Network Move & Upgrade 2008/2009: October 2008 Les Cottrell SLAC for SCCS core services network group (Antonio Ceseracciu, Jared Greeno,Yee Ting Li, Gary.

Slides:



Advertisements
Similar presentations
Real-Time Ticketing Score My Team. Real-Time Ticketing Real-Time Ticketing is an evaluation of your ability to enter tickets and information into ConnectWise.
Advertisements

Cisco 6500 E-Series Chassis Up-grade
Network Printing Windows XP. Setting Up a Network Printer Before you begin this exercise you should configure your target printer with a static IP address.
Operating Systems Concepts 1/e Ruth Watson Chapter 11 Chapter 11 Network Maintenance Ruth Watson.
BOINC The Year in Review David P. Anderson Space Sciences Laboratory U.C. Berkeley 22 Oct 2009.
Network Move & Upgrade 2008/2009: September 2008 Les Cottrell SLAC for SCCS core services network group (Antonio Ceseracciu, Jared Greeno,Yee Ting Li,
Network Printing. Printer sharing Saves money by only needing one printer Increases efficiency of managing resources.
Terri Lahey LCLS Facility Advisory Committee 20 April 2006 LCLS Network Security Terri Lahey.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 8 Introduction to Printers in a Windows Server 2008 Network.
Hands-On Microsoft Windows Server 2003 Networking Chapter 5 Dynamic Host Configuration Protocol.
Understanding Network Failures in Data Centers: Measurement, Analysis and Implications Phillipa Gill University of Toronto Navendu Jain & Nachiappan Nagappan.
Layer 2: Redundancy and High Availability Part 1: General Overview on Assignment 1.
1 Configuring Linksys Wireless Router Prof. Valencia Community College.
Installing software on personal computer
8/9/2015 1:47 AM SurveyCentralOverview.ppt CSC ©Copyright 2012 Online Survey Application: CSC Survey Central System Overview November 26, 2012 Supported.
Technical Training: DIR-615
Remote Accessing Your Home Computer Using VNC and a Dynamic DNS Name.
Terri Lahey EPICS Collaboration Meeting June June 2006 LCLS Network & Support Planning Terri Lahey.
Advanced Networking for DVRs
1 Chapter Overview Creating Sites and Subnets Configuring Intersite Replication Troubleshooting Active Directory Replication.
Managing DHCP. 2 DHCP Overview Is a protocol that allows client computers to automatically receive an IP address and TCP/IP settings from a Server Reduces.
Basic Network Training. Cable/DSL Modem The modem is the first link in the chain It is usually provided by the ISP and often has a coax cable connector.
Overview Print and Document Services Print Management console Printer properties Troubleshooting.
Microsoft Windows 2003 Server. Client/Server Environment Many client computers connect to a server.
Day15 IP Space/Setup. IP Suite of protocols –TCP –UDP –ICMP –GRE… Gives us many benefits –Routing of packets over internet –Fragmentation/Reassembly of.
1 ISA Server 2004 Installation & Configuration Overview By Nicholas Quinn.
Building a Switch-based Network
Fundamentals of Networking Discovery 1, Chapter 2 Operating Systems.
Computer communication
Operating Systems Networking for Home and Small Businesses – Chapter 2 – Introduction To Networking.
ActEyes IP Cam Training Part 1: Camera Setup. Network Setup Overview Each IP Cam on the network will need its own IP address to be assigned. This address.
All Experimenters Meetings Windows 7 Migration 1 April 18, 2011 W7 AEM Presentation.
Module 4: Add Client Computers and Devices to the Network.
Module 14: Configuring Print Resources and Printing Pools.
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
Steps To Set Up Your Home Wireless Network You can use a wireless network to share Internet access, files, printers, and more. Or you can use it to surf.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
EMerge Browser Managed Security Platform Module 3: Startup eMerge Certification Course  Physical connection  TCP/IP Characteristics of PC  Initial connection.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
Support Training Module. Support Manual 1.“On The Lot” – How it all works… 2.Craigslist Settings 3.Post to Craigslist 4.Backpage Settings 5.Post to Backpage.
Cisco Discovery Home and Small Business Networking Chapter 2 – Operating Systems Jeopardy Review Darren Shaver – Kubasaki High School – Okinawa, Japan.
Module 4: Configuring and Troubleshooting DHCP
Terri Lahey Control System Cyber-Security Workshop October 14, SLAC Controls Security Overview Introduction SLAC has multiple.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
WEEK 11 – TOPOLOGIES, TCP/IP, SHARING & SECURITY IT1001- Personal Computer Hardware System & Operations.
6.1 © 2004 Pearson Education, Inc. Exam Designing a Microsoft ® Windows ® Server 2003 Active Directory and Network Infrastructure Lesson 6: Designing.
1 Objectives Discuss the basics of Dynamic Host Configuration Protocol (DHCP) Describe the components and processes of DHCP Install DHCP in a Windows Server.
1. At least two computers 2. Network adapters for each computer. The cost should be approximately $ If you have a 10Base-T adapters, and only.
2: Operating Systems Networking for Home & Small Business.
Windows Vista Inside Out Ch 13: Ch 13: Managing Shared Folders and Printers Last modified
Printing solutions as easy as Cosmos Mono M6 Firmware Update Guide Digital Printing Division Samsung Electronics Company, Ltd.
Network Move & Upgrade 2008 Les Cottrell SLAC for SCCS core services group Presented at the OU Admin Group Meeting August 21,
Technology Coordinator Training. Agenda Getting Started Using SystemCheck Technology Configurations Infrastructure Trial Proctor Caching Overview Managing.
Windows Server 2003 { First Steps and Administration} Benedikt Riedel MCSE + Messaging
Xbox Wireless Errors & Troubleshooting. Network: Failed Internet: Failed Xbox LIVE: Failed NAT: Connection Warning.
IPitomy SIP Trunks 101 Programing and activating SIP Trunks with IPitomy’s assisted turn-up.
Call Center Support Process Web Support & Maintenance for BGC Partners Version 1.1 June 3, 2016 Notice: The enclosed material is proprietary to TRIZE Consulting.
Dynamic Host Configuration Protocol
Frequently Asked Questions (FAQ)
Local Network and Internet Access Network
TC Training & Orientation
Printer Admin Print Job Manager
Unit 27: Network Operating Systems
Design Unit 26 Design a small or home office network
Examining IP Addressing
How to Fix Brother Printer Offline Status with Free Brother Printer Support? VISIT WEBSITE.
Chapter 2: Scaling VLANs
Fundamentals of Computer Networks
Operating Systems Networking for Home and Small Businesses – Chapter 2 – Introduction To Networking.
Presentation transcript:

