Workshop on Risk informed decision making on nuclear power plant safety 27 - 28 January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.

Slides:



Advertisements
Similar presentations
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Advertisements

Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Role of the TSO in Public Information/ Debate Openness, Transparency.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
Presented by Dr. Kristóf Horváth Deputy Director General Hungarian Atomic Energy Authority Based on the Guideline developed by the WG on Computer Protection.
1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
1 PRA Research to Enhance Decision-Making John Monninger, Deputy Director Division of Risk Analysis Office of Nuclear Regulatory Research, NRC.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Diablo Canyon NPP Risk-Informed In-service Inspection
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Practical Examples of RIDM Application in the NPP Operation Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department.
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Prescriptive vs Performance-Based Regulatory Approaches
János Krutzler Hungarian Atomic Energy Authority
THAILAND Training and Tutoring Feedback
Radioactive waste repositories
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Flooding Walkdown Guidance
Role of the TSO in Public Information/ Debate Openness, Transparency Technical support to regulatory body for the new NPP (OL3) project Keijo Valtonen.
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Complementarity of deterministic and probabilistic approaches
Diversity analysis for advanced reactor design
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Armenia Training and Tutoring Feedback
RCF Plenary Session 21 September 2018
Regulatory Oversight of HOF in Finland
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes P. Flury.
Regulatory system in Hungary
Presentation transcript:

Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application in the regulatory activity by Géza Macsuga Nuclear Safety Directorate Hungarian Atomic Energy Authority

Outline A good list of IRIDM applications for regulatory use IRIDM application examples –Hungary –others Summary January 2011Practical examples of RIDM application in the regulatory activity

A good list of IRIDM applications for regulatory use (by VVER Forum PSA WG) January 20113Practical examples of RIDM application in the regulatory activity Scope of existing PSA models Level 1, full power Level 1, shutdown and low power Level 2, full power Level 2, shutdown and low power PSA reviewIndependent internal review of existing models and tools by the licensee International review of existing models and tools Independent regulatory review of existing models and tools Regulatory use of PSATech Specs exemptions PSA based event analysis Risk monitor Licensing of plant modifications Risk informed regulatory inspection activities Emergency preparedness planning and emergency response Training of RB staff, etc.

Use of PSA by the HAEA (1) Development of models and tools Application of tools Operational cases Preparation of special studies January 20114Practical examples of RIDM application in the regulatory activity

Use of PSA by the HAEA (2) Available PSA environment –Risk Spectrum framework software PSA 2.10 –3 users Risk Watcher 1.20 –2 users –the same what the Paks NPP uses –for the legal use of PSA models and tools No PSA development activities at the HAEA –only use and follow up January 20115Practical examples of RIDM application in the regulatory activity

Use of PSA by the HAEA (3) Available models at the RB –FPSA-1 full-power operation mode unit specific models –for all 4 units including internal fire and flood hazards concept of living PSA –updated every year after refuelling outage January 20116Practical examples of RIDM application in the regulatory activity Unit-1 FPSA internal IEs

Use of PSA by the HAEA (4) Available models at the RB –SPSA-1 for internal initiators  comprehensive update in 2010 the unit-2 model is representative for all units including internal fire and flood hazards January 20117Practical examples of RIDM application in the regulatory activity Year CDP 19971,4· /y 19993,5· /y 20022,8· /y 20105,1· /y

Use of PSA by the HAEA (5) Available models at the RB January 20118Practical examples of RIDM application in the regulatory activity Level 1 PSA models for Paks NPP internal initiating eventsexternal initiating events operational IEsfloodfireseismicothers nominal powerunits 1 – 4unit 3X low power & shut down statesunits 1 – 4unit 3X CDP T for Unit-1 Fire at nominal power 22 % Flood at nominal power 25 % Shut down, internal IEs 27 % Internal IEs at nominal power 26 %

Use of PSA by the HAEA (6) Available models at the RB –PSA-2 by the end 2003 unit 1 covers SPSA-1 for internal initiators no internal fire and flood hazards –revision was started in 2010 in connection with the lifetime extension January 20119Practical examples of RIDM application in the regulatory activity Level 2 PSA model for Paks NPP internal initiating eventsexternal initiating events operational eventsfloodingfireseismicothers nominal powerunit 1, includes sources others then reactor coreX low power & shut down statesXXXX

Use of PSA by the HAEA (7) Available PSA tools –Risk Supervisor a kind of risk monitor for evaluation of safety performance by the RB –Precursor Analyser for evaluation of risk significance of operational events –Core Damage Prediction System for quick estimation of potential consequences in emergency Application of tools –since 1999 all reported events are analysed systematically by the TSO for the RB Risk Supervisor Precursor Event Analyser –results used during the comprehensive evaluation of the Paks NPP safety performance January Practical examples of RIDM application in the regulatory activity

