CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Public Informational Meeting North Street Wood Avenue to St Joseph Avenue Plan no Project Nos , , & City of Marshfield,
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008.
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Onondaga County CSO Abatement Gray Project Update.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Washington Avenue Reconstruction Project City of Chelsea Public Informational Meeting May 31, 2011.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Triskett Road Rehabilitation Lorain Avenue to West 117 th Street March 18, 2014.
Town of Franklin Department of Public Works Sidewalk Snow Removal Program January 6 th, 2009.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
Transforming the Robert M. Warner Research Center National Archives Building Washington, DC September 2011 – July 2012 Slide 1 of 11.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Utility Extension Project
April 10, 2002 Jon KreischerCVEN GIS Identifying Critical Sewer Lines.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
Presentation Overview Eagle Project Overview Key Participants & Organizational Structure Project Status, Approvals and Schedule Questions? Grandview Landscaping.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Current Construction Projects Major Projects Pinellas County.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Madison Avenue Reconstruction Department of Planning and Development.
Department of Public Works Proposed Underground Utility District 10-1 Mountain Street Lake Avenue to Hill Avenue.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
200 Yale Avenue Morton PA FAX: Exelon Infrastructure Services New Technologies Organization Starline 2000 & 200 CIP Date.
CROSSTOWN LRT Construction Liaison Committee June 14, 2017.
Heritage Park Area Construction Update July 28, 2015
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Middlebelt Transport and Storage Tunnel (MTST) Project
Village of east aurora sycamore street water improvements
Welcome to the Libertyville Stormwater Master Plan Open House
Closure of S. Lazona Dr. at Main St.
HVAC Building & Floor Cooling System
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
North Main Street Intersection Improvements at Route 460 Bypass
City of Katy – Pine Forest Workshop Update
Parkland/Brookdale Interceptor Replacement
Harbour Island Force Main Replacement
10 DAY PUBLIC NOTICE: Water Main
Presentation transcript:

CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM

AERIAL VIEW OF SOUNDVIEW AVE.

INSIDE VIEW OF THE PIPE SHOWING EXPOSED REINFORCEMENT

PIPE LINER

Tentative schedule  Work hours will be from 7:00 am to 7:00 pm Mon-Fri  July 28h – Contractor begins delivery of equipment and parts for temporary bypass pumping and forcemain installation  August 1st – 30 th – Contractor installs temporary 18 inch diameter forcemain pipeline along centerline of Soundview Avenue (pipeline to be buried in intersection with connecting streets, and placed on top of roadway between intersections).  September 2 nd – Contractor begins equipment mobilization for sewer lining installation  Sept 8th – Contractor begins sewer cleaning and internal sewer inspection  Sept 15th – Oct 2nd – Contractor installs sewer liner in 36 inch diameter and 42 inch diameter interceptor pipe in Soundview Avenue (estimated to take approximately 14 business days M-F)  Oct 6 th – remove temporary forcemain and restore road and property impacted by construction

RESIDENTS ON THE FOLLOWING STREETS WILL BE AFFECTED

WILLOWBROOK AVE, CARTER DR, WASCUSSEE LN, TUPPER DR

KENILWORTH DR E, SOUNDVIEW DR & SOUNDVIEW CT

WALLECKS DR, SOUNDVIEW AVE., KENILWORTH DR EAST & WEST

WALLECKS LN, WALLECKS DR & SOUNDVIEW AVE.