GCC Kitchen & Dining Improvements Project Agenda Opening Comments Timeline Project Committees Special Thanks Questions & Answers.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 G OLF A ND C OUNTRY C LUB C HANTILLY N ATIONAL Restoration and Renovation.
Cathedral of the Immaculate Conception Project Information Session.
129 California Ave. Glendora, CA 91741, U.S.A. (626) Comfort Interior Design & Construction.
The Thayer Homestead Development Committee T Fall Town Meeting November 14, 2011.
Asheville Regional Airport/City of Asheville Fire Station Feasibility Study Public Safety Committee June 25, 2012.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
FCIA CODE EFFORTS FCIA Spring Conference 2003 By William E. Koffel, P.E. Koffel Associates, Inc.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
AIMHO11/12/2013 RENOVATION.  1550 on-campus beds  650,000 square feet  Facility occupancy range  3 year live on – requirement  3 housing types.
The Catholic Community of St. Thomas More New Building Committee.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches, Schools and Other Facilities Version 1: August 2013.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Draft Rancho Colorados Swim & Tennis Club Master Plan Overview.
Long Range Facility Planning assisted by Silver Falls School District.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
More Seats for Students History of Tuckahoe Capacity and APS Actions.
FACILITIES ADVISORY COMMITTEE Facilities Advisory Committee Annual Report.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Allen Park Presbyterian Church Facility Study
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
IYM Site Envisioning & Building Committee Presentation for IYM Annual Meeting August 2003.
Getting Your Project Started Chapter 1 © 2014 by John Wiley & Sons, Inc.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
1 Initial Report of Facility Study To the Board of Education June 12, 2007 Dave Bloom, John Frieden, Nancy Galbraith Mark Hepner, Tori Lindeman, Mike Oberhaus,
1 Agenda February 15, 2007 Facilities Advisory Committee 1)Call to Order – Paul Stansberry & Kevin Max 2)Option 3 – Plan & Costs 3)Operating Costs 4)Timeline.
Messer Construction Company Presented By: Mark Zimmerly.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
1 GCC Annual Meeting 2014 Call to Order Voting Presentation President’s Remarks Membership Report Financial Report Facilities Report Kitchen and Dining.
State of the School Presentation Monday, May 21, :00 PM – Carroll Library.
WILL COUNTY RADIO SYSTEM PROJECT RFP Proposal Review & Recommendation TUSA CONSULTING SERVICES.
Aldeburgh Golf Club Club House Proposals 1 September 2015.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Library Remodel Update Abbot Chambers City Librarian 31 July, 2012.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
BLAKELY  Welcome.
Overview of MSBA Building Process and Project Timeline
High School Capacity Committee
Overview of MSBA Building Process and Project Timeline
Item 4C Approve a Guaranteed Maximum Price Amendment with Dean Construction in the amount of $10,245,740 for construction of Bicentennial Park Improvements,
“INSERT PROJECT PHOTOS/RENDERINGS FRO ARCHITECT”
Construction Documents
Campus Master Plan.
Sausalito Downtown Public Restroom
Implementing the Transportation/Land Use Connection Program
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
IUSB Education and Arts
Fruita Monument High School Entry Project
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Our Vision Chickasaw Point - An inviting community on Lake Hartwell where residents work, play and enjoy life together ”A welcoming place to.
Capital Project Update
Greensboro Housing Hub
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
Our legacy for the future
Ward Park Restroom Timeline
Presentation transcript:

GCC Kitchen & Dining Improvements Project Agenda Opening Comments Timeline Project Committees Special Thanks Questions & Answers

Opening Comments We were simply wrong on initial estimate – Tried to calculate it like a residential expansion and did not take into account commercial nature of expansion, HVAC, sprinklers, site work… Does not diminish need for the project We have refined the project to bring it down from $4M to $2.7M with $300K contingency

Opening Comments (cont’d) Hard choices were made to get to $3M – A paneled fireplace instead of a grandiose masonry fireplace…more in keeping with Owls Nest’s numerous beautiful fireplaces – A 14’ high beamed flat acoustical ceiling instead of a 26’ timber framed cathedral ceiling, not typical of Lindeberg design – Considering a faux slate or standing seam metal roof instead of trying to match slate on Owls Nest – Modifying retaining walls to reduce structural nature

Opening Comments (cont’d) – Reduced costs but have not reduced scope or quality Dining and bar focused on beautiful views Kitchen layout and equipment fully renovated Bathrooms fully renovated Hallway added front to back to bypass banquet events Youth Center located in Owl’s Nest

Timeline October 2012 – Based upon ongoing challenge of attracting members, 2009 GCC Membership Survey, and following industry trends, a meeting is set up with Frank Vain of the McMahon Group to discuss options December 2012 – Frank Vain meets with Jim Davis, Eric Holloway, Melinda Penn and Kurt Faller. Open discussion about private club trends and McMahon Group assisting GCC

