1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Status Meeting May 1, 2006 Systems Engineering Center.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Proposed RISC 2014 Deliverables, Activities, and Calendar For Discussion Andy Rodriquez, Director of RRAC January 14, 2014.
Board Brief March 24,  Previous survey conducted 7 years ago  PY assessment requested by President ◦ Conduct a complete review.
Project Scope Management
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
AWIPS Migration Status and Plans GOES-R Proving Ground and Satellite User Readiness Workshop AWIPS Migration Status and Plans May 17, 2011.
Transitioning unique data and research technologies to operations Experimental Products Development Team (EPDT) Jason Burks NASA SPoRT.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
NWSChat (Instant Messaging) Instant Messaging system for the NWS and Partners NWSChat Carlos Diaz June 2009.
MAC Committee Update Robert Kondziolka, MAC Chair.
1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Status Meeting March 27, 2006 Systems Engineering Center.
INDIANA UNIVERSITY Graduate and Professional Student Organization Elected Officers.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Jochen Dibbern, Chair CBS OPAG IOS.
1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Monthly Status Meeting August 28, 2006 Systems Engineering Center.
IN YEAR MONITORING & BUDGET PREPARATION WORKSHOP PREPARED BY BUDGET OFFICE MAY
NWS Digital Services 1 Digital Services Update and Forecast Collaboration March 16, 2004 Shannon White Training Division.
Project Scope Management Process
Next Doc Project Team: xxxxx Spring TitlePage Scope Statement Mission Statement3 Business Need4 Project Description5-6 Project Lifecycle Approach7.
AWIPS-II Data Delivery Project Overview December 2013.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
1 National Weather Service The Evolution of AWIPS NSTEP April 4, 2007 Ronla Henry.
CoCom Involvement in the Joint Capabilities Process November 4, 2003.
Davenport University Strategic Planning, Goal Development and Budget Process December 15, 2009.
Epic and Research Research Advisory Forum 12/11/2014.
Transportation Improvement Program Status and Update.
1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Monthly Status Meeting July 31, 2006 Systems Engineering Center.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
National Vaccine Advisory Committee Report from the Chair Gus Birkhead, MD, MPH NVAC Chair June 2, 2010.
Satellite Activities in MSC Ontario and the Satellite Products Working Group (SPWG) Edwina Lopes, Manager Science, WEO Ontario Environment Canada SAAWSO.
OIT Reorganization August 27, Today’s Agenda Principles of Reorganization Survey Feedback Organization Chart Leadership Team Structure Items to.
1 Hydrology Program Execution Accountability and Planning HIC Meeting January 25, 2006 NWSTC Kansas City, MO.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Technology Task Force Mission Review/Discussion March 5, 2015 Technology Task Force Mission Review/Discussion March 5, 2015.
1 12/8/2015 NWS S&T Committee September 17, 2002 NWS S&T Committee September 17, 2002 Paul Hirschberg Office of Science & Technology Paul Hirschberg Office.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
State of Georgia Release Management Training
1 Project Priority List (PPL) Update Troy Anderson ERCOT Enterprise Project Portfolio Management January 2011.
Software Development Status Update Advanced Weather Interactive Processing System (AWIPS) Program December 9, 2015 Edward Mandel CP/Software/Development.
NWS Digital Services 1 CB Operations Committee Lynn Maximuk DSPO Operations Team Eastern Region HPC Day 4-7 Grid Proposal Review, Findings and Recommendations.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
1 National Weather Service VTEC Status & Plan for Action National Partners Workshop January 15, 2004 Dr. Jason Tuell Office of Science and Technology.
Introduction to NWS Operational Presentations Chad Gravelle, GOES-R Satellite Liaison to NWS Dave Radell, NWS/ER Scientific Services June 4, 2014 GOES-R/JPSS.
PMO Update to PRS Troy Anderson Program Management Office May 22, 2008.
Introduction to ITSM processes. CONFIDENTIAL Agenda Problem Management  Overview  High Level process Change Management  Overview  High Level process.
1 CCSAS Governance An Overview 2007 Annual Child Support Training Conference and Expo September 18, :30 – 12:00.
1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Status Meeting June 5, 2006 Systems Engineering Center.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
P SystemC Analog/Mixed-Signal (AMS) extensions Working Group July 6, 2015 | Martin Barnasconi | P Chair.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
Standard Design Process Overview
USDA 2016 Financial Management Training Transforming Shared Services Change Management Presented by Ron Gros.
Software Configuration Management
Commercial Operations Sub-Committee Update to TAC
GOES-R Proving Ground and Satellite User Readiness Workshop AWIPS Migration Status and Plans May 17, 2011.
UNMJobs Implementation
GOES-R Proving Ground and Satellite User Readiness Workshop AWIPS Migration Status and Plans May 17, 2011.
Proposed RISC 2014 Deliverables, Activities, and Calendar
WHO-FIC Council Session
Performance Measure Recommendations
Project Management Method and PMI ® PMBOK ® Roles
Project Name Here Kick-off Date
Presentation transcript:

1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Status Meeting May 1, 2006 Systems Engineering Center

