Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Federal Audit Executive Council (FAEC) June 2012 Bi-Monthly Meeting Heather I. Keister Doris G. Yanger June 14, 2012 Green Book Update.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Campus Improvement Plans
EDDIE TERRILL AIR QUALITY DIVISION DEPT. OF ENVIRONMENTAL QUALITY AUGUST 21, 2014 EPA’s 111(d) Clean Power Plan Rule: A DEQ Perspective.
From Cutting Red Tape to Maximizing Net Benefits Alexander T. Hunt U.S. Office of Management and Budget Challenges on Cutting Red Tape Rotterdam, The Netherlands.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Expanded Version of COSO a presentation by Steve Wadleigh Expanded Version of COSO a presentation by Steve Wadleigh Standards for Internal Control in the.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
1 Business Continuity and Compliance Working Together Kristy Justice, AVP WaMu Card Services 08/19/2008.
1 Portfolio Committee on Home Affairs Presentation on Internal Audit 19 April 2013 Building a New Home Affairs.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Internal Auditing and Outsourcing
File & Suspend Rate Cases Water & Wastewater Reference Manual1.
Energy Efficiency in the Clean Power Plan Opportunities for Virginia Mary Shoemaker Research Assistant Spring 2015 VAEEC Meeting May 11, 2015.
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Internal Control in a Financial Statement Audit
Water Supply Planning Initiative State Water Commission November 22, 2004.
Patient Protection and Affordable Care Act March 23, 2010.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Rate Reform Research and Communications Committee April 7, 2011.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
ALTERNATIVES TO BART -TRADING- Lily Wong USEPA – Region 9 September 1, 2005.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
1 Kansas City Power & Light Home Performance with ENERGY STAR® Program Updates January 14, 2014.
1 Review of CPUC Role with the Public Interest Energy Research (PIER) Program on Natural Gas Briefing for California Senate Energy, Utilities and Communications.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
The Facts About Schoolsite Councils The Roles and Responsibilities of a Schoolsite Council.
Wholesale Market Rule Monitoring and Enforcement by the Public Utility Commission of Texas Danielle Jaussaud PUCT Wholesale Market Oversight March 23,
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
1 CSI Staff Proposal Workshop Energy Division California Public Utilities Commission November 17, 2010.
Data Integrity Issues: How to Proceed? Engineering Node Elizabeth Rye August 3, 2006
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
Puerto Rico Electric Power
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Alternatives to BART Rule Discussion with WRAP Nov , 2006.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
 Ensure utilities plan for and provide services by which Missouri’s residents and businesses can achieve their goals with less energy over time, with.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Governance and Institutional Arrangements What they have to do with Regional Water Planning (RWP)
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
WHAT TO EXPECT: A CROWN CORPORATION’S GUIDE TO A SPECIAL EXAMINATION
Charter School Legislation HB 1390 and SB 737.
Presentation transcript:

Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31, 2009

2 Background The Integrated Resource Plan or IRP is a process defined in 4 CSR Currently we files separate IRPs for both Kansas City Power & Light (“KCP&L”) and KCP&L-Greater Missouri Operations Company (“GMO”). The Companies submitted responses to an August 4 list of Staff questions. These responses detailed our concerns regarding the latest version of the proposed Chapter 22 rule. Our chief concerns are condensed within the following slides. A more complete discussion of our position can be found in EFIS.

3 Commission’s Current Policy Goal— established per the rule in 1993 Set minimum standards to govern the scope and objectives of the resource planning process…to ensure that the public interest is adequately served. Compliance with the rule does not result in commission approval of any plan, strategy, or investment decision. The stated objective is to provide the public with energy services that are safe, reliable and efficient, at just and reasonable rates.

