LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
LAV HV repair plans Matthew Moulson
University of Wisconsin
LAV front-end and readout status
Ti/SS transitions A.Basti INFN-PISA*
NA62 LAV Anti1 REMOVAL & TESTS
ELENA installation and commissioning status
T1 Electronic status Conclusions Electronics Cards:
Renovation of the 45-year old PS magnets
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Presentation transcript:

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes mounted on DN40 CF flanges delivered to Frascati 04/12

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 HV test program for new feedthroughs 3 Measurement of leakage current at 4 kV, pin-to-pin and pin-to-ground Performed December 2015 Endurance testing of 2 feedthroughs: all pins at 2kV for ~1 month In progress Not much time to validate solutions: Test as best we can in available time Additional considerations: Accelerate aging by application of thermal cycles? Concerns about hygroscopicity? PEEK hygroscopicity very low but not zero (0.1% water absorption) Difficult to measure – need control over relative humidity

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 HV leakage tests at 4 kV 4 Performed in Frascati in December by G. Corradi, D. Tagnani, S. Ceravolo HV on 1 central pin and 1 outer pin Pins in 2nd ring connected to nanoamperometer, current measured to ground Connector body grounded Pins in outer ring tested individually Typical leakage current = 20 pA Test conditions Test voltage 4kV Temperature C Relative humidity 20%

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 HV leakage tests vs. humidity 5 Bell jar with gradual evaporation of water from dish, hygrometer to measure RH Female cable plug inserted Tested at 4 kV over several few days Kept at 2 kV during Christmas closure

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Long term HV tests 6 Attempt first to reproduce failures at Frascati: LAV04 and LAV08 flanges from experiment 3 HV boards and cables = can test 3 feedthroughs Empty vacuum side connectors attached for safety Flanges grounded to HV chassis

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Long term HV tests 7 After failures reproduced, compare performance of new prototypes: Prototypes #1 and #2 mounted on 40mm CF flanges, grounded Compare time-to-failure with LAV4.05 feedthrough (never used in NA62)

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Long term HV tests: Summary 8 ConnectorHistoryTest conditionResult LAV Multiple fails in hrs at 1500V 3 connectors in series 13 ch tripped (10 uA) 9 ch drawing (1 uA) Failure reproduced LAV8.01Multiple fails in hrs at 1500V7 ch tripped (10 uA) 6 ch drawing (1 uA) Failure reproduced LAV8.00No fails in hrs at 1500V1 ch tripped (10 uA) Partly reproduced LAV4.05Never used280 hrs at 1500VNo problems observed Prototype #2New design (PEEK)280 hrs at 1500VNo problems observed Prototype #1New design (PEEK)235 hrs at 1500VNo problems observed Feedthroughs that failed during run also fail in lab tests Tests of new feedthroughs not yet long enough to cause failure of control case (an original feedthrough that was never used)

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Summary of vacuum tests 9 Prototype #1Originally supplied with visible defect in weld to flange Used for electrical tests and repaired after Christmas closure After repair, tested at Vaqtec: Cycled between 0C and 100C before testing Vaqtec leak measurement: 1 × 10 −10 mbar l/s Returned to Frascati to confirm test results Frascati leak measurement: 1 × 10 −12 mbar l/s Prototype #2Satisfactory test at Frascati on delivery in December First leak test: 3 × 10 −9 mbar l/s Unchanged after 1 cycle to 70C (4 hrs) After 2 cycles to 80C leak rate 3 × 10 −8 mbar l/s Prototype #3Supplied in December with suspected defect in weld to flange Repaired at Vaqtec and tested to 1 × 10 −10 mbar l/s Test confirmed at Vacqtec/Ecovide after 2 cycles to 75C Tested at Frascati mid-January: major leak inside feedthough body Returned to Vaqtec again for examination Problem discovered with weld between parts of feedthrough PEEK assembly tested with vacuum putty to 4 × 10 −10

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Diagnosis of prototype #3 10 Connector disassembled and problem spotted on weld between connector halves Weld was probably critical and failed after thermal cycles PEEK capsule cannot be re-tested in a new assembly: knife-edge seal We think the problem is understood, but need careful QC for welds during production

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Mechanical design for new HV flange 11 Feedthroughs individally mounted on custom DN40 flanges Defective connectors can be replaced without welding Mechanical design nearly final, parts ordered Cost ~€15k/11 flanges

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Mechanical design for new HV flange 12 Feedthrough flanges slightly smaller than standard CF, with O-ring seal Flange thickness optimized for access to bayonet from both sides No centering ring for large O-ring Helps to recover space for HV cables

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Cables and plug connectors 13 HV cables removed and brought to SPIE 30/11-04/12 SPIE set up test equipment in December Automated tests for continuity, channel map, HV leakage Plug connectors delivered by RS 2 nd week of January Connector replacement completed by SPIE by 01/02 We now have better cable diagnostics than ever before: 7 inversions found on Radiall side – can be fixed by inversion on MIL side 2 cables with 1 pin missed and translation error propagated to remaining pins – can be fixed on MIL side with some effort 2 cables with continuity problems on single channels traced to Radiall side – requires replacement of Radiall connector, deferred Test procedure verified using our equipment Monday 08/02 3 sample cables tested 1 continuity problem found by SPIE found also by me 1 cable found to be good by SPIE found to be good by me 1 continuity problem found by SPIE not found by me, but not found by SPIE when re-tested – intermittent problem

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Schedule 14 04/10 (done)Uncable LAV HV, bring cables to SPIE 05/01 (done 08/01)Plug connectors delivered, SPIE starts work on cables 08/01 (done 29/01) Last date to order flanges for feedthrough delivery 01/03 Delayed by one month, will try to recover 01/02 (done?) New HV cables ready Last few inversions and corrections to do this week 15-19/02Frascati technicians re-install install HV cables 01/03 Feedthroughs ready at Vaqtec, installation in flanges Will probably slip a week or two 15/03Flanges ready for installation and testing 01/04Begin to evacuate blue tube. All work completed Largely on schedule, but have probably incurred a small delay (~ 1 week)

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Addendum: Spare LAV-FEE boards 15 Comprehensive survey in May problem boards + 3 usable (at least half) Situation evolved during run – need new survey Currently 5 uninstalled boards, with good diagnostics 2 have problems with individual channels – substitute ToT mezzanines? 3 with major problems – to be used for spares Some pieces may have already been used

LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Addendum: Primary HV power supplies 16 Meeting with G. Di Maio, CAEN, 16 December ROAL does not like the MOSFET used to ruggedize the PS for LAV2 2 alternatives suggested, 1 similar to the MOSFET used for LAV2 Decide to modify all PSs Decide to upgrade 50% of PSs with 1 of the 2 suggested MOSFETs, 50% with the other Upgrade work is being performed by ROAL ROAL modules should be available Feb CAEN personnel will install ROAL modules in A4531s at CERN Work will be done in ECN3 Updates from Riccardo