2 Agenda OB7.1 Schedule UpdateOB7.1 Schedule Update OB7.2 UpdateOB7.2 Update ContentsContents ScheduleSchedule Planning for OB8Planning for OB8 Next MeetingNext Meeting Action Item reviewAction Item review

3 Release 7.2 OB7.1 ScheduleOB7.1 Schedule SVR moved to September 8, 2006SVR moved to September 8, 2006 OB7.2 ScheduleOB7.2 Schedule SVR moved to December 15, 2006SVR moved to December 15, 2006 OB7.2 ContentsOB7.2 Contents New Requirement for OB7.2New Requirement for OB7.2 –TOR product changes (06-006) Push Immature OB7.2 Baseline Items to OB8Push Immature OB7.2 Baseline Items to OB8 –Polar Microwave Products Soil moisture, soil wetness index and surface type data not availableSoil moisture, soil wetness index and surface type data not available –SPC Convective Outlook (DRG RC 9246) Need requirements, no advocateNeed requirements, no advocate –GOES Low Cloud Base (05-062) Completed requirements on 7/24. Additional work required by NESDIS needs to be coordinated.Completed requirements on 7/24. Additional work required by NESDIS needs to be coordinated. Need to reprioritize Polar Microwave Products and GOES Low Cloud Base for OB8Need to reprioritize Polar Microwave Products and GOES Low Cloud Base for OB8

4 Release 7.2 Development Integration Platform (DIP)Development Integration Platform (DIP) Provide a platform (WFO and RFC) and process for integration of Government (GSD, MDL, OHD) developed software prior to delivery to Raytheon for Integration Testing (Pre-SwIT).Provide a platform (WFO and RFC) and process for integration of Government (GSD, MDL, OHD) developed software prior to delivery to Raytheon for Integration Testing (Pre-SwIT). Provide a platform for development organizations (GSD, MDL, OHD, Raytheon) to execute functional testing prior to integration at RaytheonProvide a platform for development organizations (GSD, MDL, OHD, Raytheon) to execute functional testing prior to integration at Raytheon –Functional testing is part of the AWIPS Development Process Improvement implemented during OB7.1 Receive early forecaster input into theReceive early forecaster input into the Provides independent testing of softwareProvides independent testing of software »Using test procedures and adhoc testing  June Functional Testing  Participants - ER, SR, WR, CR, Training (2), OCWWS, SST, Raytheon)

5 OB8 Planning - SREC Process Step 0: Determine Development AllocationsStep 0: Determine Development Allocations Completed: Infrastructure – 45%, Strategic – 43%, A&C – 12%Completed: Infrastructure – 45%, Strategic – 43%, A&C – 12% Step 1: Gather potential candidatesStep 1: Gather potential candidates Completed in FebruaryCompleted in February Step 2: Add candidates to the new SREC Master ListStep 2: Add candidates to the new SREC Master List Completed in FebruaryCompleted in February Step 3: Validate requestsStep 3: Validate requests Working – OSIP material due 4/3/06Working – OSIP material due 4/3/06 Step 4: Gather supporting materialStep 4: Gather supporting material Completed in MarchCompleted in March Step 5: Evaluate and prioritize candidates for integration into the AWIPS baselineStep 5: Evaluate and prioritize candidates for integration into the AWIPS baseline Complete by March 24, present at March 27 SREC meetingComplete by March 24, present at March 27 SREC meeting Step 6: Prepare ReleaseStep 6: Prepare Release April 1 to May 12April 1 to May 12

6 Step 6: Prepare Release March 31 - Assignment to Development organization (Responsibility: SEC)March 31 - Assignment to Development organization (Responsibility: SEC) March 31 - Deliver Business Functional Requirements (Responsibility: SEC)March 31 - Deliver Business Functional Requirements (Responsibility: SEC) OSIP TasksOSIP Tasks –SON, Project Plan, CONOPS/ORD Infrastructure tasksInfrastructure tasks –ORD April 14 - Review of Material (Responsibility: Raytheon Testing Staff, Development Organizations)April 14 - Review of Material (Responsibility: Raytheon Testing Staff, Development Organizations) Validate assignment – communicate mis-assignments to SECValidate assignment – communicate mis-assignments to SEC Validate requirements in accordance with AWIPS Business Functional Requirements ChecklistValidate requirements in accordance with AWIPS Business Functional Requirements Checklist –Assign actions to gather additional information April 28 - Conduct a high level analysis on the top priority recommendations (Responsibility: Development organizations)April 28 - Conduct a high level analysis on the top priority recommendations (Responsibility: Development organizations) –Prepare Work Breakdown Structure –Identify special Testing Requirements –Prepare Development LOEs (likely, pessimistic) –Prepare SwIT Integration LOEs (likely, pessimistic) May 12 - Assign task to Releases 8.1, 8.2, 8.3 (Responsibility: SEC with assistance from Raytheon/Keane)May 12 - Assign task to Releases 8.1, 8.2, 8.3 (Responsibility: SEC with assistance from Raytheon/Keane) Based on SREC weighting, AWIPS budget, Development Organization expertise, development allocation, Integration testing resources, data availability, and release scheduleBased on SREC weighting, AWIPS budget, Development Organization expertise, development allocation, Integration testing resources, data availability, and release schedule Prepare ROM for this release - Evaluate data sizes, communications Impact, hardware requirements, and cost (Responsibility: SEC – Analysis Branch)Prepare ROM for this release - Evaluate data sizes, communications Impact, hardware requirements, and cost (Responsibility: SEC – Analysis Branch)

