FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

TOPIC :CAPACITY AND FACILITIES
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
Process Selection and Facility Layout
Chapter 3 Time Study.
What is Production? Operations Management includes all of the activities managers engage in to produce goods (products) and services. Planning takes place.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Process Selection and Facility Layout
Location Strategy and Layout Strategy
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
Process Selection and Facility Layout
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
Facility layout.
Methods, Standards, and Work Design
Process (Job Shop) Layouts
Facility Design and Layout
Chapter 11 Production and Operations Management Learning Goals
Chapter 6 Production Processes.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 4 Process Design.
How is a manufacturing facility planned?
Manufacturing is the changing of raw or processed materials into usable products. Manufacturing occurs in manufacturing plants, or factories.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
McGraw-Hill/Irwin.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
1 Facility Layout: Manufacturing and Services Manufacturing and Services Chapter 5, Part B.
Process Layout Chapter 7 July 20, 2005.
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
Operations Fall 2015 Bruce Duggan Providence University College.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
Copyright © 2005 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Part 3 Management: Empowering People to Achieve Business Objectives.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
Facility Layout Part b.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Basic Layout Types Product layouts Process layouts
Laljibhai Chaturbhai Institute of Technology. Bhandu Affiliated to Gujarat Technological University, Ahmadabad Sub: Engineering Economics & Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
Manufacturing And Service processes
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Department Of Pharmaceutics. PRODUCTION It is a process or procedure of converting a set of inputs, namely men, capital, information & energy into finished.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 7: Manufacturing Processes
Process Selection and Facility Layout
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
Facility Layout Configuration of departments, work centres and equipment, with particular emphasis on movement of work through the system Why Important?
Facilities Planning and Design Course code:
(Lecturer in Mech. Deptt.)
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Departmental Planning
Process Selection and Facility Layout
Production and Operations Management
Presentation transcript:

FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR

Time Study OBJECTIVES; Understand the concepts of time study and time standards Understand the importance of time standards in facilities planning Be able to identify various techniques for establishing time standards Be able to identify the steps for performing a stopwatch time study Understand the difference between observed, normal, and standard times and be able to calculate each Understand the concepts of normalizing and allowances

What is a Time Standart A time standard is defined as “the time required to produce a product at a workstation with the following three conditions; a qualified, well-trained operator working at a normal pace doing a specific task. Experience is usually what makes a qualified, well-trained operator, and time on the job is the best indication of experience. Normal pace is the pace at which a trained operator, under normal conditions, performs a task with a normal level of effort.

The time standard is used to… Determine the number of machine tools to buy. Determine the number of production people to employ. Determine manufacturing costs and selling prices. Schedule the machines, operations, and people to do the job and to deliver on time with smaller inventories. Determine the assembly line balance and the conveyor belt speed, load the work cells with the correct amount of work, and balance the work cells.

The time standard is used to… Determine individual worker performance and identify and correct problematic operations. Pay incentive wages for outstanding team or individual performance. Evaluate cost reduction ideas and pick the most economical method based on cost analysis, not on opinion. Evaluate new equipment purchases to justify their expense. Develop operation personnel budgets to measure management performance.

How Many Machines Do We Need? The answer depends on two pieces of information: How many pieces do we need to manufacture per shift? How much time does it take to make one part? (This is the time standard.) Number of Machines = Example; The marketing department wants you to make 2,000 wagons per 8-hour shift. It takes minute to form the wagon body on a press. Assume 50 minutes downtime per shift (breaks, cleanup, etc.) and 75% utilization of work. Time Standart Plant Rate

How Many Machines Do We Need? Production Time= (8x60 – 50) x 0.75 = R = = Number of Machines = = 2.48 ≈ 3 machines Machine numbers should be rounded to upper value

How Many People Should We Hire? Number of labor = Example; The is the hours required to produce 1,000 pieces of water valve. The marketing department has forecasted sales of 2,500 water valves per day. Assume 75% performance. How many people are needed to make water valves? Total Time Required for Production Shift Duration

Process Diagram of Water Valve

Solution of Example ≈ 185,25 hr per 1000 units For 2500 units 185,25*2,5= 463,125 hr = 463,125 = 58 labours are needed. 138,94 hr per 1000 units 0,75 138,94 hr per 1000 units 0,75 463,125 hr 8 hr per day

Plant Layout 4 basic types of plant layout; Process Layout Product Layout Group (Cell) Layout Fixed Layout

Process Layout Used when the operations system must handle a wide variety of products in relatively small volumes (i.e., flexibility is necessary) Designed to facilitate processing items or providing services that present a variety of processing requirements. The layouts include departments or other functional groupings in which similar kinds of activities are performed. A manufacturing example of a process layout is the machine shop, which has separate departments for milling, grinding, drilling, and so on.

Process Layout

Prduct Layout Product layouts are used to achieve a smooth and rapid flow of large volumes of products or customers through a system. A job is divided into a series of standardized tasks, permitting specialization of both labor and equipment. The large volumes handled by these systems usually make it economical to invest huge amount of money in equipment and job design.

Prduct Layout Operations are arranged in the sequence required to make the product. For instance, if a portion of a manufacturing operation required the sequence of cutting, polishing, and painting, the appropriate pieces of equipment would be arranged in that sequence. Product layouts achieve a high degree of labor and equipment utilization.

Prduct Layout Material LMCG MLPL ACGD Product

Group (Cell) Layout Cellular manufacturing is a type of layout in which machines are grouped into what is referred to as a cell. Groupings are determined by the operations needed to perform work for a set of similar items, or part families that require similar processing. Cellular layout provides faster processing time, less material handling, less work-in-process inventory, and reduced setup time. Used when the operations system must handle a moderate variety of products in moderate volumes

Group (Cell) Layout Cell 3 LM G G Cell 1 Cell 2 Assembly Zone A A L M D L L M Shipment D Warehouse G

Fixed Position Layout In fixed-position layouts, the materials or major components remain in a fixed position, and workers, materials, and equipment are moved as needed. Fixed-position layout is used when product is very bulky, heavy or fragile Fixed-position layouts are used in large construction projects (buildings, power plants, and dams), shipbuilding, and production of large aircraft and space mission rockets. Fixed-position layouts are widely used for farming, firefighting, road building, home building, remodeling and repair.

Fixed Position Layout M Product Warehouse D P L

Cost of Product Cost of product is consisted of; Fixed costs (labour cost, management cost, amortization etc…) Variable cost (operation cost, material cost etc…) Auxiliary services cost Material handling cost To compare cost of product for every layout; Variable cost is same for same products. Fixed cost, material handling cost ant cost of auxiliary services are needed.

Cost of Product C F :Fixed cost (yearly), C V :Variable cost (yearly) C H : Material handling cost (yearly) C A : Cost of auxiliary services (yearly), C P : Production cost i: Interest, n: number of years considered, n A : the period of amortization Cost of product for every layout can be compared as calculatin present worth of production cost; C P = C F (P/A;i;n) + C V (P/A;i;n) + C H (P/A;i;n) + C A (P/A;i; n A )

Cost of Product To calculate unit cost total number of products produced during the production period is needed. Total number of products (N P ) = R (plant rate) * total production time in the period Unit cost (C U ) = When production cost of different layouts are calculated and compared pairly, the interest ratio (i) making them equal (C P1 = C P2 ) is the internal rate of return. CPCP NPNP

Cost of Product Break – even point is for finding out the time when it is started to gain. Internal rate of return is for finding out the intereset ratio makes the production profitable. Present worth is for finding out the present value of production cost.