CERN’s n_TOF neutron spallation target operating experience and future consolidation plans M. Calviani (CERN) 6 th High Power Targetry Workshop Oxford,

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

1 MEGAPIE Structural Materials : Is there a risk of failure? MEGAPIE Workshop Aix-en Provence, Nov MEGAPIE Structural Materials Is there a risk of.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
SYNERGY of Irradiation and PIE Facilities at BNL N. Simos RaDiATE Meeting December 12, 2014 BLAIRR Tandem van de GRAAFF NSLS II XPD Beamline (PIE)
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
A 4-PAD MicroMegas system for monitoring purpose at n_TOF facility (CERN) M. Sabaté-Gilarte 1,2 T. Papaevangelou 3, F. Gunsing 3, E. Berthoumieux 3, M.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
ISIS Second Target Station
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
Study of a new high power spallation target concept
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
Measurement of the 240 Pu(n,f) cross-section at the CERN n_TOF facility: first results from Experimental Area II (EAR-2) A. Tsinganis 1,2, N. Colonna 3,
KIT – University of the State of Baden-Württemberg and National Large-scale Research Center of the Helmholtz Association Institute for Nuclear and Energy.
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
Simulations of Accelerator Driven Systems (ADS) Aleksander Polanski Joint Institute for Nuclear Research, Dubna, Russia. The Andrzej Soltan Institute for.
Possible irradiation needs from CERN and requirements (a partial and selected view) M. Calviani (EN/STI)
1 Thermo-Mechanical Analysis of ISIS TS2 Spallation Target Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory 5th High Power Targetry.
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
Status on 25 Mg(n,  ) and neutron flux in 2012 Bologna, 27 November 2013 C. Massimi.
I. Introductory remarks and present status II. Laboratory experiments and astrophysics III. Future options scenarios status and challenges new developments.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Towards a modified n_TOF Facility and Increased Radiation Safety Towards a modified n_TOF Facility and Increased Radiation Safety ATC/ABOC Days, 21 st.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Beam test possibilities at JINR and Fermilab V. Pronskikh Fermilab 02/15/2012.
Measurement of 7 Be(n,  ) and 7 Be(n,p) cross sections for the Cosmological Li problem in Addendum to CERN-INTC /INTC-P-417 Spokepersons:
Nuclear Facilities Decommissioning & Design An introduction to SENAC activities JM. Dumas CEA Saclay, DSM/DAPNIA/SENAC, F Gif-sur-Yvette,
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
Neutron cross-sections measurement at the facility at CERN Students’coffee – 26th meeting, Tuesday 28 October 2014, D02-BE Auditorium Prevessin Massimo.
FLUKA Meeting Milan Jul 2010 Work in the frame of the LHC Phase II Upgrade Previous work was dedicated to the study of the.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
Santa Tecla, 2-9 October 2005Marita Mosconi,FZK1 Re/Os cosmochronometer: measurements of relevant Os cross sections Marita Mosconi 1, Alberto Mengoni 2,
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
The integration of 420 m detectors into the LHC
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
HRMT14 – Post Irradiation F. Carra on behalf of the HRMT14 team 189 th Collimation Working Group – 20 April, 2015.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
SHiP target and target complex Plans and perspectives M. Calviani, A. Perillo-Marcone (EN/STI) 7 th SHiP Collaboration Meeting 10 th February 2016.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
SPS High Energy LSS5 Thermal contact & cooling aspects
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
New nTOF target: Design Issues
ISIS TS1 Project: Target Design and Analysis
Heating and radiological
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
n_TOF Target HiRadMat Experiment Proposal (1704)
Measurement of the fission cross-section of 240Pu and 242Pu at CERN’s n_TOF facility CERN-INTC , INTC-P-280 Spokespersons: M. Calviani (CERN),
the s process: messages from stellar He burning
A “standard” ISOLDE target: ThO2-184, n-rich Cu
The neutron capture cross section of the s-process branch point 63Ni
Target and Horn status report
Summary of session 5: Innovative Ideas and New R&D
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Measurements of the 238U radiative capture cross section using C6D6
Phase II Collimators : design status
Lithium lens and window tests
n_TOF Target #3 Production Readiness Review Introduction and Organization M. Calviani (EN-STI) n_TOF Target #3 Project.
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
n_TOF Target #3 Baseline Design
Presentation transcript:

CERN’s n_TOF neutron spallation target operating experience and future consolidation plans M. Calviani (CERN) 6 th High Power Targetry Workshop Oxford, April

Outline  n_TOF facility and experiment  History of target #1 and target #2  Operational feedback of target #3  Design of target #3 and ongoing R&D 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop2

n_TOF facility  Neutron time-of-flight facility for high accuracy cross-section measurements  Nuclear astrophysics & Nuclear technology EAR1 ~185 m EAR2 ~20 m  Spallation neutrons generated by 20 GeV/c protons on a lead target 20 GeV/c protons 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop3

