High Level Scoping for Upcoming Monitoring Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group June 3, 2015 1.

Slides:



Advertisements
Similar presentations
March 2006 AQC H2S Study Update DAQ Progress Report on Hydrogen Sulfide Study at Paper Mills Presentation Summary - Rule requirements for monitoring study.
Advertisements

1. Identify challenges and opportunities using questions that reference the six research for development themes defined in the AAS Program Proposal. This.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
BoRit Superfund Site Timeline
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
TMDL Implementation in the Calleguas Creek Watershed Ashli Desai Larry Walker Associates.
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
January 20, 2015 City Council Meeting. Purpose Council direction on moving forward with: Housing linkage fee in short term based on 2009 Study and existing.
Non-parametric Bayesian value of information analysis Aim: To inform the efficient allocation of research resources Objectives: To use all the available.
2 nd September 2014 Sean White – Tourism Intelligence Unit (ONS) Measuring Tourism Locally in Northern Ireland.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
NITROGEN TRACKING AND REPORTING TASK FORCE A Summary Agricultural Expert Panel Public Meeting #1 May 5, 2014 Amrith Gunasekara, PhD Science Advisor to.
Evaluation of Florida C&D Debris Groundwater Monitoring Data Presentation discusses: Results of analysis of groundwater monitoring data Results of groundwater.
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
Stakeholder Meeting #2 March 28, Agenda SNMP Overview Existing Groundwater Conditions Loading Analysis Approach Nutrient loading risk analysis/findings.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
Update on the SEEM Simulation Program Larry Palmiter and Ben Larson August 4, 2008 Ecotope Inc. Presented at Regional Technical Forum Portland, Oregon,
Gradient CORPORATION Vapor Intrusion Attenuation Factors (AFs) – Measured vs. EPA Defaults A Case Study Presented by Manu Sharma and Jennifer DeAscentis.
Technical Track Work Group Report Out August xx, 2012.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Draft Handbook on Measuring Intellectual Property Products: Estimating Mineral Exploration Presentation to OECD Working Party on National Accounts, Paris,
SRRTTF Technical Activities Where We’ve Been, Where We’re Going Dave Dilks Spokane River Regional Toxics Task Force Workshop January 13,
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
Modeling to Understand Stormwater Management Efforts Portland Harbor Superfund Site Dawn Sanders City of Portland Bureau of Environmental Services September.
Remediation System Design & Implementation Presented by.
Bassett Creek Water Management Commission Joint Advisory Group Meeting January 23, 2001.
Guidelines for Impact and Adaptation Assessment Design versus Implementation Issues RICHARD J.T. KLEIN POTSDAM INSTITUTE FOR CLIMATE IMPACT RESEARCH (PIK)
Phase 1: Preliminary Investigation or Feasibility study
Balancing the Need of Future Revisions with resources of the the National Statistical Offices By Robert P. Parker, Consultant on Federal Statistics Discussant:
Residential Survey Task Force Update to RMS April 12, 2005.
Updates to QAPP for 2015 Synoptic Survey Dave Dilks August 5, 2015.
Technical Track Work Group Report Out August 22, 2012.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Watershed Monitoring and Modeling in Switzer, Chollas, and Paleta Creek Watersheds Kenneth Schiff Southern California Coastal Water Research Project
Feasibility Study
Groundwater and NAPL Monitoring Oregon DEQ, Hart Crowser, Inc., and GSI Water Solutions 2010 McCormick & Baxter Annual Report.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Rob Verheem The Netherlands EIA Commission
Mass Balance Assessment of 2014 Synoptic Survey Results: Dave Dilks Spokane River Regional Toxics Task Force 2014 Workshop January 13,
The Committee on Technical Barriers to Trade Good Regulatory Practice Presentation by Mr. Margers Krams Chairman of the TBT Committee.
Feasibility Study Workplan Park – Euclid RP Group Community Advisory Board Meeting May 23, 2013.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
FY 2016 EAP Proposals 1.Groundwater Sampling at Coulee Creek 2.Deep & Coulee Straight to Implementation Project 3.Little Spokane DO/pH TMDL 4.Lake Spokane.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Project Management in Marketing Deirdre Makepeace Level Verifier – Professional Diploma Assignment brief June and September 2014.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Technical Update Task Force & Technical Track Work Group Meeting Dave Dilks June 15, 2016.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks June 1, 2016.
P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: Fax: Kitikmeot Inuit Association Summary of Technical Issues.
Comparability of “Phase 2 Technical Activities Report” to Ecology’s “PCB Source Assessment” Dave Dilks SRRTTF June 24,
Proposed Plan for No Further Action
Watershed Origins of Sediment Loads
Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
SRRTTF TTWG Meeting Dave Dilks July 6, 2016
Code Amendments to SMC 19A Planning Commission Meeting
Unified Approach to Stormwater Monitoring (UASM)
Mulberry Watershed Management Plan
Daughter Groundwater Directive
Code Amendments to SMC 19A Planning Commission Meeting
Risk Assessment: an example
Presentation transcript:

High Level Scoping for Upcoming Monitoring Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group June 3,

Outline  Background  High level scoping of unknown groundwater source  Cost estimates for all monitoring options – Groundwater assessment – Revisit/confirm dry weather assessment – Wet weather monitoring  Cost estimates for LimnoTech involvement 2

Background  2015 workshop recommended data collection on the following – Wet weather sources – Sources contributing to the ground water load  High level scoping recommended as first step – Conduct data mining – Assess feasibility of obtaining useful results – Propose monitoring alternatives  Wet weather scoping discussed in May 3

Scoping for Groundwater Loading  Better define the source of “unknown” load  Two tasks 1.Review available data 2.Develop/apply groundwater loading model 1.Groundwater data collected by Kaiser show: – Very high, but very localized concentrations – Background contamination of unknown extent 4

5 x x x x x = Background well x Site Schematic

Groundwater Mass Loading Assessment  Simple mass loading analysis conducted to assess – What fraction of the estimated unknown load is from the localized source? – How widespread would the background concentration need to be to explain the unknown load 6

Groundwater Mass Loading Model*  Calculates PCB loading based upon calculated seepage rate and specified concentration  Model inputs include 7 – Hydraulic conductivity – Horizontal groundwater gradient – Horizontal length of impacted zone – Vertical length of bank seepage face – PCB concentration in groundwater *Model and key assumptions provided on SRRTTF web site

Groundwater Model Results  Loading from concentrated plume calculated using two different input assumptions – Estimated load ranged from mg/day  Loading from background sources at Kaiser – Estimated load of 91 mg/day  Sum of these two components = mg/day 8

Comparison of Model to Mass Balance  Total load to segment from mass balance assessment = mg/day – Estimated load from background sources crossing Kaiser site = 91 mg/day – Estimated load originating on Kaiser site = mg/day – Estimated unaccounted for load in segment = mg/day 9

Monitoring Ramifications  Worthwhile to examine the nature of background contamination entering Kaiser property  Potentially worthwhile to examine the nature of contamination elsewhere in the Barker-Trent segment – These sources contribute 7 to 40% of total load 10

Monitoring Options Up-gradient of Kaiser Property  Two options, both based on installing two permanent shallow wells and sampling quarterly for one year 1.Base well location on review of historical land use information 2.Install and sample from five temporary wells, base permanent well location of results 11

Monitoring Options Remainder of Barker-Trent Segment  Recommended monitoring consists of sampling quarterly for one year at five wells  Total cost will depend upon presence of suitable existing wells – EAP is compiling this data, which should be available shortly 12

Groundwater Monitoring Costs  Up-gradient of Kaiser Property – Base well location on review of historical land use information: $70,000 – Base well location on newly-installed wells: $130,000  Remainder of Barker-Trent Segment – Relevant monitoring wells exist: $55,000 – New wells need to be installed: $130,000 13

“Wet Weather” Options Four monitoring options recommended for further consideration by Task Force 1.Revisit/confirm dry weather assessment for Barker Rd. to Trent segment 2.Revisit/confirm dry weather assessment for Greene St. to Trent gage segment 3.Limited sampling of stormwater outfalls 4.Wet weather sampling of Hangman Creek 14

“Wet Weather” Costs  Update dry weather mass balance – Barker Rd. to Trent only: $40,000 – Greene St. to Spokane gage only: $40,000 – Both segments: $65,000  Additional wet weather monitoring – City of Spokane stormwater: $14,000 – Hangman Creek: $27,000  Retrospective loading analysis: $7,500 15

Monitoring Cost Summary “Wet Weather” Groundwater Update dry weather mass balanceUp-gradient of Kaiser Property - Barker Rd. to Trent only$40,000- Location based on land use$70,000 - Greene St. to Spokane gage only $40,000- Location based on monitoring$130,000 - Both segments$65,000 Remainder of Barker-Trent Additional wet weather monitoring - Suitable wells exist$55,000 - City of Spokane stormwater$14,000- New wells required$130,000 - Hangman Creek$27,000 16

LimnoTech/Assessment Cost Summary Coordination/Project Management Analysis - Develop monitoring scopes $5,000- Update dry weather mass balance $7,500 - Participation in SRRTTF meetings $1200/mo- Assess wet weather loads$5,000 - Project Management$400/mo- Retrospective loading analysis$7,500 - Workshop attendance$5,000- Assess groundwater loads$7,500 - Reporting$5,000 17

Stormwater Loading Assessment Example retrospective analysis Could be used to better put stormwater loads in context 18