Timeline (cont’d) January 2013 – GCC Board of Directors Retreat- based on LRPC recommendation there is unanimous and enthusiastic support to hire McMahon Group to lead us through exploring facilities upgrades February 2013 – McMahon Group hired after thoroughly vetting and negotiating contract – GCC Construction Project Committee (Anne Martelli, Greg Pettinaro, Jim Everett, Kurt Faller, Melinda Penn, Tony Thompson, Michael Dougherty, Jim Davis, Eric Holloway, Cindy Love, Lisa Frankel, Shaw Taylor, John Wolak) is convened

Timeline (cont’d) – Jim Davis, Eric Holloway, Melinda Penn and Kurt Faller meet with Mark A. Hewitt to discuss potential thoughts for a bar, renovated kitchen, dining room…. Mark A. Hewitt is chosen because he is the foremost expert on Harrie T. Lindeberg who designed the Owls Nest. March 2013 – GCC Kitchen & Dining Improvements Project Committee meets with Frank Vain and Mark A. Hewitt to discuss ideas for renovating the kitchen and adding a bar and dining room. At this meeting the idea of changing the layout of the Owls Nest so that a hallway can bypass the “public” side of the club is considered

Timeline (cont’d) April-May 2013 – GCC Kitchen & Dining Improvements Project Committee meets with Mark Hewitt and works through many revisions on design to come up with general idea of layout which gets further refined over next year. June 2013 – Eric H & Jim D meet with The Pelsa Company and New Castle County Land Use Planner to review project. Historic Register Status Reviewed and Determined Not Impacted by Project. Need to engage Fire Marshall, DNREC and DelDot.

Timeline (cont’d) July 2013 – Ongoing planning with the McMahon Group on developing presentation for the membership to explain the project and motivations behind the project. Board meets with McMahon Group to review and refine upcoming Town Hall Member Presentations – Eric Holloway, Jim Davis and John Wolak meet for lunch with PNC, WSFS, M&T, Univest, Bank of America, and Fulton Bank. All but PNC present term sheets

Timeline (cont’d) August & September 2013 – Two Town Hall Presentations to GCC Membership – Presentations video taped and hosted on GCC website Fall 2013 – The rest of 2013 is spent refining drawings in order to develop construction drawings with which to bid the project. This nuts/bolts portion of the development involves meetings with the kitchen designer and interior designers in order to develop the actual specification from which to bid the project. It is a slow and time consuming process. All the while the Pelsa Company is working through the development plan and developing their drawings with the correct detail with which to present to NCC.

Timeline (cont’d) Winter 2014 – The construction plans are coming together for the bidding process to begin. The Pelsa Company in conversations and a meeting with NCC including Jim Davis and Eric Holloway in attendance determine we will need a variance for parking and subsequently a well head protection area. We hire an attorney, Gary Bride, to assist on these issues

Timeline (cont’d) Spring 2014 – GCC solicits bidders and begins process of bidding project. 6 bidders solicited, 2 decline, 4 bid on project. Initial requests to Signature Construction, Dewson Construction, Snyder Crompton Associates, Nason Construction, Emory Hill and Bancroft Construction (as differentiated from Bancroft Homes)

August 2014 – Four bids are received and range from $3.7M to $4.4M. Project Committee convenes to review bids with architect in attendance. Options are discussed such as pricing on slate versus faux slate, and eliminating construction entrance versus using present entrance, and reducing retaining wall coverage for patio…. Nick Fedyck does quick revision on drawings and specifications asking contractors to make suggestions as well for cost reductions and asks for rebids. Timeline (cont’d)

September 2014 – Rebids are received from 2 contractors. Both contractors are interviewed and bids are discussed in detail. – Project Committee recommended $3M project and Bancroft Construction. Board approved unanimously at September meeting

Project Committees Interior Design Committee – Members-Melinda Penn, Catherine Miller, Michael Dougherty, Kathy Zabel, Anne Martelli, Eric Holloway, Jim Davis – Purpose-to assist in developing the interior look and feel of the new and renovated spaces associated with the Kitchen & Dining Improvements Project – Interviewed Roseanne Brown, Ron Fenstermacher, and Archer & Buchanan. Chose Archer & Buchanan and negotiated contract. – Met with Archer & Buchanan three times to work on the details for the various spaces. Visual boards in process

Project Committees (cont’d) Kitchen Design Committee – Members-Jim Everett, Michael Dougherty, Peter Fontaine, Jim Davis – Purpose-to develop layout of new kitchen space and equipment necessary for new space reusing existing equipment if possible – Interviewed three kitchen design firms- Profitable Food Facilities (national company found through CMAA), Culli Quip out of New Jersey and chose Barry Harden of Commercial Food Service Design Consultants – Met with Barry Harden three times on site and developed equipment listing and layout for new kitchen

Project Committees (cont’d) Construction Architect Committee – Members-Eric Holloway, Kurt Faller & Jim Davis – Objective to convert Mark Hewitt’s conceptual drawings to “biddable construction documents” meeting NCC Code. – Interviewed three commercial architects-Dave Dalby, Mark Hitchcock – Architecture Plus, and chose Kevin Wilson and Nick Fedyck of Architectural Alliance – Have had multiple meetings with Nick to refine and further refine drawings to obtain optimal use of space

Special Thanks Michael Dougherty Kurt Faller Greg Pettinaro Melinda Penn