7 OB8 Planning – SREC Process Step 8, 9, 10: Validate/Approve Release Content (June 5)Step 8, 9, 10: Validate/Approve Release Content (June 5) SEC, SREC, S&T CommitteeSEC, SREC, S&T Committee –Responsibility: SREC Vice Chair Step 11: Prepared Change Requests for AWIPS CCB approval (June 5)Step 11: Prepared Change Requests for AWIPS CCB approval (June 5) Software Release and Data Items (e.g., RUC)Software Release and Data Items (e.g., RUC) –Responsibility: SREC Vice Chair Step 12: Provide the OCWWS Training Division with approved software build contents for inclusion to the NSTEP process (June 5)Step 12: Provide the OCWWS Training Division with approved software build contents for inclusion to the NSTEP process (June 5) Responsibility: Executive SecretaryResponsibility: Executive Secretary Step 13: Identify SREC Focal Points for each OB8 development item (June 23)Step 13: Identify SREC Focal Points for each OB8 development item (June 23) Responsibility: SREC Vice ChairResponsibility: SREC Vice Chair

8 Next Meetings Special Voting Members MeetingSpecial Voting Members Meeting May 15 at 2:00pm EDTMay 15 at 2:00pm EDT May 22 at 2:00pm EDTMay 22 at 2:00pm EDT Planning for OB8Planning for OB8 –Step 6: Discuss draft OB8 Release Regular meeting on June 5 at 2:00pm EDTRegular meeting on June 5 at 2:00pm EDT Review of OB8 ReleasesReview of OB8 Releases

9 Actions Review of Charter – Address DR process. (Mandel)Review of Charter – Address DR process. (Mandel) Remove Marine Surface Winds and SST from Polar Microwave Products contents. The marine surface winds were dropped because NWS was able to get the QuikScat winds which were of finer resolution and provided wind direction, as well as speed. The microwave polar product can only provide wind speed. The microwave SSTs were dropped because of resolution. NCEP/EMC/OMB provide marine surface winds, based on microwave. Both the SST and wind speeds can be found in OB6 under satellite, SSM/I Data. (Completed)Remove Marine Surface Winds and SST from Polar Microwave Products contents. The marine surface winds were dropped because NWS was able to get the QuikScat winds which were of finer resolution and provided wind direction, as well as speed. The microwave polar product can only provide wind speed. The microwave SSTs were dropped because of resolution. NCEP/EMC/OMB provide marine surface winds, based on microwave. Both the SST and wind speeds can be found in OB6 under satellite, SSM/I Data. (Completed) SREC agreed to submit a Request for Change to Accept TOR Product Changes into OB7.2, and push SPC Convective Outlook, GOES Low Cloud Base to OB8, and Polar Microwave Products (Soil moisture, soil wetness index and surface type data) to SREC weighting exercise for OB8. (Completed)SREC agreed to submit a Request for Change to Accept TOR Product Changes into OB7.2, and push SPC Convective Outlook, GOES Low Cloud Base to OB8, and Polar Microwave Products (Soil moisture, soil wetness index and surface type data) to SREC weighting exercise for OB8. (Completed) Prepare OSIP Task for additional Polar Microwave Products for items pushed form OB7.2 and others. (Heil)Prepare OSIP Task for additional Polar Microwave Products for items pushed form OB7.2 and others. (Heil)

10 Actions Determine how to handle new requirements received after March 27, Currently they include two new infrastructure items, Notification Server improvements, and NAM consolidation (Mandel)Determine how to handle new requirements received after March 27, Currently they include two new infrastructure items, Notification Server improvements, and NAM consolidation (Mandel) Determine and publish cutoff dates for new requirements. (Mandel)Determine and publish cutoff dates for new requirements. (Mandel) Prepare a list of COTS upgrades for OB8. (Raytheon)Prepare a list of COTS upgrades for OB8. (Raytheon) Remove TOR changes from OB8 list if they are approved for OB7.2. (Completed)Remove TOR changes from OB8 list if they are approved for OB7.2. (Completed) Identify OB7.2 SREC Focal Points each software development process review steps (Completed)Identify OB7.2 SREC Focal Points each software development process review steps (Completed) Look at ranking for NOGAPS. Some regions may have been confused since it is the same OSIP task as Improve Medium- Range Model Guidance. (Mandel)Look at ranking for NOGAPS. Some regions may have been confused since it is the same OSIP task as Improve Medium- Range Model Guidance. (Mandel) Instead of Raytheon, specifically identify the organization within Raytheon. (Completed)Instead of Raytheon, specifically identify the organization within Raytheon. (Completed)