Network Move & Upgrade 2008/2009: October 2008 Les Cottrell SLAC for SCCS core services network group (Antonio Ceseracciu, Jared Greeno,Yee Ting Li, Gary Buhrmaster), Presented at the OU Admin Group Meeting October 16,

Why move ~ 70 Building Switches connected to old core switch that has to “move” to seismically retrofitted area While at it, replace old, beyond end of life, limited capability switches to provide better service

Move Types Already done: Kavli, MCC, LCLS, SSRL ( 70 switches, 17 need replacing, will probably need to re-address later, SSRL decision) Migrate: Switch beyond end of life, features missing (auto negotiation, higher speeds) = replace switch, connect to new core, re-address hosts –(CGB1), TL1, (WHS), CLA1, CLA2, 280, CL1..2, B267, CGB3 Move - 1: Switch OK = use same switch but connect to temporary core switch, readdress later (after April 15 th 2009) –B214, B031, B210, B005, B275, B279, CLR113, CLR224, CLR343, HFB1, HFB2, MCC-CORE1..2, MCC- WAPCORE1..2, ROB, Research Yard: SWH-RY, B062, B104A, B113, B121, B124, B128, B211, B225, B231, B420 Move – 2: Switch beyond end of life etc., but not central responsibility to upgrade = connect to temporary core switch –Guest House has 2, PEP ring has 4 but ring de-commissioned at moment Move – 3: Switch shares trunk cable, requires long (2 days) workday outage, or overtime (cost depends on what cables have to move etc., estimating costs probably $5K (2 technicians for 2 days) –Guest House 1 &2, ESA, CRYO, IR12, CGB2 (1 day). –Will send an to OU Admins with head’s up so can contact and warn users, get account if need non-working hours and schedule.

