Welcome to Columbia!. FAST Act Signed by President Obama on December 4, 2015 First long-term authorization act in a decade Result of bipartisan cooperation.

Slides:



Advertisements
Similar presentations
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Advertisements

Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users P. L SAFETEA-LU.
1 The Development of Federal Surface Transportation Authorization Legislation Jim Kolb Committee on Transportation and Infrastructure U.S. House of Representatives.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
Jack Basso Director of Program Finance and Management American Association of State Highway and Transportation Officials Audit Subcommittee Meeting Phoenix,
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
MAP-21: Bridges and Structures Moderated By Joey Hartmann Team Leader, Office of Bridge Technology Federal Highway Administration HIBT Webinar on MAP-21.
Federal MAP-21 Programs 1 Module 7 Safety Analysis in a Data-limited, Local Agency Environment July 22, Boise, Idaho.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Washington Update Department of Transportation Roger Petzold Federal Highway Administration Oct. 23, 2013.
2012 FTIP/FSTIP Workshop Project Selection Process.
SAFETEA-LU Highlights Roger Petzold Office of Interstate and Border Planning Federal Highway Administration Transportation Border Working Group Nov. 9,
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
FY 2012 President’s Budget Released February 14, 2011.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
A M O T I A A N N U A L M E E T I N G 2 3 S E P T E M B E R N A S H V I L L E, T N 1 A View from the State DOTs Joung H. Lee Associate Director.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Performance Based Federal-Aid Programs Pete Rahn, Chair, AASHTO Standing Committee on Performance Management Director, Missouri DOT February 23,2009 AASHTO.
Washington Update Paul Feenstra ITS America / Keystone Public Affairs.
Surface Transportation Authorization AASHTO Executive Director John Horsley SCOH Subcommittee on Construction Chicago, Illinois August 4, 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
1 Moving Ahead for Progress in the 21 St Century (MAP-21) Public Law Preliminary Briefing Pioneer Valley MPO Joint Transportation Committee September.
Financial Planning Session E-1 The Metropolitan Transportation Planning Process.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Nelson Castellanos Federal Highway Administration March 12, 2013.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Highway Program Structure Highway Recommendations Neil Pedersen Chair, ASC Highway Legislative Team Vice Chair, AASHTO Standing Committee on Highways Administrator,
1 SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Office of Program Management Tribal Transit Outreach.
SAFETEA-LU Reauthorization Process and USDOT’s Reform Proposal November 2008 Todd Kohr Office of the Assistant Secretary for Transportation Policy U.S.
Transportation Funding Workshop Nova Southeastern University December 10, 2012.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Action 2020 Training Local Context August 15, 2012.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Investing in Transportation Infrastructure Government Research Association Annual Policy Conference Janet Oakley, AASHTO July 28, 2009.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
P.L Fixing America’s Surface Transportation (FAST) Act
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
November 8, MAP-21 themes 2 Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the.
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
Association for Commuter Transportation Best Work Places for Commuters
Association of Metropolitan Planning Organizations Fixing America’s Surface Transportation (FAST Act) April 7, 2016.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
FAST, What does the new transportation bill mean to you April 6, 2016.
Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and the Congestion Mitigation and Air Quality Improvement.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Developed from a summary prepared for the New York State Association of MPOs 1.
0 Freight Activities: Year in Review Dec. 12 th 2015.
P.L Fixing America’s Surface Transportation (FAST) Act
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Moving Ahead for Progress in the 21st Century Act (MAP-21)
River to Sea TPO Board Meeting September 28, 2016
River to Sea TPO Board Meeting October 26, 2016
P.L Fixing America’s Surface Transportation (FAST) Act
River to Sea TPO CAC & TCC Meetings September 20, 2016
Moving Ahead for Progress in the 21st Century Act (MAP-21)
MAP-21: Current Federal Transportation Policy
Presentation transcript:

Welcome to Columbia!

