TD/MSD/M&A Group Meeting 4/14/2016. Some FNAL news The new TD web site, was mentioned as being on-line as a prototype for the WordPress.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Budget Update November 7, DISCUSSION ITEMS:
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
NuMI DoE Review of the NuMI Project May 2004 ESH, SA, SAD N. Grossman Page 1 ESH, Shielding Assessment (SA) & SAD: Outline SB&O Construction Phase ESH.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Installation of the T600 at Fermilab CSN2, September 22,
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Jcjc “Weekly” Meeting More Management Insight.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Jcjc “Weekly” Meeting What’s Going On… Monthly MSD Seminar ( 2 nd Tuesday of each month at 4:00pm…) – 3 rd Tuesday of every month, 11:00 am in.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
O. Kester, NuSTAR annual meeting, 27/02/2013
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
“Weekly” Meeting What’s Going On… Monthly MSD Seminar (nominally 2 nd Tuesday of each month at 4:00pm…) – 3 rd Tuesday of every month, 11:00 am.
“Weekly” Meeting Science in the Senate. What’s Going On… Monthly MSD Seminar (nominally 2 nd Tuesday of each month at 4:00pm…) – 3 rd Tuesday of.
Logo area Cold Mass Design, Assembly Plans & QC by US HL-LHC-AUP Antonios Vouris MQXF International Review – CERN, June 7 th – 10 th, 2016.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
“Weekly” Meeting Director and AD’s meet to discuss lab funding.
Head, Office of Project Management Oversight (OPMO)
Jefferson Lab Overview
Overview of LERF Status, Plans and Goals
Electron Beam Systems ETC and Methodology
HL-LHC upgrade at IPHC news
Presentation transcript:

TD/MSD/M&A Group Meeting 4/14/2016

Some FNAL news The new TD web site, was mentioned as being on-line as a prototype for the WordPress model. Thanks from the Office of Communications to everyone involved. Note that Version 2.0 of the Engineering manual has been posted. Paul Czarapata tells us that many of the roles have been clarified. The risk assessment tool has been improved. There are hyperlinks all over the place. Check it out and pass it on. There should be a communication to all engineers soon. 1/10/20142

Notes from Lab Status Meeting Accidents, Incidents, etc. A brass sliver entered an employee’s thumb while carrying out a reaming activity; first aid only. A contract electrician had a shoulder pop while installing cable tray above his head; awaiting diagnosis. Accelerator Operations. Last week, NuMI (Neutrinos at Main Injector) received 1.4E19 and Booster Neutrino Beamline (BNB) received 9.1E18, both in ~150 hours; there was a maintenance day on Wednesday (with the next one scheduled for 1 June). The Booster ran at 15 Hz for 3-4 hours. 6+6 slip stacking studies continue. The PXIE (PIP-II (Proton Improvement Plan) Injector experiment) RFQ (Radio Frequency Quadrupole) beam transmission efficiency is now over 95%, and the buncher is now phase locked to the RFQ. Work continues on notification procedures in the event of a site-wide power outage. Experiment Operations. It was a good week for the running experiments. MT (muon Test Area) has 3 running experiments. ANNIE (Accelerator Neutrino-Neutrino Interaction Experiment) installation continues in the SciBooNE (SciBar Booster Neutrino Experiment) hall. PPD Operations. The g-2 review went well; magnet tuning is now closer to on-schedule. CMS cold box recommissioning went well, and the magnet is cooling. Neutrino Operations. MicroBooNE tested a power supply filter, giving a significant noise reduction. LArIAT presented their first results at last Friday’s W&C, with more to come. ANNIE will soon star commissioning. SBN (Short Baseline Neutrino) far detector building construction is going well. There was a review last week of the DUNE cold electronics ASICs (Application Specific Integrated Circuit). 1/10/20143

Technical Operations. Lifting points came loose when lifting the dome of a tank used for argon welding; this is under study and in discussions with the vendor. The PXIE LEBT (Low Energy Beam Transport) switch dipole has been completed. The LARP prototype quadrupole MQXFS1 testing continues. Yesterday, the LCLS-II (linear Coherent Light source) prototype assembly was moved to ICB. Computing Operations. “A good week, with nothing of note to report”. Data were presented on scientific computing usage, with average wait times ~ 3 hours compared to last week’s ~ 10 hours. Mission Support Operations. The pressure test of 2,600 feet of 30” pipe was successful. There will be much work around the Casey’s Pond Pump House in April and May, with closure of adjacent Wilson Street set for 12 April. Parts of the WH west parking lot will be closed for ICW work on 22/23 April. Village power stayed on while ComEd work was done there last weekend. Financial Report. Budget guidance will be out soon for FY17, including indirect budgets. Office of Communications Report. The Wonders of Science program on Sunday has already sold 600 tickets. On 20 April, there will be a high school student career expo. Proposals are due on Friday for the next AAAS (American Association for the Advancement in Science) annual meeting. There will be an All-Hands meeting on 26 April at 10:30 am. Director’s Report. There were discussions at CERN last week on HE LHC and CERN involvement in the US program. There are upcoming DOE IG (Department of Energy Inspection General) audits of IT and financial reporting; also an “auditors auditing auditors”. The Engineering Manual Version 2 is now posted. 1/10/20144 Notes from Lab Status Meeting

MSD News Personnel changes – New technician has started – Diversity – take it seriously MSD Seminar : Ani suggestions? Goals need to be re-vised – please look at them Official Travel: – Make sure to coordinate your travel with the department – Regardless who pays for your travel – Fermilab will be paying your salary – Insurance issues Budget is tight: – Last year TD overspent the operational budget by ~ 2M – Budget is tight this year – Careful with overtime – Less money for MM Time card and Lab Status contribution – try to get it done by the end of Friday or at least during the weekend 54/14/2016

PROJECT STATUS/PLAN SUMMARIES near term/year term LHC Accel. SupportSF LARP GA/SS/EH/GC/ThS HFM GC/ThS/SS LCLS II SS? PIP-II SS G-2 ThS MICE SF MU2E GA(TS)/SF(DS)/SF(FM)/ThS MAGMEASJDM/SS/ThS/ALL – LARP – HFM – LCLS II – Mu2e – Alignment of TS modules – MMA – ANL related? – CERN – stretched wire system – done? – KEK – stretched wire system – Rotating coil MM system upgrade (SS) 64/14/2016

AOB & SAFETY M&A Meeting – bi-weekly or as needed 16:00-17:00; IB2 conference room – Short overview of a project we are working on and the description of our involvement – cover each projects. Who is next? SAFETY 74/14/2016