4 Current Fundamental Requirements Minimize present worth of long-run utility costs as the primary selection criteria when choosing the Preferred Resource Plan. Consider and analyze demand side efficiency and energy management measures on an equal basis as supply-side alternatives. Identify and analyze factors which are critical to meeting the fundamental objective of the resource planning process, but which may negatively affect the minimization of long-run utility costs. Those associated with alternative resource plans Those associated with new or more stringent environmental laws or regulations Rate increases associated with alternative resource plans

5 What’s changed since 1993? Nothing Utilities still need to conduct planning to ensure that the public interest is adequately served. Utilities still need to provide the public with energy services that are safe, reliable and efficient, at just and reasonable rates. Utilities still need to minimize long-run utility costs. Utilities still need to include demand side efficiency and energy management measures. Utilities still need to identify risks and be prepared to modify their plans if conditions change.

6 What’s changed since 1993? Everything Technology For planning analysis For energy delivery (Transmission and Distribution) For demand side efficiency and management New markets for electric power and emission products Regional Transmission Organizations (RTO) Environmental Concerns Federal Mandates Renewable Energy Standards Laws Potential Cap and Trade Legislation Risk Financial, generation and environmental requirements

7 What needs to change in the rule? Nothing The current policy—planning processes that ensure that the public interest is adequately served is as valid today as it was in The current objective to provide the public with energy services that are safe, reliable and efficient, at just and reasonable rates is as valid today as it was in 1993.

8 What needs to change in the rule? Everything We need to change the focus from “what we didn’t do” to “the Plan” We need to focus more on the objectives set out in the rule, rather than the reports and deficiencies. We need the IRP to help us mitigate risk associated with large projects We need a mechanism to use our IRP to seek approval to proceed with specific projects. This could be within the IRP, or separate but relying on IRP.

9 What would be the result of these changes? This process could be our strategic planning process. The final report should be an opportunity for Staff and the stakeholders to review our plan The final product would be our resource strategy. Adequately analyze the risks associated with conducting this strategy Provide all stakeholders with information they need to assist in achieving safe, reliable electricity in accordance with applicable law.

10 Current IRP Rule In practice, the current IRP process is a long checklist of items to complete. Many requests for data provide little or no value to the primary objective of the process. Differing interpretations of the rules by various parties can lead to generating deficiencies. Many issues with the current rule are resolved by use of waivers With each utility having recent experience with an IRP filing, most of the waiver process is becoming routine.

11 Proposed IRP Rule The proposed rule has addressed several issues that the utilities have routinely requested waivers The proposed IRP process however lengthens the checklist of tasks to complete. Differing interpretations of the rules by various parties can lead to generating deficiencies. Many new issues are being addressed which have little in common with the primary objective Using the IRP process to conduct analysis in support of other objectives For example, developing plans that assume no renewable resources to support what may become Chapter 20. Compliance with the current applicable law should be sufficient guidance in the planning process.

12 Proposal #1 Commission should write the rule to set goals and high level objectives of each section. Require the companies to develop the best method to achieve those goals. The companies will still be required to submit their findings to stakeholders who are able to comment on how well the companies met these goals. Allows the Commission and Companies to focus on providing high-value information to stakeholders. Commission defines what information is needed, not how a company is to calculate and plot it.

13 Proposal #2 Utilities would submit subject matter to stakeholders in staggered timeframes Timeline example: Utility submits Load Analysis, Supply-Side and Demand-Side Volumes. Within 90 days: Stakeholders meet and discuss submittals Within 90 days after stakeholder meeting: Utility submits Integrated Analysis and Risk and Strategy Selection Volumes. Moves at least a portion of the long process of after- the-fact deficiency discussions up front to potentially resolve (or at least identify) areas of concern among various stakeholders. Puts the spot light on Integrated Analysis, which produces the Preferred Resource Plan

14 Proposal # 3 Conduct periodic stakeholder IRP advisory meetings, at least on an annual basis Purpose of advisory meeting would be to present and review resource planning status, methodologies and assumptions and other issues. Continuation of the three-year formal report filings.