CIMB ATM of PETRONAS Station at Bukit Subang Surge Protection Solution with Jan 07. 2012 GROUND CO., LTD Perfection Guarantee Security the 3 rd Generation.

Slides:



Advertisements
Similar presentations
How to wire CCTV SURGE PROTECTORS By F R Joseph Anton Limited
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Available boards – July Klang Sentral/Setia Alam Giant Klang Sentral Tesco Setia Alam Gantry Location: Di bahu Jalan Meru ke Persiaran Setia Impian.
Source One Source One Network and Building Solutions.
Curtain & Motor Control Course 20 Minutes Test 10 Minutes TIS Training Program 2012, Rev 1.1
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
Bergeron Products Innovations. Electrical Protection Division PRESENTS PROTECT YOUR INVESTMENTS By: James Bergeron.
Services System Design & CAD Drawings Full Installation to British and European Standards Property/Structural Assessments Annual Testing and Maintenance.
EE4503 Electrical Systems Design
TEFONIX International Co. Ltd. INTERNATIONAL Company Profile Carrie Tsung May 31, 2006.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Make sure that you have a grounding strap to avoid static discharge that can ruin your computer. You always need to have a grounding strap connected to.
Pro-environmental 3rd generation Digital grounding device
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
H. Fagard, A. Orsoni (IGN) 1 Journées DORIS - Toulouse, 2 et 3 mai 2000 CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK History Current status.
Given Connections Solution
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Nameplate Test Results for 30 Watt Solar Panel Shown in Class, Nov.
INSTALLATION. PURPOSE To learn the basic steps of installing DS200 systems.
Chapter 14: Inspection and Maintenance
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
1 © 2008 Cisco Systems, Inc. All rights reserved.Cisco Confidential014874_11_2008 ESD Best Practices Electrostatic Discharge and Grounding Cisco Best Practices.
SCADA and Telemetry Presented By:.
Jan’15 Kevin Thomas, Peter O’Connell, Peter Lewis, Steve Paskell, Martyn Walley Asbestos Issue Prevents Fire Safety Upgrade.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Using Microsoft Network Access Protection to test Dr.Web anti-virus software The workstations successfully checked by NAP can be used in a corporate network.
PSerc Lightning Protection: A Stroke of Luck? Theory and Application: Customer Side Low Voltage Systems Ward Jewell Wichita State University APPA 2005.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
How to do business guide. Fixed, Data and Hosted Solutions by Mandy Fazelynia Latest update – 11/11/2013 Operations Director.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
Peter Brackett- Canadian Pacific Railway Robert MacMillan- CSX Railroad Earl Chapman – Railway Consultant, (previously CN) Keeping Signals Working What.
GEM Industrialisation Plans with Korea CMS Minkyoo Choi, Inkyu Park, Minsang Ryu Univ. of Seoul Hyunsoo Kim Chonbuk National Univ.
THE WILDCATS MONA MILLER PAMELA HUBBARD DELBRA BALKCOM.
Facilities Study Committee September 20, Meeting 1 Agenda Introductions Committee Makeup Parents Staff Community Members Goal Process Middle School.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
Gsm Modems Based Irrigation Water Pump Controller for Illiterates
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
1 RF Lightning Arrestors & Grounding Mike Baker, W8CM.
Residential Wiring Unit 3 – Installation and Planning.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
CJA 454 Week 1 DQ 1 Check this A+ tutorial guideline at 454-NEW/CJA-454-Week-1-DQ-1-NEW Can a police force be prepared.
CJS 250 Introduction to Security Check this A+ tutorial guideline at 250/CJS-250-Complete-Class. For more classes visit.
CMGT/410 Project Planning & Implementation Version 13 Check this A+ tutorial guideline at 410/CMGT-410-Complete-Class-Guide.
CMGT 411 Week 1 DQ 1 What makes a successful information security awareness program and how a security awareness program can be one of an organization’s.
CMGT 411 Complete Class CMGT 411 Introduction to Information Systems Security Management Version 3 Check this A+ tutorial guideline at
CMGT 430 Complete Class CMGT 430 Enterprise Security Version 4 Check this A+ tutorial guideline at 430/CMGT-430-Complete-Class.
COMM 400 Management Communication Skills Version 5 Check this A+ tutorial guideline at 400/COMM-400-Complete-Class.
ECO 365 Complete Class Check this A+ tutorial guideline at 365/ECO-365-Complete-Class For more classes visit
ECO 365 Week 2 Individual Supply and Demand Simulation Check this A+ tutorial guideline at 365-Week-2-Individual-Supply-And-Demand-
ECO 372 Complete Class Check this A+ tutorial guideline at O-372/ECO-372-Complete-Class For more classes visit
EDL 535 Complete Class EDL 535 Legal and Ethical Issues in Education Version 3 Check this A+ tutorial guideline at
BUS 210 Foundations of Business Version 5 Check this A+ tutorial guideline at S-210/BUS-210-Complete-Class. For more.
BSHS 352 Complete Class Version 4 Check this A+ tutorial guideline at HS-352/BSHS-352-Complete-Class. For more classes.
BSHS 382 Complete Class Version 3 It DOES NOT Include Quiz Check this A+ tutorial guideline at 382/BSHS-382-Complete-Class.
BSHS 452 Complete Class Program Design and Proposal Writing Version 2 Check this A+ tutorial guideline at 452/BSHS-452-Complete-Class.
PSY 340 Complete Class Version 3 Check this A+ tutorial guideline at Y-340/PSY-340-Complete-Class-Guide For more classes.
IT 242 Week 5 DQ 2 To purchase this material link 242-Week-5-DQ-2 For more courses visit our website
BIS 219 Complete Class Check this A+ tutorial guideline at Complete-Class. For more classes visit
BSA 375 Fundamentals of Business Systems Development Version 13 Check this A+ tutorial guideline at 375/BSA-375-Complete-Class.
Booking Guidelines.
find-the-best-cctv-system-company-in-singapore
SmartShoes Enterprise
Connectivity methods. Connectivity methods Exam Answer WAN/LAN  Each office will have its own Local Area Network or LAN.  But the company also wants.
Difference between Earthing & Grounding
Presentation transcript:

