Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Ancillary Services Replacement Presenter: Ino González Wholesale Market Subcommittee July 8, 2015 ERCOT Public.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Ancillary Services Replacement
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Presentation transcript:

Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016

PUBLIC Settlement Treatment for Replacement of Infeasible Ancillary Services General Settlement Principles for discussion with QMWG: 1.The QSE with the infeasible AS will be charged the DAM clearing price regardless whether the responsibility was awarded, self-arranged, or traded, and regardless of whether a SASM is executed. 2.The replacement cost, if any, is charged to all QSEs based on LRS. 3.The QSE with the AS infeasible is not directly charged the full replacement cost, if any. 4.All revenues collected from charges to QSEs due to infeasible AS are paid to all QSEs based on LRS.

PUBLIC Settlement Treatment for Replacement of Infeasible Ancillary Services 3 Definition of Ancillary Service being Undeliverable The terms undeliverable and infeasible are used interchangeably in the Protocols ERCOT believes the term undeliverable is misleading and will provide additional clarity in the NPRR.

PUBLIC Questions Raised at March 2016 QMWG Meeting 4 ERCOT was asked to provide samples of Resource AS Responsibility being infeasible 3 distinct scenarios have been discussed 1.Reserved Resource capacity needed to solve transmission congestion a.Resource deployment needs to be between HSL and HASL or LASL and LSL to solve the congestion b.May be detected in HRUC or in real-time c.Common reason for AS being deemed infeasible 2.Reserved Resource capacity needed to match expected supply and demand a.Resource deployment needs to be between HSL and HASL or LASL and LSL to solve the congestion b.Detected in HRUC c.Expectation that AS would not be deemed infeasible and that AS would be deployed in real-time as needed 3.Physical deployment of AS would negatively effect transmission congestion a.For example, Reg. Up deployments on a Resource with a hurting shift factor on a constraint results in overloads that cannot be managed by SCED b.This is not captured in HRUC and would be rare for deeming as infeasible c.Likely needs Protocol clarification

PUBLIC Questions Raised at March 2016 QMWG Meeting 5 ERCOT was asked to provide samples of Resource AS Responsibility being infeasible Non-Spin is unique from other AS regarding infeasibility Unlike other AS, Non-Spin can be deployed for solving local transmission congestion Current operational practice is to not deem Non-Spin capacity infeasible when it is needed for transmission congestion and to deploy the Non- Spin on that specific Resource, as necessary Not intending to change this practice

PUBLIC Questions Raised at March 2016 QMWG Meeting 6 ERCOT was asked to provide a sample of an AS Responsibility declared infeasible due to transmission constraints for Regulation Down Example: Resource with a 50% hurting shift factor on the constraint SCED constraint flow is 4 MW greater than the limit Resource must be dispatched down 8 additional MW to resolve the constraint (from 110 to 102) No Constraint Resolution Limited by LASL Reg. Down Relocated and Constraint Fully Resolved by SCED

PUBLIC Questions Raised at March 2016 QMWG Meeting 7 RTASOLIMB q = ERCOT was asked to explain the impact of AS infeasibility on AS Imbalance Online Capacity in Real-Time: RTASOLIMBReal Time Ancillary Service On-Line Reserve Imbalance RTOLCAPReal-Time On-Line Reserve Capacity RTASOLIMB RTOLCAP q – Online Capacity already reserved Reserved

PUBLIC Questions Raised at March 2016 QMWG Meeting 8 RTASOLIMB q = ERCOT was asked to explain the impact of AS infeasibility on AS Imbalance Online Capacity in Real-Time: RTASOLIMBReal Time Ancillary Service On-Line Reserve Imbalance RTOLCAPReal-Time On-Line Reserve Capacity RTASOLIMB RTOLCAP q – Online Capacity already reserved (Reserved – AS Undeliverable)

PUBLIC Ancillary Service On-Line Reserve Imbalance 9 RTASRESPReal-Time Ancillary Service Supply Responsibility RTASOFFReal-Time Ancillary Service Schedule for the Off-Line Generation Resource RTRUCNBBRESPReal-Time RUC Ancillary Service Supply Responsibility in Non-Buy-Back hours RTCLRNSRESPReal-Time Controllable Load Resource Non-Spin Responsibility RTRMRRESPReal-Time Ancillary Service Supply Responsibility for RMR Units RTASOLIMB q =RTOLCAP q – [(RTASRESP q * ¼) – RTASOFF q – RTRUCNBBRESP q – RTCLRNSRESP q – RTRMRRESP q ] The Real-Time Ancillary Service Supply Responsibility will be reduced by the MW of infeasible AS, which will increase the Real Time Ancillary Service On-Line Reserve Imbalance volume used in the calculation of the Real-Time Ancillary Service Imbalance Amount payment. RTASIAMT q =(-1)* [(RTASOLIMB q * RTRSVPOR) + (RTASOFFIMB q * TRSVPOFF)]

PUBLIC Questions Raised at March 2016 QMWG Meeting 10 ERCOT was asked to explain impact of an AS Responsibility declared infeasible due to transmission constraints on DAM Make Whole Payments Day-Ahead Make-Whole Payment DAM Guaranteed Amount ( )( ) < DAM Revenues A QSE will receive a Make-Whole Payment if its revenues from the DAM are less than the Startup, Minimum Energy, and Operating costs