Risk superviser A simplified Risk monitor –for the nominal power failures repairs/maintenance changes in configuration –manual input of changes off-line mode Objective –present the actual value of CDF –follow up of risk profile January 2011Practical examples of RIDM application in the regulatory activity

Risk Supervisor results for 2002 Annual outage: 29 June - 3 Aug 2002 Annual outage: 18 Aug - 20 Sep 2002 Annual outage: 15 Mar – 29 Apr 2002 Annual outage: 27 Apr - 23 June January Practical examples of RIDM application in the regulatory activity

Precursor Event Analyser Determination of safety significance of operational events –extending for shut down states Initiating event type events –safety system actuation –conditional core damage probability  CCDP failure type events –affecting safety system operations –increment of core damage probability  ΔCDP US NRC  Precursor Event Assessment Program –CCDP –ΔCDP direct regulatory attention  type of event investigation (A, B, C) January 2011Practical examples of RIDM application in the regulatory activity

The Core Damage Index for Paks NPP January 2011Practical examples of RIDM application in the regulatory activity

Precursor results for January Practical examples of RIDM application in the regulatory activity

Use of PSA by the HAEA (8) Safety comparison of different POSs of Unit 2 Paks NPP –objective: to select the POS with less risk F  cold shut down, but closed reactor –T < 70 °C; atmospheric < p < 20 bar; hermetic zone is open; forced cooling G  cold shut down, but open reactor –T < 70 °C; p = atmospheric; hermetic zone is open; natural cooling –POSs in TechSpecs  A, B, C, D, E, F and G (M and K POSs) –SPSA  1 ÷ 24 POSs –results F  CDF = 1,39·10-6 y -1 andPCBF = 9,67·10-7 y -1 G  CDF = 9,67·10-7 y -1 andPCBF = 5,64·10-6 y -1 –decision POS F + actions to reduce risk of cold overpressure January 2011Practical examples of RIDM application in the regulatory activity

Use of PSA by the HAEA (9) Flexibility in timing of test cycles –Paks NPP TechSpecs  every 6 weeks operating manual  6 weeks ±10 days for implementation –Paks NPP model FPSA-1 generic PSA model  static ideal: Risk Monitor  for handling of time dependences –results the average annual CDF may increase even by 9 % –decision more proper regulation of test intervals –fixing the centre time of test –reducing the duration of time for implementing tests 17

The test cycles test cycle 6 week T ’ t1 T ’ t2 T ’ t3 T0T0 T t1 ±10 dT t2 +10 d ±10 dT t3 +20 d ±10 d refuellingtest cycle 6 week start of operational cycle T t1 T t2 T t3 T0T0 T t1 ±10 dT t2 ±10 dT t3 ±10 d

Use of PSA by the HAEA (9) Preparation of special studies –Reliability study for specific functions of CERTA (1998) –Risk-informed classification of NPP SSCs (1999, 2003, 2009) –Risk aspects for evaluation of in-service and outage maintenance (1999, 2001) –Regulatory criteria for severe accidents (2000) –Probabilistic safety goals (2000) –Potential areas of PSA applications during the regulatory activities (2000, 2007) –Role of PSA in lifetime extension (2006) –Role of PSA in licensing of new units (2010) January Practical examples of RIDM application in the regulatory activity

The role of TSO NUBIKI  the former VEIKI Electric Power Research Institute –special role  serves for both the utility and RB January Practical examples of RIDM application in the regulatory activity Regulatory Body Paks NPP

Database of risk informed decisions (1) The international COOPRA initiatives ( ) –WG on RIDM with several tasks –one of the tasks was to establish a database for risk informed decisions of MSs 1. French data base 1.1Total loss of redundant system 1.2Loss of residual heat removal system at mid-loop operation 1.3Heterogeneous boron dilution 1.4Periodic safety review of 900 MW e series 2. Hungarian database 2.1Safety comparison of different plant operation states for Paks NPP Unit 2 2.2Deviation from the surveillance test schedule 3. Japanese database 3.1Accident management January 2011Practical examples of RIDM application in the regulatory activity

Database of risk informed decisions (2) 4. Korean data base 4.1Primary depressurization capability 4.2Aggressive cool down 4.3Reinforcement of building structure 5. US data base 5.1Indian Point 2 steam generator tube rupture 5.2Grand Gulf Unit 1 – issuance of TS amendment to permit extension of allowed outage time for DGs January 2011Practical examples of RIDM application in the regulatory activity

Summary Extensive PSA modelling program Living PSA program Use of PSA –defining plant vulnerabilities –general design safety evaluation –extensive R&D support –systematic efforts to risk-inform RB activities –no systematic consideration in decision making (yet!) Generation of domestic and international experiences January Practical examples of RIDM application in the regulatory activity

Questions Thank you for your attention! January Practical examples of RIDM application in the regulatory activity