Dario Barberis: Conclusions ATLAS Software Week - 10 December 2004 1 Conclusions Dario Barberis CERN & Genoa University.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

US ATLAS Project Management J. Shank U.S. ATLAS Computing and Physics meeting Aug., 2003 BNL.
U.S. ATLAS Computing and Physics Jim Shank Boston University DOE/NSF Review of LHC Computing Germantown 8 July, 2004.
U.S. ATLAS Software WBS 2.2 S. Rajagopalan July 8, 2003 DOE/NSF Review of LHC Computing.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
LHCb Quarterly Report October Core Software (Gaudi) m Stable version was ready for 2008 data taking o Gaudi based on latest LCG 55a o Applications.
ATLAS-Specific Activity in GridPP EDG Integration LCG Integration Metadata.
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
The GlueX Collaboration Meeting October 4-6, 2012 Jefferson Lab Curtis Meyer.
ATLAS and Grid Computing RWL Jones GridPP 13 5 th July 2005.
CHEP – Mumbai, February 2006 The LCG Service Challenges Focus on SC3 Re-run; Outlook for 2006 Jamie Shiers, LCG Service Manager.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
K. De UTA Grid Workshop April 2002 U.S. ATLAS Grid Testbed Workshop at UTA Introduction and Goals Kaushik De University of Texas at Arlington.
Offline Coordinators  CMSSW_7_1_0 release: 17 June 2014  Usage:  Generation and Simulation samples for run 2 startup  Limited digitization and reconstruction.
1 ATLAS Grid Computing and Data Challenges Nurcan Ozturk University of Texas at Arlington Recent Progresses in High Energy Physics Bolu, Turkey. June 23-25,
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
LHC Data Challenges and Physics Analysis Jim Shank Boston University VI DOSAR Workshop 16 Sept., 2005.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
L.Perini-CSN11 ATLAS Italia Calcolo Stato e piani: Ruolo di LCG Nessun finanziamento chiesto ora (a Settembre si)
ATLAS eScience Programme ATLAS UK Oversight Committee 21 May 2004 Roger Jones 12 UK institutions.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
US ATLAS Project Management J. Shank DOE/NSF review of LHC Computing 8 July, 2003 NSF Headquarters.
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Zprávy z ATLAS SW Week March 2004 Seminář ATLAS SW CZ Duben 2004 Jiří Chudoba FzÚ AV CR.
SEAL Core Libraries and Services CLHEP Workshop 28 January 2003 P. Mato / CERN Shared Environment for Applications at LHC.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
GDB Meeting - 10 June 2003 ATLAS Offline Software David R. Quarrie Lawrence Berkeley National Laboratory
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Introduction S. Rajagopalan August 28, 2003 US ATLAS Computing Meeting.
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
Overview of ATLAS Data Challenge Oxana Smirnova LCG/ATLAS, Lund University GAG monthly, February 28, 2003, CERN Strongly based on slides of Gilbert Poulard.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
1 A Scalable Distributed Data Management System for ATLAS David Cameron CERN CHEP 2006 Mumbai, India.
PCAP Close Out Feb 2, 2004 BNL. Overall  Good progress in all areas  Good accomplishments in DC-2 (and CTB) –Late, but good.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
David Adams ATLAS ATLAS Distributed Analysis (ADA) David Adams BNL December 5, 2003 ATLAS software workshop CERN.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Database Project Milestones (+ few status slides) Dirk Duellmann, CERN IT-PSS (
Database Access Patterns in ATLAS Computing Model G. Gieraltowski, J. Cranshaw, K. Karr, D. Malon, A. Vaniachine ANL P, Nevski, Yu. Smirnov, T. Wenaus.
Planning Session. ATLAS(-CMS) End-to-End Demo Kaushik De is the Demo Czar Need to put team together Atlfast production jobs –Atlfast may be unstable over.
US Tier 2 issues Jim Shank Boston University U.S. ATLAS Tier 2 Meeting Harvard University August, 2006.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Update on CHEP from the Computing Speaker Committee G. Carlino (INFN Napoli) on behalf of the CSC ICB, October
Dario Barberis: ATLAS DB S&C Week – 3 December Oracle/Frontier and CondDB Consolidation Dario Barberis Genoa University/INFN.
17 September 2004David Foster CERN IT-CS 1 Network Planning September 2004 David Foster Networks and Communications Systems Group Leader
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
ATLAS-MPI Meeting 104 April 2005 Nektarios Benekos MPI  the problem with the offset of the CSC's in digitization will be fixed with a modification to.
PARCC Family Presentation
EGEE Middleware Activities Overview
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Database Readiness Workshop Intro & Goals
European Organization for Nuclear Research
F.Carminati Geneva, February 13, 2003
Savannah to Jira Migration
LHCb Conditions Database TEG Workshop 7 November 2011 Marco Clemencic
US ATLAS Physics & Computing
(CMS GEANT4 simulation)
ATLAS DC2 & Continuous production
Presentation transcript:

Dario Barberis: Conclusions ATLAS Software Week - 10 December Conclusions Dario Barberis CERN & Genoa University

Dario Barberis: Conclusions ATLAS Software Week - 10 December ATLAS Computing Timeline 2003 POOL/SEAL release (done) ATLAS release 7 (with POOL persistency) (done) LCG-1 deployment (done) ATLAS complete Geant4 validation (done) ATLAS release 8 (done) DC2 Phase 1: simulation production (done) DC2 Phase 2: intensive reconstruction (the real challenge!) LATE! Combined test beams (barrel wedge) (done) Computing Model paper (almost done) Computing Memorandum of Understanding (in progress) ATLAS Computing TDR and LCG TDR (starting) DC3: produce data for PRR and test LCG-n Physics Readiness Report (perhaps?) Start cosmic ray run GO! NOW

Dario Barberis: Conclusions ATLAS Software Week - 10 December Many discussions this week l Feedback from CTB l Issues related to DC2 operation l Grid middleware and our production system l Software development and release plans l Software testing l Planning and scheduling methodology l New ESRAT coordination nArmin Nairz will take over as Geant4 Coordinator from January 2005 l Release schedule for 2005 l Computing Model and Resources l Some of these issues will come up for discussion again this afternoon in the CMB/SPMB meeting

Dario Barberis: Conclusions ATLAS Software Week - 10 December Format of the Software & Computing week l A few main sessions and several shorter “working group” meetings nup to 3 parallel sessions l Some main “tracks”: nSimulation, Reconstruction, EDM, PESA, Physics Analysis Tools nData Challenges, Production System, Grid Middleware nCore Software, Infrastructure, Data Management nComputing Model, ICB l Question 1: ndo people like it this way?  please give us feedback before we start organizing next s/w week l Question 2: nwhere do we place tutorials?  in s/w week in parallel with everything else  near s/w week with week-end in-between (people travel once)  far from s/w week (people travel twice)

Dario Barberis: Conclusions ATLAS Software Week - 10 December Software & Computing Weeks in 2005 l February at CERN njust after the ATLAS Week l May at CERN n2 weeks before the Rome Physics Workshop l September at CERN njust before the ATLAS Overview Week in Paris l 5-9 December at LAL Orsay

Dario Barberis: Conclusions ATLAS Software Week - 10 December Finally... A Merry Christmas and a Happy New Year to you all !!!