Long Outage Switches Contact users, group leaders to see if can take outage in normal work hours or get an account for overtime (could be $5K), schedule outage –ESA (21): Tyler Adams (11), Nicholas Arias (2), Rafael Gomez (5), Zen Szalata (3) –Cryo (7 hosts): Agustin Burgos (5), Tom Galeto (2) –IR12 (4 hosts): Tala Cadorna (1), Raymond Lo (3) gives details of hosts on switcheswww.slac.stanford.edu/grp/scs/net/racks/slaconly/switches/

Experience with Moves Moves are easy: –Each building switch has two (for redundancy) fibre pairs to two old core routers on to B050 floor 2 –Prepare port in 2 temporary (probably ~ 1 year) switches in seismically retrofitted area –Identify pairs and prepare jumpers –Move backup pair to backup temporary switch –Move primary pair to primary temporary switch. –Two ~ 5 second outages, users unlikely to notice. No need for detailed coordination with OU admins, users, can do whenever we get to it etc. Could publish a schedule in future to all OU admins, but will require more effort, scheduling, easier to notify when done, or 5 mins before do it

Migrations Require re-addressing & close coordination ID Admins (can be many) & switch ports etc. create web page documenting what has to be done, addresses, set up tracking tickets etc. to admins request them to validate CANDO info and read web page: –Three types of hosts: printers, SLAC only, open access to world. Meet with admins, explain, schedule time Install replacement switch when appropriate, configure With each admin, a network tech and a network engineer move cables one by one from old switch to replacement, re-address host, check things work etc. During or shortly after migration, network engineer will update CANDO with new IP address. To date, have been migrating all of one OU Admin’s machines at a time.

Migration Experience Two switches almost done (CGB1, TL1), elapsed > 1 week Difficult, labor intensive, requires lots of coordination, availability, impacts users Problems with devices not being in the documented place, patch panel labeling being wrong, patch cables not being long enough Be wary of old, non-standard devices Devices that have been turned off do not show up on our spreadsheets Takes time to get print queues changed on Windows, but can be requested in advance Will be setting a hard deadline depending on # devices etc.

Lessons learned New networks require different subnet mask and default gateway; make sure this is clear. Make sure all devices have an IP assigned in advance to reduce confusion. Confirm which devices should be SLAC Only (IFZ) vs Public in advance. When replacing the switch, can take up to 15 minutes per device (walk to machine, log in, change IP, request cable change, test), so be prepared and patient. Use ipconfig /registerdns on Windows computers to make sure Windows DNS gets updated, then test and inform windows-admin if IP is still wrong. Still working on developing automation to change Windows system IPs.

Progress Temporary switches CORE3OLD in seismically retrofitted area – Sep 08 Need reconfig and connect up & CORE4OLD CORE4OLD in seismically retrofitted area – Oct 08 CORE4OLD in place too

See “Seismic Retrofitting Rack Move 2008” site – +Move+2008https://confluence.slac.stanford.edu/display/NetMan/Seismic+Retrofitting+Rack +Move+2008 –Contains background information, overview of procedures, milestones, drill down to lots more details (tickets, spreadsheets, subnet allocations, hosts on individual switches etc.) –This is where to go to get detailed information. It is very dynamic. –If you need more, let us know we will add as appropriate to core-neteng There is an FAQ at Documentation

New Area New area circa Aug 21 ‘08 New area circa Sep 18 ‘08 New area circa Oct 15 ‘08

Central Routers SWH-CORE1&2-OLD in old racks CORE3OLD in seismically retrofitted area – Sep 08 Need reconfig and connect up & CORE4OLD