FAST Act Signed by President Obama on December 4, 2015 First long-term authorization act in a decade Result of bipartisan cooperation and compromise Provides 5 years of funding certainty for infrastructure planning and investment Authorizes $305 B (all modes) over FY $70 B in transfers to keep the Highway Trust Fund solvent; fully “paid for” (offset) by unrelated savings

$305 B (all modes) over FY Program5-Year Funding (billions) Federal Highway Administration$ Federal Transit Administration61.1 Federal Motor Carrier Safety Administration3.2 Pipeline and Hazardous Materials Administration0.4 National Highway Traffic Safety Administration4.7 Federal Railroad Administration10.3 Total305.0

Key Highway Facts $226.3 B for highways over five years (FY ) $225.2 B in contract authority $1.1 B from the General Fund Builds on the program structure and reforms of MAP-21 Continued focus on accelerating project delivery Adds a new freight formula and expands freight network Adds a new discretionary program for nationally significant freight and highway projects

Highway contract authority grows each year

APPORTIONED PROGRAMS

Growth Varies by Program ProgramAvg. Annual Funding (millions) Change from FY 2015 National Highway Performance Program $ 23, % Surface Transportation Block Grant Program 11, Transportation Alternatives Set-aside[760]+3.3 Recreational Trails Program Set-aside[84]0.0 Surface Transportation Block Grant Program (net of TA & Rec Trails) [10,809]+7.3 Congestion Mitigation & Air Quality Improvement 2, Highway Safety Improvement Program 2, Railway-Highway Crossings Program Metropolitan Planning National Highway Freight Program 1,249 NEW

92% of Highway Funds Are Apportioned CMAQ Transportation Alternatives Rec Trails Grade Crossings Surface Transportation Block Grant (STBG) Program Metro Planning National Highway Performance Program National Highway Freight Program $207.4 B over 5 years

Changes to NHPP and STP PrgmChanges NHPPTIFIA costs and V2I communication equipment now eligible Bridge resurfacing/preservation/reconstruction on non-NHS Federal-aid highways now eligible STPRenamed: Surface Transportation Block Grant Program (STBG) Eligibilities restated with none eliminated; new eligibilities for TIFIA costs, State P3 office, V2I communication equipment In border States, up to 5% for infrastructure projects eligible under the SAFETEA-LU border program More suballocation: +1%/year up to 55% (vs. 50% today) Set-asides for Transportation Alternatives and Recreational Trails (see next slide)

Changes to TAP, CMAQ, and HSIP PrgmChanges “TAP”Same program, but no longer called TAP; no name specified All funds set aside from STBG (vs. from all formula programs today) Nonprofits responsible for local transportation safety programs may be project sponsors CMAQV2I communication equipment eligible Port-related equipment & vehicles eligible under PM2.5 set-aside Exception from PM2.5 set-aside for low population density States (under certain conditions) HSIPOnly listed project types eligible—mostly infrastructure-related Adds eligibility for V2I communication equipment and certain pedestrian safety improvements State need not collect certain data on unpaved roads (but can’t use HSIP funds on those roads until it collects the data)

FREIGHT

National Highway Freight Program | NEW $1.2 B / year (average), apportioned to States by formula Eligible activities include construction, operational improvements, freight planning and performance measures Highway focus, but  10% for rail/port/intermodal projects No State freight plan, no freight formula $ (beginning FY 2018) Federal share is determined under 23 USC 120 Repeals special Federal share for freight projects

Natl. Significant Freight & Hwy. Projects | NEW $900 M/year (average) for competitive grants or TIFIA loans for projects  $100 M (reduced for States w/ small programs) Eligible activities: Highway freight projects on National Highway Freight Network NHS highway/bridge projects, projects in National Scenic Areas Freight rail/intermodal/port projects (  $500 M over 5-year period) Rail-highway grade crossing or grade separation projects States, large MPOs, Tribes, localities, and FLMAs may apply OST selects projects; Congress has 60 days to disapprove Set-asides for rural areas and projects below cost threshold