CIMB ATM of PETRONAS Station at Bukit Subang Surge Protection Solution with Jan GROUND CO., LTD Perfection Guarantee Security the 3 rd Generation Digital Grounding Apparatus for Perfect Lightning Surge Protection without Grounding US PATENT 7,652,865 B2 SIRIM TEST : IEC 주소 : Petronas Gas Station, No8 (Lot 11509), Persiaran Metafasa, Seksyen U16, Shah Alam, Selangor, Malaysia

DateJob DetailRemark Oct Install Test version without “N-G” bonding Oct Site visit to check for Modem power off Check Power Line, report to Korea Modem power-off by surge Nov Site survey for ATM & Petronas Main DB upon guideline from Korea * eca3G N-G => Volt * Main DB N-G => Volt, ( Earth Leakage Relay is installed ) Survey surge damages of Petronas Station system => KIOSK system, Telephone line have surge damages. Nov Decide to install modelAir delivery. enable for N-G bonding Nov Install model with CTO of GROUND Co., Ltd 500 watt model PLAN After confirm best protection scheme, Prepare one-body type model Will change to one-body Model PROGRESS to find best protection under site environment *Site Condition : - ATM cannot connect to GROUND of Petronas Station - Power supply system is T.T grounding system, cannot N-G bonding - All equipment are aging status from frequent surge attack, very weak status

Sub DB Earth Leakage Relay

Maybank ATM Out of Order MayBank ATM – out of order Modem 1 Modem 2 Maybank ATM without is also Out Of Order. Maybank ATM has two Modems, One is ISDN modem and the other is Tellabs modem, If Tellabs modem has Problem, ISDN will support, but Two modems all down when we visited.

** Install model at Nov with CTO of Ground Co., Ltd

connection / Nov. 17, 2011 for CIMB ATM Data Line Power Line Grounding Wall ATM Box ATM eca3G TN-C eca3G-BOLEH

** eca3G TN-C installation : Check before Installation

** eca3G TN-C installation : Power connection, Grounding cable to

** eca3G TN-C installation : Power connect to

Bukit Subang, Petronas 주유소 내, CIMB 은행 현금자동지급기ㅡ 방호

Jalan Metafasa U16/3, Shah Alam, Selangor, Malaysia