Herring River Restoration Project “Return of the Tide” Concept for marsh level crossing at High Toss Road February 11, 2016 Council on Aging Wellfleet,

Slides:



Advertisements
Similar presentations
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Social and Community Based Initiatives and the NE MN Landscape Plan.
National Fish and Wildlife Foundation Generating New Value for Conservation.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
Keeping Maine’s Forests Pilot Project Update Fisheries Habitat Restoration Pleasant River Watershed.
Program Outline Restoration Project Update Welcome and Introduction (Don Palladino) Town of Wellfleet Role (Dale Donovan) Overview of Herring River Restoration.
Long Range Plan Presented June 25, 2013 Adopted by the Board of Education: July 16, 2013.
Manastash Creek Corridor Habitat Enhancement and Flood Hazard Reduction Plan Kick-Off Meeting June 5, PM Hal Holmes Center.
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Community-based Education K-12 students serving as a resource for meeting community needs.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Marin County Watershed Stewardship Plan
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Friends of Herring River Wellfleet & Truro, Massachusetts Annual Meeting August 21, 2012.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Indiana Lake Michigan Coastal Grants Program Coastal Advisory Board April 18 th, 2007 Jenny Orsburn Program Specialist.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Connect with your Joint Venture Coordinator Helps you understand priorities Connects you with partners Advises on grant application Can serve as a project.
Heather Stafford Estero Bay Aquatic Preserve Fisherman’s Wharf Fort Myers Beach, Fl Charlotte Harbor Aquatic Preserves Burnt.
Herring River Restoration Project “Return of the Tide” Friends of Herring River August 18,
Timeline History NOV 2007 Community process began MAY 2009Draft Recreation and Open Space Element released JUL 2010 Funding for the environmental review.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Herring River Restoration Project “Return of the Tide” Low-Lying Roads 0% Design Public Meeting February 4,
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Coastal and Estuarine Habitat Restoration Program and Trust Fund RIGL § Caitlin Chaffee Rhode Island Coastal Resources Management Council.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Federal and State Coastal Zone Management Laws Introduction to Coastal Management.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
Taunton River Wild & Scenic Study A Partnership Effort on Behalf of The Taunton River.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Herring River Restoration Project “Return of the Tide” Friends of Herring River August 19,
Harwich High School Environmental Studies. an interdisciplinary course that addresses real world an interdisciplinary course that addresses real world.
Partnerships & Collaboration 101. Partnerships and Collaboration 101 Partnerships & Collaboration 101.
Herring River Restoration Project Salt Marsh Declared shared commitment to investigate restoration of tide to the Herring River Established the.
A summary of the work and programs of the Gulf of Maine Council on the Marine Environment.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Yarmouth’s Wastewater System Initiative Phase 1 Article 12 ATM 2008 $3.1 Million Design and permitting for Collection, Treatment and Disposal.
Scituate Adaptive Building Reuse. SABR Initiative The Board of Selectmen has established an ad-hoc committee to assist the Board in evaluating and recommending.
Introduction to the Regional Conservation Partnership Program (RCPP) June 10, 2016 Carol Rivera– Program Manager An Equal Opportunity Provider and Employer.
A summary of the values of the Gulf of Maine and contributions of the work and programs of the Gulf of Maine Council on the Marine Environment.
Louisiana’s Coastal Protection and Restoration Update
Partnership Wild and Scenic Rivers
Watershed-based Plan To Restore the Hackensack Meadowlands:
Local Government Engagement and Communication Strategy
Skillman Corridor TIF District
Dialogues from the Odessa Ground Water Replacement Program
Article 41 Wastewater Planning Capacity Study
Winter Water: A hot topic for cold fish.
Watershed-based Plan To Restore the Hackensack Meadowlands:
2017 SFEG Restoration Update
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Herring River Restoration Project “Return of the Tide” Concept for marsh level crossing at High Toss Road February 11, 2016 Council on Aging Wellfleet, MA