Other Freight Provisions Freight policy goals and multi-modal national freight strategic plan State freight plans (required) & advisory committees (encouraged) National multimodal freight network National Highway Freight Network, to include: Primary Highway Freight System (PHFS); initially 41K miles Critical rural freight corridors identified by States Critical urban freight corridors with State-MPO consultation Portions of Interstate System not included in the PHFS Highway network re-designated every 5 years (w/up to 3% growth)

PLANNING, PERFORMANCE & PROJECT DELIVERY

Planning & Performance More consultation and participation Adds public ports, intercity transportation providers, including private bus operators and employer-based commuting programs to interested parties that an MPO must provide a reasonable opportunity to comment. Continues to encourage consultation with officials responsible for other types of planning activities, adding to the list of such activities tourism and the reduction of risk of natural disasters. Changes to selection criteria for MPO officials grant a representative of a transit provider authority equal to that of other MPO officials; and, allow a representative of a transit provider to also represent a local community.

Planning & Performance (cont’d) TIPs/STIPs/long-range plans must include facilities that support intercity transportation – (i.e. intercity bus, intercity bus facilities, commuter vanpool providers) New planning factors (10) Improving transportation system resiliency and reliability; Reducing (or mitigating) the stormwater impacts of surface transportation; and Enhancing travel and tourism. Congestion Management Adds examples of reduction strategies Retains the requirement for a congestion management process for TMAs Can also develop a Congestion Management Plan (separate from the congestion management process) that will be considered in the TIP programming.

Planning & Performance (cont’d) Long-range State plan must describe perf. measures and targets Consequence (reporting) for State making insufficient progress toward freight targets

Transportation Performance Measures Performance AreasNPRMAnticipated Final Rule Safety Performance Measures March 11, 2014February 2016 Highway Safety Improvement Program March 28, 2014February 2016 Statewide and Metro Planning June 2, 2014July 2016 Pavement and Bridge performance measures January 5, 2015August 2016 Highway Asset Management Plan February 20, 2015August 2016 System Performance Measures March 2016 (Projected)

Accelerating Project Delivery A major theme of the FAST Act, with 18 separate provisions in the highway title alone. The Act— Adds New Flexibilities Section 4(f) exemption for some bridges Authorizes taking of nesting swallows in at-risk bridges Refines Existing Provisions Narrows concurrence requirement for PEL Pilot for substitution of State law for NEPA

OTHER PROGRAMS & PROVISIONS

TIFIA Changes to TIFIA (beyond 71% funding cut) New eligibilities for transit-oriented development (TOD), capitalizing rural projects fund in a SIB Lower min. cost ($10 M) for local govt. applicants and for TOD TIFIA now eligible under NHPP, STBGP, Nationally Significant Freight and Highway Projects No more requirement to redistribute uncommitted TIFIA funds Reserves at least $2 M to be used in lieu of fee payment by applicants for loans for projects costing less than $75 M

Tolling/HOV Tolling – Technical clean up of statutory language Requires same treatment on certain toll facilities for over-the-road buses and transit buses Must consult MPO on toll placement/amount for HOT lanes on Interstate facilities within metropolitan planning area ISRRPP – Expiration timeframe for provisional approvals: Those in place before FAST Act expire 1 year after enactment of FAST Act (with possible 1-year extension) New ones (post-FAST) expire after 3 years (w/possible 1 yr. extension) Allows waiver of sanctions for degraded HOV operation under certain conditions

Highway Design On NHS, design "shall consider" (previously “may take into account")— constructed/natural environment environ., scenic, aesthetic, historic, community, & preservation impacts access for other modes cost savings via flexibility in current design guidance/regulations | NEW DOT to consider AASHTO Highway Safety Manual, NACTO Urban Street Design Guide Encouragement for States/MPOs to adopt standards for Fed. projects that accommodate motorized and non-motorized users Locality may use different roadway publication than State (with State approval) in certain circumstances

SAFETY IS EVERYONE’S BUSINESS Buckle up Slow Down Avoid distractions