HE NgCCM integration issues Ianos Schmidt, August 26, 2015.

Slides:



Advertisements
Similar presentations
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
ET Connector Low Profile Power Cable to PCB © 2011 Tyco Electronics Corporation. All Rights Reserved. TE Connectivity, TE Connectivity (logo) and TE (logo)
Your universal enclosure. 159 LC  159 Cubic inches of space with a hinged lid  Made from all galvanized steel, powder coated white, with a rubber.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
3U ATCA Shelf October Proprietary and Confidential-
Marshall x10” Combo: Front View Logo Mounting: -Centered and 1-7/8” up from piping (not sure if this is factory placement or not) 14.5” Rubber feet:
Components Connection Jig Graph Paper (#4101) Mounting Blocks (#5902) Nails Tape Measure Pen Hammer Customer Coordinates.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
RBX Cooling Dan Karmgard for the HCAL RBX Group. 1 Mar 01 2RBX Production Readiness Review - D. Karmgard, University of Notre Dame Outline Introduction.
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Motherboard Form Factor. Motherboard The motherboard is the main circuit board inside the PC. It holds the CPU and memory, provides expansion slots for.
ZTF Interconnecting Scheme Stephen Kaye
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
Single Board Controller Comments Roger Smith Caltech
Fiber connections of QIE cards in UX5 Ulrich Heintz 4/23/20151.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
-Proprietary and Confidential-
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
The applicator comprises three sections. At the lower end, a launch section transfers the microwaves from the coaxial microwave source into a PTFE-filled.
SECTIONAL VIEWS.
The HCAL barrel absorber structure
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
Single Board Controller Comments Roger Smith Caltech
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
EC: 7 DISK concept Preliminary considerations
Cosmic Microwave Technology, Inc.
FED Front Panel Hole Size Problem
HE FEE Boards and testing
Update of MVD services and requests
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
HB RM prototypes Ianos Schmidt Aug 17, 2017.
HB RM prototype component status
288 channel HE RBX? A conceptual exercise, NOT a proposal
Pictures and comments from Vitali Smirnov August 2010
Rod adaptors for module tests Module positioning studies
HCAL Modules -First Ideas
SCT/Pixel Draft Rack Layout rcj
OCP Mezz 3.0 Mechanical Recommendations
Analog Room Command Module
NIC v3.0 Mechanical Discussion
NIC v3.0 Mechanical Discussion
Integration and IR Hall
Mechanical Discussion
Mechanical Discussion
Mechanical Discussion
Installation Overview
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Single Detector Design
Presentation transcript:

HE NgCCM integration issues Ianos Schmidt, August 26, 2015

NgCCM card size 160mm Cooling pipes pass over connectors This is not good 160mm cards are too long to fit comfortably under the cooling pipes Propose reducing length to 140mm.

140mm cards 140mm NgCCM Front panel Flush with RBX back wall (1mm gap between board and panel)

NgCCM Width limit CCM must pass between RM and cooling pipes (CU removed) 72mm is the maximum NgCCM width RM NgCCM

Horizontal spacing present situation Calib. Unit NgCCM cards <10mm between NgCCM card and calibration unit RJ-45 connector would interfere by ~1.4mm. VTRX would interfere by a hair, but does not include ~2.5mm needed for LC fiber latches Any other tall components? Above connectors not necessary for card adjacent to calibration module (?). NgCCM card backplane connector clears calibration unit by ~0.5mm ~12mm between NgCCM card and RM. NgCCM can not be wider than 72mm Possible solutions: A.NgCCM card adjacent to calibration module assembled without VTRX and RJ-45 B.Calib unit made a bit narrower C.NgCCM backplane slots shifted away from calibration unit Options shown on following pages

Solution A No VTRX, RJ-45 max

Option B (reduce width of CU) 2.34mm minimum shift to be able to fit RJ-45 Leaves only ~5mm between connectors inside CU and CU edge (maximum effective CU wall thickness) - Not a good solution unless RJ-45 and VTRX are necessary Calibration unit

Option C (shift backplane connectors) Natural shift is ~9mm to allow room for backplane mounting screws between connectors