A. Perin TE-CRG, 06 April 2009 1 LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 2 4 th LHC Splice Review, July 22-24, 2013 O. Pirotte (TE-CRG), A. Perin (TE-CRG)
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Interface issues on Super-FRS magnets test at CERN
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
HC review, A. Perin, 12-MAY DFB Project LHC hardware commissioning review May 2005 Hardware commissioning of the DFBs and DSLs and connection.
Interconnection work for the the QRL cryogenic extensions Ivo Slits - AT/CRI
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Overview of the ESS Linac Cryogenic Distribution System
AT/CRG/cd 1 DFBX Low Current Lead Chimneys Consolidation May 16th 2008.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
CERN – Zanon discussions
Roadmap for triplet cryostats
IT-4189 Supply and installation of a cryogenic distribution system
HFM Test Station Main Cryostat
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Update of cryogenic activities
LS1 Committee January 24th, 2014
J.M. Jimenez On behalf of TE-VSC group
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
Cryostat design Mechanical design: Thermal screens: Specifications:
PANDA The conceptual design of the control Dewar
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
LHC Machine Advisory Committee Meeting no. 19, June 2006 DFB status
Status of QQXF cryostat
Shortening the long RQF/RQD busbar segments in points 1 and 5
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG

A. Perin TE-CRG, 06 April Pressure relief devices to be installed on DFBs and DSLs EquipmentProtectionRemarks# DFBM (1)1 DN DN200 (link) All DFBMs but DFBMD/H 19 DFBM (2)1 DN DN100 (link) DFBMD / DFBMH 4 DFBL1 DN200 5 DFBA HCM4 DN DFBA LCM1 DN200 (+ 1 DN200 on link when powering Q6) DSL (P1, P5)/ Covered by DFBL and SAM/Semi-SAM / DSLC (P3)3 DN L. Tavian

A. Perin TE-CRG, 06 April Pressure relief for the DFBM / DFBA LCM links 1 x DN 200 valve on interconnection sleeve relief of DFBM box: 1 x DN100 valve special cases: DFBMH & DFBMD, DFBAD, DFBAC/O Interface to Quadrupole Busbar interconnection 1 x DN200 1 x DN100

A. Perin TE-CRG, 06 April Pressure relief device DFBM / DFBA LCM link Hydraulic plug Pipe diam 54 mm Link with spacer Spacers Pipe int diameter 213 mm Cross section of BB duct: 23 cm 2 Cross section of link with spacers: approx. 80 cm 2 MCI: 4.5 K, DP = 1.3 bar, Mass flow (MCI): K 1 x DN200 Busbar interconnection

A. Perin TE-CRG, 06 April Pressure relief for the DFBM / DFBA LCM links: "standard" and special cases "standard" DFBM link (19) DFBMD/H link (4) DFBAC/O/D links (3+3)

A. Perin TE-CRG, 06 April Practical implementation Reuse existing flanges / springs DN 200 : same as the ones installed on the dipoles DN 100 : same as used on the rest of LHC (ISO K + springs) Installation on the link rectangular cut in the interconnecion sleeve saddle "patch" with DN200 port welded onto the interconnection sleeve. Validated on prototype. Helium discharge direction for DN100 on DFBM CL module: horizontal discharge will need a deflector. Installation of elbow is impractical and would require demounting of the service chimney. for DN200: two possibilities (see next slide): short duct with deflector Relief valve installed on link of DFBMM.5L6

A. Perin TE-CRG, 06 April Pressure relief for the DFBM / DFBA LCM "standard" links DN200 valve DN100 valve DN200 valve DN100 valve Short duct + deflectorLong duct Deflector for DN100 valve Deflector for DN200 valve Short duct + deflectorLong duct +- Reduced risk of interference with other equipment / survey - applicable with small variants to all DFBMs - better access during welding - no mechanical risk to the link - No need of deflector on DN200 - More defined flow during discharge - Only one item. Cannot be demounted. -- Needs an additional deflector (but can be done later) - flow of helium less controled - deflector can be demounted - possible interference with other equipment. Needs to be checked for each DFBM. Possible variants. (time !!!) - not applicable for DFBMD & DFBMH - reduced access during welding - momentum on link if bad handling Preferred solution

A. Perin TE-CRG, 06 April Pressure relief devices for a DFBA 1 x DN100 High current module (HCM) SHM-HCM Interconnection Shuffling module (SHM) Low current module (LCM) HCM - LCM Interconnection 4 x DN230 1 x DN200 Prototype valve under test

A. Perin TE-CRG, 06 April Deflectors in front of the relief valves Objective: avoid jet of cold helium below approx. 1.5m from ground 75 mm 400 mm 1500 mm 200 mm With deflector

A. Perin TE-CRG, 06 April Work distribution: work on the vacuum tanks for equipment at atm. pressure Equipment atm. pressure ProtectionResponsible of production / installation# in 2009 DFBM + DFBA LCM linkDN100 + DN200 / DN 100 (link) TE-CRG: tunnel operations TE-VSC: springs for DN100 EN-MME: supply of components TE-MSC: DN200 valves 23 (DFBM) 6 (DFBA LCM) DFBL1 x DN200TE-CRG: tunnel operations + logistics TE-VSC: springs for DN200 EN-MME: workshop operation + components TE-MSC: DN200 valves 5 DFBA HCM4 x DN230TE-CRG: tunnel operations EN-MME: workshop machining + supply of all components 32 (8 DFBA) DFBA LCM1 x DN200 on chimneyTE-CRG: tunnel operations TE-VSC: springs for DN200 TE-CRG: tunnel operations + logistics EN-MME (to be confirmed) 6 DSL (P1, P5) magnetCovered by DFBL and SAM/Semi-SAM/ DSLC (P3)3 x DN 200TE-CRG: tunnel operation EN-MME: possible supply of components 3

A. Perin TE-CRG, 06 April Work distribution: work on deflectors and supports Equipment at atm. pressure Protection measuresResponsible of production / installation # in 2009 DFBA HCMDeflector for DN230EN-MME8 DFBA LCMDeflector on DN200TE-CRG6 DFBLDeflector for DN200EN-MME5 DFBMDeflector for DN200 Deflector on DN100 TE-CRG29 Equipment under vacuum Protection measuresResponsible of production / installation # in 2009 DFBA HCMReinforcement of supports EN-MME8 DFBA HCMDeflector for Chimney?EN-MME8 DFBA LCMDeflector for DN100TE-CRG6

A. Perin TE-CRG, 06 April Estimation of durations for work on cryostats EquipmentProtectionEstimated duration / DFB or DSL# in 2009 DFBM + DFBA LCM linkDN100 + DN200 / DN 100 (link) 0.5 day tunnel operation (confirmed) + production of components 23 (DFBM) 6 (DFBA LCM) DFBL1 x DN2006 days - demounting : 1 day - machining (workshop): 1 day - remounting: 1 day - logistics: 3 days 5 DFBA HCM4 x DN2307 days - demounting : 1 day - machining (workshop): 2 days - remounting: 1 day - logistics: 3 days 32 (8 DFBA) DFBA LCM1 x DN200 on chimney2 days - machining (workshop): 1 day - demounting / remounting: 1 day 6 DSL (P1, P5) magnetn.a./ DSLC (P3)3 x DN days3