseen on  short term (by the end of February → inside CMSSW_2_0_0) DB writing in noise analysis  mid term (by the end of March) k factor automatic optimization (→ kick off for the validation)  long term use test pulses data to compute noise and dead channels AlCa Meeting – CERN 25 January S. Bolognesi (INFN To)