14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop4 Courtesy: F. Gunsing (CEA)

n_TOF measurements 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop5 Courtesy: F. Gunsing (CEA)

n_TOF neutron flux  Extremely high instantaneous neutron flux  10 6 n/cm 2 /10 ms (EAR2)  Unique for measurement of radioactive isotopes  High resolution in energy (~10 -4 )  resonance studies  Large energy range (~mev to 1 GeV)  Low repetition rate (<0.8 Hz)  no wrap-around 11 orders of magnitude! 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop6 Measurements Courtesy: M. Barbagallo (INFN)

n_TOF facility and requirements  Due to the specific use of the facility, focus is not on average power on target, but to instantaneous flux  8.5*10 12 p+/pulse in 7 ns (27 kJ)  1.5x1.5 cm 2 1   Rep. rate ~4.8 sec  ~5.5 kW average  Instantaneous power  ~4 GW  Important dynamical effects during pulse in target  Target material: since facility conception, focus was on Pb:  Highest neutron yield (!)  Low neutron capture cross-section  improved background conditions 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop7

n_TOF spallation target #1 ( ) 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop8  Facility was conceived in 2000 and operated with a Pb target immersed in a pool with cooling water  Design limitations:  Insufficient cooling and the hot spot (proton/lead impact)  Surface oxidation due to rupture of protective layer when flushing  Mechanical instability  Lack of water chemical stabilisation – pitting corrosion enhancement  Facility stopped in 2004 due to water contamination

n_TOF spallation target #2 (2008-now) 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop9  Cope with limitations of target #2  Target embedded in a pressurized vessel  Monolithic lead core, support and anticreep in AW5083  Water chemistry continuously monitored

Target #2 operational feedback  Target #2 is not optimized for EAR2 (whilst compatible!)  Beam power on target is presently limited by the need to maintain surface temperature low enough to avoid water boiling 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop10 EAR1 EAR2

n_TOF target material results  Dedicated analyses quantified average of 6  m/y (~80  m/y for 10 B circuit) for AW5083-H111  Erosion/corrosion of 99.99% Pb significant  ~900  m/y average (local max 3.2 mm/y)  Severe environment  Pb corrosion products unavoidable, lead dissolved in water or residues  O 2 production by radiolysis  Smooth run since April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop11

Target #2 operational feedback 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop12  Erosion/corrosion generates a significant contamination of the circuit  Long-lived isotopes “coating” the pipes of the cooling water circuits EDMS

Target #2 operational feedback  6 years operation:  Average conductivity <0.15  S/cm  Oxygen content below 80 ppb  Full continuous purification via redundant ion exchangers  Purified N 2 flush via a Liqui-Cel ® membrane 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop LS1

Target #2 operational feedback  In order to reduce photon background in EAR1, the target moderator is filled with 10 B enriched boric acid in saturation (1.28%)  Dedicated circuit to guarantee constant concentration  Conductivity ~60  S/cm 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop14 Courtesy: C. Domingo (IFCV

n_TOF target inspection April 2014  External inspection performed in April 2014  Only surface oxidation stains have been observed, due to humid atmosphere 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop15

Introduction of target #3 design 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop16  Main goal is to reduce circuit contamination by embedding the production core in a corrosion resistant envelope  Dedicated moderator for EAR2  Target structure in low Co SS316L (waste)  Water cooling maintained to guarantee excellent time-to- energy relation 1.Ta-cladded pure W core + PbSb4 multiplicator 2.Ti6Al4V-contained PbSb4 core 3.Back-up: optimised bare PbSb4 core

14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop17 Option 1  Ta-cladded W via HIPing – excellent heat transmission  Al anticreep structure for PbSb4 mass Option 2  Ti6A/Pb contact critical for heat evacuation  Container shall always behave elastically w/o plasticization  Eliminates creep problem

Physics optimisation 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop18  All solutions improve fluxes in EAR2 (up to a factor of 3x)  Small reduction in fluxes for EAR1 (as bare Pb is the absolute best)

Ongoing prototyping works – Ta-cladded W 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop19  Ongoing orders with external companies to validate quality of the surface bonding  Non destructive + destructive tests  Synchrotron x-ray tomography (ESRF)  Possible development in-house at CERN at a later stage

Ongoing prototyping works – Ti6Al-Pb 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop20  Few Ti6A-contained Pb prototypes (1:4 and simplified geometry) are being developed to find the most adapted production method for the best thermal contact  Pb casting into Ti6A cylinder (+metal pressing)  Pb cryogenic shrink fitting into Ti6A cylinder PbSb4 prototype cylinder metrology Al prototype for fitting tests Ø150 mm 100 mm

Foreseen beam tests HiRadMat 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop21  To evaluate the effect of stresses/fatigue on the materials interface (Ta-W, Ti6A-Pb), it is foreseen to perform a beam test at HiRadMat facility during 2017  ~3000 pulses per target, ~1.5*10 11 p/pulse, 10 mm sigma Ta-cladded W Ti6A-contained PbSb4 ~40 cm ~10 cm Tank 440 GeV/c beam See C. Torregrosa’s talk on HRMT-27 (AD-target materials)

Conclusions and perspectives 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop22  Significant experience developed for the operation of bare Pb targets at CERN since 2000 (target #1 and #2)  New generation target (#3) will have a corrosion resistant cladding  Detailed design of target #3 will progress until end of 2017, production in 2018  R&D activities being carry out to validate technical choices

Thanks a lot

Ex. Exchange of ion exchangers  During this winter shutdown we exchanged both cooling circuit ion exchangers  High dose rate ~10 mSv/h  High contamination levels of the circuit (200 kBq/l)  Collective dose ~0.6 mSv  Mixed bed exchangers:  Nuclear grade (Purolite ® NRW3240)  Industrial grade (Amberlite 200C Na and IRA900 Cl) 14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop24

14 April 2016M. Calviani - n_TOF - 6th High Power Targetry Workshop25