PUBLIC Day-Ahead Make-Whole Payment 11 What if revenues are less than costs? Difference = Make-Whole Payment Day-Ahead Market Sales $ Make-Whole Payment Costs Incurred Revenues Received Incremental Energy Costs Minimum Energy Costs Start-up Costs

PUBLIC Day-Ahead Make-Whole Payment 12 What if revenues are greater than costs? Day-Ahead Market Sales $ Costs Incurred Revenues Received Incremental Energy Costs Minimum Energy Costs Start-up Costs No Make-Whole Payment Day-Ahead Market Sales = DAM Energy Sales * SPP + AS Sales * MCPC

PUBLIC Day-Ahead Make-Whole Payment Energy Sales * SPP + AS Sales * MCPC Day-Ahead Market Sales $ No Make-Whole Payment Without AS Sales With AS Sales Day-Ahead Market Sales Make-Whole Payment Energy Sales * SPP

PUBLIC Day-Ahead Make-Whole Payment Should DAM AS Revenues be removed from Make Whole Payments if these are clawed back due to an AS Infeasible event? a)Creates a dependency whenever ERCOT settles DAM (Requires Resettlement) b)Historically few instances of AS Infeasibility. May not justify changing DAM Make whole settlement equations c)Creates System impact to modify settlement equations

PUBLIC Settlement Treatment for Replacement of Infeasible Ancillary Services General Settlement Principles for discussion with QMWG: 1.The QSE with the infeasible AS will be charged the DAM clearing price regardless whether the responsibility was awarded, self-arranged, or traded, and regardless of whether a SASM is executed. 2.The replacement cost, if any, is charged to all QSEs based on LRS. 3.The QSE with the AS infeasible is not directly charged the full replacement cost, if any. 4.All revenues collected from charges to QSEs due to infeasible AS are paid to all QSEs based on LRS.

PUBLIC 16 Appendix ERCOT Public

PUBLIC 17 Ancillary Services Replacement Presenter: Ino González QMWG July 10, 2015 ERCOT Public

PUBLIC 18 Replacement of Undeliverable Ancillary Services NP Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (4)If ERCOT procures additional Ancillary Services for the amount of substituted capacity that is deemed infeasible or the amount of Ancillary Services capacity that each affected QSE does not replace, then all QSEs that bought the specific Ancillary Service in the DAM are charged for their share of the net cost incurred for the Ancillary Service procured by ERCOT as part of the multiple procurement processes (DAM and SASMs), in accordance with Section 6.7.3, Adjustments to Cost Allocations for Ancillary Services Procurement. ERCOT Public

PUBLIC 19 Replacement of Undeliverable Ancillary Services NP Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (5)If the QSE’s Ancillary Service capacity that is undeliverable because of a transmission constraint identified by ERCOT, as set forth in (1) above, was not awarded in the DAM or any SASM (i.e., the capacity is part of Self-Arranged Ancillary Services for the hours of the RUC Study Period), then the QSE is charged for the insufficient Ancillary Service capacity the same price paid for the Ancillary Service as purchasers in the DAM paid for that time period, as determined under paragraph (4) above. ERCOT Public

PUBLIC 20 Replacement of Undeliverable Ancillary Services NP Replacement of Undeliverable Ancillary Service Due to Transmission Constraints (6)If the QSE’s Ancillary Service capacity that is undeliverable because of a transmission constraint identified by ERCOT, as set forth in (1) above, was awarded in the DAM or any SASM, then the QSE is not compensated for the quantity of the Ancillary Service capacity that is undeliverable. ERCOT Public

PUBLIC 21 Replacement of Undeliverable Ancillary Services NP Adjustments to Cost Allocations for Ancillary Procurement (b) Each QSE’s share of the net total costs for Reg-Up for the Operating Hour is calculated as follows: RUCOST q =RUPR * RUQ q + Payment COLLECTED*HLRS q Where: RUPR=RUCOSTTOT / RUQTOT RUQTOT=RUQ q RUQ q =RUO q – SARUQ q +sasm RUO q =Sum[SARUQ q + (RTPCRU q, m ) + PCRU q – RURP q – RUFQ q ] * HLRS q + RURP q SARUQ q =DASARUQ q + RTSARUQ q ERCOT Public

PUBLIC 22 Questions that need to be answered to develop an NPRR 1.Should QSEs be charged (claw back) for undeliverable MWs? Options: Based on replaced MW or Undeliverable MW quantities  Note: Replaced MWs ≤ Undeliverable MWs  Example: DAM Award (10MW), Undeliverable (7MW), RURP(5MW), MCPCRU ($3)  DAM Payment = (-1)*10MW*$3/MWh = ($30)  Claw back option 1= 7MW*$3/MWh = $21 (QMWG consensus)  Claw back option 2 = 5MW**$3/MWh = $15 2.To what extend QSEs with self-arrange MWs are responsible for undeliverable quantities?  Should QSEs with DAM Obligations be charged when the self-arranged MWs are part of a trade that is undeliverable? (Yes, QMWG consensus) 3.Other policy questions? ERCOT Public