Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:

Slides:



Advertisements
Similar presentations
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Ensure Vendor/Engineer of Choice Product Quality
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Alternative Project Delivery
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Foreign Affairs Security Training Center
ESC/EN Engineering Process Compliance Procedures August 2002.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
Basics of OHSAS Occupational Health & Safety Management System
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
From Research Prototype to Production
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
U.S. Department of Energy Project Management: Communicating Progress – Celebrating Success Paul Bosco, PE, PMP, CFM, LEED-AP Director, Office of Procurement.
ISA 562 Internet Security Theory & Practice
NIST Special Publication Revision 1
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Environmental Officer Course Introduction Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 12/24/2015.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.
Office of Baseline Change Proposal (BCP) Approval or Brief Presented by: Draft version Jun 16, 2015.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Rob Connatser NSS Instrument Work Packages and XLPM.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Office of Project Management Oversight and Assessments Office of Critical Decision-3 Approve Start of Construction or Brief Presented by:
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Principal Investigator ESTCP Selection Meeting
Camera PDR/CD1 Planning 19 September 2008
NNSA Project Reviews NNSA Office of Project Analysis, Oversight, and Review (NA-APM-1.1) June 7, 2017 Dwight Henderson, Director
CAD/PAD Development Process
Project Management W. J. Foyt
Principal Investigator ESTCP Selection Meeting
Phase 3 Tollgate Review Discussion Template
SCD Grants & Contracts Policy & Procedure 670.
Phase 1 Tollgate Review Discussion Template
Charles Simpson Washington River Protection Solutions May 2018
Principal Investigator ESTCP Selection Meeting
PSS verification and validation
DOE Review of the LCLS Project October 2006
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:

Briefing Outline Purpose Background, Mission Need & Project Scope Proposed Siting, Site Plan Concept & Facility Concept Alternatives Considered & Preferred Alternative Project Organization Preliminary CD-1 Cost, Cost Range, & CD Schedule Preliminary Funding Profile Risk Summary Key Tailoring Strategies Independent Reviews (ICR, if required) Key Performance Parameters CD-1 Prerequisites PMRC Issues (If Applicable) Recommendation Backup 2

3 Purpose Obtain AE approval of Critical Decision-1 for Critical Decision-0, Approve Mission Need, was approved by, on, with a ROM cost range of: Project completion in The Mission Need Statement Describe Program Office mission and how it supports the overall program’s mission. MNS Bumper Sticker

Background 4

Mission Need & Project Scope Mission Need - Project Scope - 5

Proposed Siting 6

Site Plan Concept PROCESS AREA RESIN HANDLING LAW LAG STORAGE REAGENT STORAGE PERSONNEL CHANGE FACILITY VESSEL VENT SUPPLY EEC VAULT SUPPLY CHILLER PROCESS COMPRESSOR PROCESS CHILLER VESSEL VENT EXHAUST PROCESS BLDG/VAULT EXHAUST CRANE SET-UP AREA PARKING 7

Facility Concept 8

Alternatives Considered 9

Selection Criteria Table Other Recommended Criteria: - Meeting Mission need - Meeting Regulatory Requirements - Timelines - Nuclear Safety (as applicable) 10

Preferred Alternative 11

Project Organization 12 Deputy Secretary of Energy (Chief Executive for Project Management) Dr. Elizabeth Sherwood-Randall Deputy Under Secretary for Performance and Management Mr. David Klaus Assistant Secretary for Environmental Management (Acting) (Project Management Executive / Project Owner) Mr. Mark Whitney Manager, Office of River Protection Mr. Kevin Smith One-System Manager, Office of River Protection (Project Mentor) Mr. Ben Harp FPD Level IV Deputy Assistant Secretary for Tank Waste Mr. Ken Picha Federal Project Director Mr. Steve Pfaff FPD Level I Contracting Officer Mr. Wade Hader CO Level 3 Headquarters ORP Site Integrated Project Team Chartered Note: Org chart should show at a minimum - PME, Owner, Respective Chain of Command and FPD

Preliminary CD-1 Cost & Schedule Cost - Cost Range: Schedule - CD-1, Approve Alternative Selection & Cost Range - - CD-3A, Approve Long Lead Procurement - - CD-2, Approve Performance Baseline - - CD-3, Approve Start of Construction - - CD-4, Approve Start of Operations - 13

Preliminary Funding Profile Fiscal Year Total PED (Project Engineering & Design) Construction OPC Total: Comments on funding profile… … Funding in $ million, some rounding 14

Major Risk Summary Description Impact Level Mitigating Actions Technology Readiness Level insufficient for CD-2 approval High Identify integrated test objectives for each critical technology element to ensure testing is scalable for full size operations and produces best possible design. Technology Readiness Level insufficient for scheduled start of hot commissioning High Plan for integrated full-scale test as part of equipment procurement prior to assembly at the LAWPS construction site. Environmental permits delayedHigh Continue close integration with Washington State Departments of Ecology and Health to develop permitting activity schedules. Failed startup testMediumOff-site integrated testing at full scale to ensure operability prior to system installation. Design-affecting requirements change during LAWPS design Medium Incorporate updated DOE O 420.1C, DOE-STD , and other applicable updated standards at beginning of preliminary design phase. Freeze code of record at CD-2. WTP not in alignment with LAWPS Medium Continue active participation in One System organization to ensure DFLAW program elements are understood and agreed upon during development. sRF resin in not available when needed Medium Develop supply agreement with sole source supplier and acquire long-term inventory of resin seed stock and beads. Craft resources availabilityMediumIncorporate resource analysis and hiring processes into field execution schedule. Equipment damage during construction or startup testing or storage Medium Develop critical item list and determine handling requirements to protect equipment and personnel during installation. Preliminary Documented Safety Analysis approval delayed Medium Continue close coordination within DOE and with DNFSB during safety basis development according to latest approved standards during design. Critical Decision (CD-2, 3A, 3) approvals delayed Medium Continue close coordination within DOE to conduct timely project reviews and approval steps. 15

Key Tailoring Strategies Per the Preliminary Project Execution Plan (P-PEP): …. 16

Independent Reviews Independent Alternative Analysis (discuss independent review results of alternatives) … DO APM Independent Cost Estimate Results (if applicable) Final Report Completed: Cost Range Recommended: 17

Preliminary Key Performance Parameters ( PPEP rev. ) 18

Scope of Work 19

CD-0 Approved  Mission Need Statement  Conceptual Design Report Issued  Acquisition Strategy Approved (submit with CD-1 package)  Preliminary Project Execution Plan (submit with CD-1 package)   Tailoring Strategy (Included in PPEP, submit with CD-1 package)  Federal Project Director appointed (submit with CD-1 package)  Integrated Project Team Chartered  Independent Project & Design Review completed  Project Data Sheet completed/updated  Independent Cost Estimate completed (pending)  NEPA Environmental Assessment completed  Integrated Safety Management Plan implemented  Safety Design Strategy (nuclear facilities) developed  Preliminary Hazardous Analysis Report approved  Quality Assurance Plan established  Risk Management Plan completed  Conceptual Safety Design Report prepared  Conceptual Safety Validation report prepared  One-for-One Replacement compliance CD-1 Prerequisites DOE O 413.3B 20

PMRC Issues 21

Recommendation Recommendation: Approve CD-1, Alternative Selection and Cost Range for Selected Alternative: Cost Range: 22

Back-Up Material as Needed 23