Doc.: IEEE 802.11-05/1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 1 Initial Network Selection Concept Notice: This document.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0866r1 Submission September 2005 Michael Montemurro, Chantry NetworksSlide 1 Mobility Domain Definition and Description Notice: This.
Advertisements

Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0618r1 Submission July 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 TGu Down Selection Procedure Notice: This document has been.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0028r0 Submission January 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 Definitions and Terminology Notice: This document has been.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
TGu Timeline Date: Authors: March 2006 March 2006
[ Interim Meetings 2006] Date: Authors: July 2005
TGu/TGv Joint Session Date: Authors: July 2005 July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
3GPP Extended Date: Authors: July 2005 July 2005
[ Policies and Procedure Summary]
TGu Pre-Proposal Presentations
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
Emergency Call Motion Date: Authors: January 2006
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: March 2006 March 2006
TGu Pre-Proposal Presentations
TGu Pre-Proposal Presentations
TGu Closing Report Date: Authors: July 2006 July 2006
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGu Motions Date: Authors: May 2007 May 2007
TGu Closing Report Date: Authors: September 2005
TGu Closing Report Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
Authentication Cluster
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
Authentication Cluster
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
Document Motions Date: Authors: November 2005 November 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
TGu Motions Date: Authors: May 2006 May 2006
TGu Closing Report Date: Authors: January 2006 January 2006
Draft P802.11s D1.03 WordConversion
TGu liaisons Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
Transition Nowhere Date: Authors: Sept 2005 Sept 2005
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: July 2005 July 2005
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 1 Initial Network Selection Concept Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 2 Abstract This document specifies a proposal to address the requirements in the Network Selection Cluster for TGu. The proposal specifies additional Information Elements for use in Probe Request and Probe Response messages to provide information required by the STA as part of its network selection decision before association.

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 3 Using a Probe Request/Response to Determine Support for an NAI NAI given in Probe Request Probe Response indicates whether the AAA infrastructure can authenticate the user

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 4 New Information Elements NAI can be limited to NAI in Probe Request NAI plus ack/nack flag in Probe Request

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 5 Using Probe Request/Response for IEEE Information Service IEs

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 6 New Information Elements List of requested IEs in Probe Request Set of IEs in Probe Request

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 7 Requirements Conformance (Self Evaluation) Addresses all of the requirements in the Network Selection Cluster of IEEE /0822r0 with a classification of ‘Required’ –R0N1, R0N2, R0N3, R0N4 It does not attempt to satisfy the optional requirement R0N5 or the out-of-scope requirements R0N6 and R0N7. It may fulfil some of the requirements in the IEEE MIH Support Cluster. Minimization of battery consumption has been considered (as suggested by d15M1 of IEEE /0279r15 ) Scalability issues considered –Directed messages –‘NAI Probe’ mechanism scales O(1) with number of SSPNs –Scalability considerations IEEE related components requires further details from IEEE

doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 8 References u-initial-network-selection-concept.doc