NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U Team Meeting August 14, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

V. A. SOUKHANOVSKII, NSTX-U FACILITY ENHANCEMENT BRAINSTORMING, 7 February 2012 Proposed Facility Enhancements for NSTX Upgrade V. A. Soukhanovskii for.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX-U 5 year plan text finalization J. Menard 5YP Update Meeting B318 March 28, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Program Update J. Menard For the NSTX-U Research Team NSTX-U Team Meeting PPPL – B318 June 5, 2015 NSTX-U Supported by Culham Sci Ctr York U Chubu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Non-axisymmetric Control Coil Upgrade and related ideas NSTX Supported by V1.0 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
Development of Improved Vertical Position Control S.P. Gerhardt, E. Kolemen ASC Session, NSTX 2011/12 Research Forum Location Date NSTX Supported by College.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
Some Halo Current Measurements in 2009 S.P. Gerhardt Thanks to: E. Fredrickson, H. Takahashi, L. Guttadora NSTX Results Review, 2009 NSTX Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX NSTX Team Meeting –Masa Ono June 5, 2015 NSTX-U Team Meeting June 5, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting May 5, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting December 4, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX 2007 MHD XP Review – J. Menard 1 Optimization of RFA detection algorithms during dynamic error field correction Presented by: J.E. Menard, PPPL Final.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting –Masa Ono May 1, 2015 NSTX-U Team Meeting May 1, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
V. A. Soukhanovskii, XP1002 Review, 9 June 2010, Princeton, NJ 1 of 9 XP 1002: Core impurity density and P rad reduction using divertor condition modifications.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U Team Meeting August 14, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew U Ioffe Inst RRC Kurchatov Inst TRINITI NFRI KAIST POSTECH Seoul National U ASIPP ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Washington U Wisconsin NSTX-U Supported by

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Time: 1:30 ~ 3:00, August 14 (Friday), 2015 Place: Auditorium, PPPL General Items (10 minutes) M.O. CD-4 KPP Plasma Operations (30 minutes) D.B. Experimental research operations (20 minutes) S.G. Engineering operations (10 minutes) A.V-H. Program Items (20 minutes) J.M. NSTX-U Team Meeting Agenda 2

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 NSTX-U operational preparation activity (e.g., diagnostic installation) requires constant vigilance regarding safety! Summer vacation season is here! - Proper protective clothing if working outdoor (e.g., long sleeve shirts and pants) - Mindful of summer heat and sun / dehydration and sun screen - Be safe and have fun! Safely, Safely, Safely 3 ES&H Issues (J. Levine) The need to work safely and carefully during the cleanup and recommissioning process and to use the Lab processes including JHAs to plan and execute work.

NSTX NSTX Team Meeting –Masa Ono August 14, action items suggested by the internal and external reviews 26 main action items combining similar ones together. 11 main items before CD-4 and the rest are 15 are after CD-4. There was a hold point (touch point with OFES) before the TF flex bus installation. DOE approval received on June 22, External committee recommended to have the root cause analysis feeds into ACC before CD-4. That is the present plan. The present schedule shows CD-4 to be mid-August. We will try our best to start as soon as possible. But we will take the necessary time to get the job done correctly. OH arc recovery action activities Repair/improvements completed and preparing for restart

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 The overall health of the NSTX-U machine appears good. –The damage was contained to external to OH coil (and other coils) –Electrical continuity/insulation and hydrostatic testing of the OH coil (and other coils nearby) indicate the coils are fine. –Magnetic diagnostics check out fine. –Bottom umbrella removed and inspected. Bottom area including support bracket improved. OH Arc Recovery Status Summary No significant damages and improvements implemented June 22, 2015 –OH coil grounding loop eliminated and hose clamp improved. –OH cooling water support bracket electrical insulation improved. –Insulation tapes / bus supports generally improved.

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 A number of improvements and “Extent of Condition” issues have been identified and many were implemented. OH co-ax feed enhanced structurally with injection of epoxy. Grounding added to the bottom to minimize fault voltage. July 15, 2015 July 19, 2015 Inner OH Power Feed Lower OH Grounding Assembled OH Power Feed

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 The NSTX-U Reassembly Went Very Well ISTP completed and CD-4 KPP plasma achieved on August 10 TF / OH electrical joints individually measured and compared with model July 19, 2015

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Steps Toward Research Plasma Operations Post-CD-4 / research operation activities MPTS R&R NBI 1 & 2 MAPP, Fast Mirnov, X-ray, bolometer, plasma TV, VIPS, etc. Dummy load testing Boronization, GDCs, gas Injector-4, LITER, SGI, Divertor inj., MGI, CGI, etc. Bakeout: June hours (15 ays), February hours (20 days) Need 3 days to set-up and 2 days to remove Challenge is the test cell availability before research operations Bakeout Commiss ioning CD4 First Plasma (8/10) PTP/ISTP OH Repair Boronization Repair complete Research Plasma Operation The NBI CD-4 KPP achieved on May 11, The CS CD-4 KPP achieved on August 10, R/R, Vent PF1b dTMB August 2015September 2015October 2015July 2015November 2015 ISTP

NSTX NSTX Team Meeting –Masa Ono August 14, 2015 New center-stack 2nd NBI Li granule injector High-Z PFC diagnostics Off-midplane 3D coils (NCC) up to 1 MA plasma gun Lower divertor cryo-pump Upgraded CHI for ~0.5MA LLD using bakeable cryo-baffle DBS, PCI, or other intermediate-k Divertor P rad Snowflake Run Weeks: Five Year Facility Enhancement Plan (green – ongoing) 2015: Engineering design for high-Z tiles, Cryo-Pump, NCC, ECH MGI disruption mitigation 4 coil AE antenna HHFW limiter upgrade Establish control of: Rotation Upward LiTER High k  Laser blow-off Boronization Enhanced MHD sensors Neutron collimator Charged fusion product Upgraded halo sensors Pulse-burst MPTS nene Integrated Scenarios Core Science Boundary Science + Particle Control Upgrade Outage1.5  2 MA, 1s  5s MAPP 42 ch MPTS 48 ch BES MSE/LIF FIReTIP Major enhancements: Base funding +15% incremental Fiscal Year: 1 MW ECH/EBW High-Z tile row on lower OBD  B diag. - incremental MA CHI q min