WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus 16 June 2003 DCS Workshop Safety.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Chiller control system Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
60kW Thermosiphon control system
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
3x1x1 m 3 Anode deck Suspension system WA105 meeting - 21 st of January, 2015 B. Aimard, G. Balik, L. Brunetti, G. Deleglise, D. Duchesneau, N. Geffroy.
Status & Plans for WA105 Control System
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LAPP BPM Read-out Electronics
CV PVSS project architecture
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
Magnet Safety System for NA61/Shine
Camera Slow Control for LST and Nectar cameras
Vertical Cryostat Kick-off metting
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S., ETHz RAVAT S., CERN RIGAUT Y., CERN VIANT T., ETHz EP Status & Plans for WA105 Control System DELEGLISE G., LAPP DUCHESNEAU D., LAPP GEFFROY N., LAPP KARYOTAKIS Y., LAPP 1

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Meeting Topics -Slow Control system -Status and plan of detector cabling -Racks Status -PVSS & Communication with other system -CRP Control system status -Planning for the two next months 2

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP SLOW CONTROL SYSTEM 3

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Slow control system recap Technical Network PVSS DATA SERVER CERN Network ethernet WA105-PC01 WA105-PC02 ETHERNET Oracle Server ETHERNET Raspberry Camera System (for LAR) REMOTE I/O CRio I/O ETHERNET CRio PCS DCS DSS Level Alarm Vaccum … HARDWIRED IN YOUR OFFICE LAPP Siemens Motorisation system 4

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP STATUS AND PLAN OF DETECTOR CABLING 5

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Phase 1: cable trays 200 mm 100 mm We defined cable trays to optimize cable routing. These should begin to be set up from 08/03/2016. Cable trays on the Top Cap 6

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Phase 2 & 3: Internal and external cabling The second phase of the installation consist in setting up the major part of sensors during the installation of the structure (Top Cap+CRP+Drift Cage). In phase 3, we will connect flanges to racks thanks to the cable trays. With this two phases, we will be able to do an “hot” test of the system of acquisition and the good cabling of our sensors. Cabling process: SensorsFlanges Racks 7 Phase 2 Phase 3

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Material for cabling 8 Connector Availability Cable Availability TemperatureOK PressureOK Heaters OK Trace AnalyzerOK High VoltageTo be ordered Level metersTo be ordered

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP RACKS STATUS 9

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Racks construction Distant Racks 10 CAEN Remote Racks

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PVSS & COMMUNICATION 11

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PVSS (WINCC-OA) CRP Control System Process Control System Detector Safety System Detector Control System Cryogenic Control System SLOW CONTROL Supervision & Control WinCC-OA CRYOGENIC CONTROL Supervision & Control WinCC-OA 12

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Slow Control System The supervision is almost done for the PCS, DCS and DSS so actually we work more on the CRP control system which use another technology (Siemens). 13

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP CRP Control System Status 14

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP CRP control system: tests at LAPP Tests were done with uncoupled motors – jacks and were processed with the Touch Panel Manual Modes and an elementary cycle have been implemented Some minor upgrades of the electrical rack are in progress at CERN Integration in PVSS has to be done Motors and jacks Electrical rack 15

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Integration in PVSS Architecture Definition of the communication between the Anode (CRP) Control System and the slow control Integration will be done soon Tests of the exchanges and of the global process will be carried out at CERN during the next weeks 16

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Foreseen Processing Manual Mode (ready with the Touch Panel) Homing (at the current position or at a given position) of the CRP plane (3 axes simultaneously) or of a selected axis Displacement of the plane in a jog mode (command in velocity up or down) Displacement of the plane or of a selected axis to a selected position Cycle Mode Test of an elementary cycle Implementation of algorithms to manage the failures  Degraded modes have to be investigated more into details… Simplified synoptic of the cycle 17

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP PLANNING FOR THE 2 NEXT MONTHS 18

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Planning 08/03/2016: Cable trays 2 nd week of March 2016: Modif cablage rack LAPP + test 14/03/2016: BathTest 3rd week of March 2016: PVSS Motorisation integration End of April/May 2016: Internal cabling End of Mars/April 2016: Racks transfert 2 nd week of April 2016: CRP Global test on the top cap 3rd week April 2016: External cabling 19 4rd week of March 2016: Test Motorisation

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP Thanks for your attention. 20

N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation EP AFTER ? Date: Sept 2016 – end of the year 2016 The second phase of our installation is going to be made at the level of the final tank. Thanks to our box interface the major part of the sensors will be already tested and cabled. We will connecting and testing the other sensors but also of setting up the interconnections with the other systems (CRYO, LAPP, AREA…) 21