Tonight’s Agenda Welcome – Friends of Herring River Herring River Restoration Project Objectives of overall project and modifications at High Toss History of the restoration initiative and Herring River and marsh crossings at High Toss Importance of unrestricted tidal flow at High Toss marsh crossing Board of Selectmen review of High Toss crossing concepts ESS Group – Conceptual Design for Bridge & Marsh Level Crossing

Friends of Herring River Mission Conduct public education, awareness and outreach activities Administer grants and contracts Raise funds Promote the restoration and environmental vitality of the Herring River Estuary

The Restoration Project Objective: Restore the acre Herring River Estuary to a healthy and projective tidal salt marsh How: Remove existing restrictions in the river and its tributaries Manage controlled incremental return of natural tidal flow to and from the estuary. Why? Prevent ongoing degradation of the estuary Achieve ecological and social benefits

How is the work being done? Representing the project partners, the Herring River Restoration Committee directs planning and provides technical direction Partnerships provide support, funding, expertise, etc. Public participation in the planning process Friends of Herring River seeks funding, awards and administers contracts with private organizations and continues public outreach

Supporting Organizations Association to Preserve Cape Cod Cape Cod Conservation District Cape Cod National Seashore ** Coastal America Foundation Conservation Law Foundation Ducks Unlimited Friends of Cape Cod National Seashore Friends of Herring River Herring River Technical & Stakeholder Committees MA Bays Program MA Division of Ecological Restoration * MA Environmental Trust National Park Service Natural Resource Conservation Service * The Nature Conservancy National Oceanic & Atmospheric Administration * Town of Truro ** US Geological Survey US Fish & Wildlife Service * Town of Wellfleet ** Wellfleet Conservation Trust * Herring River Restoration Committee ** Executive Council

Project Timeline 2016 – Final EIS, Record of Decision & MOU III 2016 – Complete permit ready designs 2016 / 2017 – Apply for and obtain permits 2016 / 2018 – Secure project funding 2017 / 2018 – Complete final design 2018 / 2019 – Begin construction

Major Project Elements Chequessett Neck Road Bridge & Tide Control Gates Mill Creek Dike & Pole Dike Control Gates High Toss Road Low-Lying Roads Private Property Other Tasks

History of Crossing Herring River at High Toss Road location Herring River was first bridged at High Toss to provide overland passage at low tide from Griffin Island settlement to Holbrook Neck This was the only dry (at low tide) crossing available from 1773 until the completion of the Chequesset Neck dike in 1909 Marsh level trail at High Toss remained “dry” throughout tidal range only after dike impeded full tidal exchange

Project Area Overview CNR Dike to be replaced Pole Dike Tide Control Structure High Toss Road Roadwork Mill Creek Dike

Existing Conditions Modeled Extent of Salinity Restored Conditions High Toss Road

Existing Conditions

High Toss Design Process February 12, 2015 – Public meeting to receive input on the important criteria for designing a crossing of the marsh at High Toss June 2, 2015 – Public meeting to present alternative concepts and receive public feedback June 9, Present alternative concepts at a meeting of the Wellfleet Board of Selectmen. o Selectmen vote to eliminate options B, C and D and directed Friends of Herring River to develop a marsh level crossing (Referred to as Option A+)

High Toss Design Process continued February 11, 2016 – ESS presents current Option A+ design for public feedback February 23, 2016 – Presentation of Option A+ and tonight’s public meeting comments to BOS Spring 2016 – Proceed with permit level design in accordance with BOS direction Resolution of outstanding technical and regulatory issues e.g. regarding accessibility requirements

Introduction of the ESS Group The ESS Group is the contractor for the design of the High Toss bridge & marsh crossing ESS has developed the concept being reviewed this evening in response to BOS request at June 9, 2015 meeting Craig Wood, ESS’s project manager will lead review of current design plans

Concept Design

Concept Design Boardwalk Plan View

Concept Design Boardwalk Elevation View

Concept Design Source: American Access Board Accessible Fishing Piers & Platforms Design Manual

Marsh Plane Subsidence