Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
André Augustinus 16 June 2003 DCS Workshop Safety.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
Electrical power distribution in experiments W.Iwanski.
M. Raymond – 08 January 2014 Summary of electrical activities foreseen on ATLAS.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
André Augustinus 16 September 2002 Safety issues.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Technical Support Activities in PH-ADO-PO
Operations Kendall Reeves. Past Year Commissioned new SDX1 cooling loop after removing foam insert inadvertently left inside (Denis and Joel) Commissioned.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Control, monitoring and safety aspects of electrical distribution in the Atlas experiment W.Iwanski PH/ESE-BE.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Infrastructure activities planned on ATLAS during YETS 2015 Thanks to all the experts who contributed Bruno Saint Sulpice, Denis Dumas, Serge Deleval,
60kW Thermosiphon control system
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
TC meeting P2 planning wks 3&4 A.Tauro
CALO News Pascal Perret LPC Clermont 22 January 2012.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
Rack Design Proposal as of 01/03/2013
CERN Data Centre ‘Building 513 on the Meyrin Site’
LV Safe Powering from UPS to Clients
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Extension SR1 WP3 Electrical installations
Insertable B Layer Cooling System
OT Survey & Adjustment Outline: Survey technique at present
November technical stop activities:
Presentation transcript:

Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski

Outline Modifications of switchboards EXD16/15X and EXD26/15X New UPS in US15 New switchboards EOD2’/15, ESD2’/15 and EOD5’/15A New switchboard EOD8/15A Modifications of repartition boxes in 19 TDAQ ROS racks in USA15 Refurbishment of cooling turbines in all electronic racks in USA15, US15 and UX15 06/11/2013W.iwanski PH/ESE-BE2

Modifications of switchboards EXD16/15X and EXD26/15X Goal: to integrate newly added breakers with our monitoring system – Due to lack of space inside those switchboards, one has to move an interlock module outside Impact: Stop of supply for racks on HOA and HOC for 1 day (November 2013) 06/11/2013W.iwanski PH/ESE-BE3

New UPS in US15 Goal: to provide smooth supply for electronic racks fed from Normal network in US15 L2 – Up to 10 min of autonomy, no Diesel back-up Impact: Stop of supply for racks fed from Normal network in US15 during 5 days (9-13 December 2013) 06/11/2013W.iwanski PH/ESE-BE4

New switchboards EOD2’/15, ESD2’/15 and EOD5’/15A Goal: to provide new type of control over powering outputs – Motorised breakers which keep failing to turn ON when driven from DCS will be replaced by a breaker_+_contactor combo in new switchboards Impact: Stop of supply for all equipment fed from UPS and Diesel switchboards EOD2/15, ESD2/15 and EOD5/15A for ~ 4 weeks (> March 2014) – EOD2/15: ID heaters, Muons, DCS station, Pixel-DCS, SCT- DCS – ESD2/15: Sniffers, DSS station – EOD5/15A: Muons, Larg cooling station, ID heaters, ID evaporative cooling 06/11/2013W.iwanski PH/ESE-BE5

New switchboard EOD8/15A Goal: to provide UPS power for new installations in USA15 Impact: Stop of systems running on temporary supply when connecting them to this new switchboard (> March 2014) – IBL cooling, new racks, Tile cooling station, Larg cooling station (moved from EOD5/15A), Turbo pump.. 06/11/2013W.iwanski PH/ESE-BE6

Modifications of repartition boxes in 19 TDAQ ROS racks in USA15 Goal: to reduce inrush current when powering racks ON Impact: Stop of supply in each concerned rack for 1 day (> March 2014) 06/11/2013W.iwanski PH/ESE-BE7

Refurbishment of cooling turbines in all electronic racks in UX15, USA15 and US15 (1) Goal: preventive change of motor+fan modules inside turbines due to projected end-of-life of bearings Impact in UX15: Stop of supply in each switchboard supplying a group of racks for ~ 1 day – HOA (5 turbines): 1 day – HOC (5 turbines): 1 day 06/11/2013W.iwanski PH/ESE-BE8

Refurbishment of cooling turbines in all electronic racks in USA15, US15 and UX15 (2) Impact in UX15 (cont’d) – HS USA side (23 turbines): 5 days Ground floor: 1 day 1st floor: 1 day 2nd floor: 1 day 4th floor: 1 day 7th & 8th floor: 1 day 06/11/2013W.iwanski PH/ESE-BE9

Refurbishment of cooling turbines in all electronic racks in USA15, US15 and UX15 (3) Impact in UX15 (cont’d) – HS US side (17 turbines): 4 days Ground floor: 1 day 1st floor: 1 day 2nd floor: 1 day 7th & 8th floor: 1 day 06/11/2013W.iwanski PH/ESE-BE10

Refurbishment of cooling turbines in all electronic racks in USA15, US15 and UX15 (4) Impact in UX15 (cont’d) – BWA (16 turbines): 3 days – BWC (16 turbines) : 3 days 06/11/2013W.iwanski PH/ESE-BE11

Refurbishment of cooling turbines in all electronic racks in USA15, US15 and UX15 (5) Impact in USA15 L1 (65 turbines), USA15 L2 (70 turbines) and US15 L2 (28 turbines): Stop of supply in each concerned rack for ~ 1 hour 06/11/2013W.iwanski PH/ESE-BE12