Project ELLA Project ELLA (European Link to Latin America)

Slides:



Advertisements
Similar presentations
February Joint Project of the ITU Telecommunication Development Bureau and Ministry of Infrastructure, Republic of Poland
Advertisements

Directions of telecommunications operators growth – business aspects Michał Wasilewski JA-Z
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
Valuing an Acquisition
MANAGERIAL ACCOUNTING
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Chapter 17 Investment Analysis
AGM Finance Update Derrick Sturge, Vice-President, Finance & CFO June 4, 2014.
Valuing firms with no Earnings1 Valuing Companies with Negative Earnings Many start-ups have losses or very small profits for the initial years due to.
Presentation to Frozen Assets Limited Feasibility Study D.M.S Jehan Kanagasingham Lucian Keong Chris Nugent D.M.S.
Executive Summary Nokia's net sales in 2003 decreased by 2% compared with 2002 and totaled EUR million (EUR million in 2002). Operating.
The Need for an Energy Grid in the Maldives
Luiz Eduardo Teixeira Brandão PUC-Rio Davis Machado da Silva Teixeira Embratel S.A. B ID P RICE D ETERMINATION IN A T ELECOM A UCTION.
Valuing an Acquisition
© 2007 Verizon. All Rights Reserved. PTE /07 FCC Workshop Global Broadband Connects the World Jacquelynn Ruff Vice President, International Public.
FDM11 Capital investment apprasal 3 Capital investment appraisal 3.
ROLE OF DIFFERENT STAKEHOLDERS AND HYBRID FINANCIAL MECHANISM OF MHI Public Private Partnerships or PPPs as Means of Financing Infrastructure in MHI Projects.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Vivien Foster & Cecilia Briceño-Garmendia, World Bank.
© GSM Association 2011 Mobile Energy Efficiency Mobile and Environmental Sustainability 20 September 2012.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Peering, network sharing, interconnects Eckart Zollner September 2014.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Investment Decisions and Capital Budgeting
Accessing Fixed Networks and Facilities to Speed Up Broadband Rollout Presented by Andrew Gorton CANTO 29th Annual Conference & Trade Exhibition 14 th.
Investor Conference March 2001, Rio de Janeiro. 1 This presentation contains statements that constitute forward-looking statements within the meaning.
1 Rabih Dabboussi Director, Systems Engineering – Emerging Markets Director, Service Provider Segment – Emerging Markets General.
November 8, Global Competitive Internet Usage Forecasting Across Countries and Languages June Wei Department of Management/MIS College of Business.
Svyazinvest in 2002: restructuring continuing November 2002.
Overview of Interexchange Developments in other Regions and Relevance to the Caribbean Max A. Figueroa Vice President International Terremark Worldwide,
Class 3 Investment Decisions and Capital Budgeting.
CORPORATE FINANCE I ESCP-EAP European Executive MBA
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
April 27, Atlas Copco Group Q1 Results April 27, 2005.
Is Europe ready for a telecom rebound? Didier Pouillot Head of industrial department analysis, IDATE Jean-Charles Doineau Head of equipment.
0 Teleconference 1 st Quarter 2007 Results. 1 Disclaimer This document contains “forward-looking statements”. Forward-looking statements may be identified.
CHAPTER 10 DEALING WITH UNCERTAINTY. RISK Risk and uncertainty are similar in that they both present the problem of not knowing what future conditions.
Lavendon Group plc 2006 Preliminary Results Presentation March 2007.
WiMAX - The new Wireless Standard TELE 480 Mike Davison 11 Oct 2006.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Sureel Choksi President, Transport & Infrastructure Services © 2003 Level 3 Communications, Inc. All rights reserved. Reproduced.
 2007 Level 3 Communications, Inc. All Rights Reserved. 1 Business Markets Group: Reliable and Responsive Prepared for CUSTOMER NAME PRESENTER’S NAME.
0 DASA 2006 and 4Q06 Earnings. 1 Disclaimer This document contains “forward-looking statements”. Forward-looking statements may be identified by words.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Cisco Visual Networking Index Mobile Data Traffic Forecast  8 a.m.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
Copyright: M. S. Humayun Financial Management Lecture No. 12 Capital Rationing Batch 3-5.
Chapter 3: Fundamental Principles of Value Creation
Danone Philippe Rich, Peter Huo, Christie Wei January 9th,
CSC Proprietary and Confidential 1 Business Case Executive Presentation Offering Name: [ ] Offering Manager: [ ] Date: [ ]
1 GDP by sector 2012 Source: DANE Colombia’s economy grew 4.0% during 2012 (USD 378 Billion). According with the IMF, the Colombian economy is expected.
PRESENTATION ON FINANCIAL COMPONENT OF A BUSINESS PLAN BY AHMeD Hussain Khan.
Open > accesschoicesupportfreedomcommunity Scott Ford President and Chief Executive Officer 13th Annual Salomon Smith Barney Global Entertainment, Media.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
© 2016 Global Market Insights. All Rights Reserved Solar Tracker Market size Forecast Analysis ( )
MarketsandMarkets Presents Commercial Airport Lighting Market - Terminal, Airside and Landside from 2013 To 2018
Building Europe Link to Latin America Fernando Liello and Thomas Fryer | BELLA Consortium | 15 June 2016 | TNC2016.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
July 16, Atlas Copco Group Q2 Results July 16, 2004.
Second Quarter 2006 interim report
Strategic Management/ Business Policy
Power Point Set 9b: Competitive Dynamics: Real Options
Financial Implication of strategic investment decisions
Power Point Set 9b: Competitive Dynamics: Real Options
Strategic Management/ Business Policy
Strategic Management/ Business Policy
Power Point Set 9b: Competitive Dynamics: Real Options
Financial Implication of strategic management decisions
What happened in Portugal’s recent record-breaking solar auctions?
How Is In-Building Wireless System Importance and How Big Is the Market Size?
Presentation transcript:

Project ELLA Project ELLA (European Link to Latin America)

South America Traffic Forecast

LA-EU Expected Traffic Growth Recent data released by UIT shows 103% growth in For the period 2019 – 2027 a 23.5% CAGR growth was considered. Growth trends for Internet were derived from expected growth rates for access speed, number of users and utilization per user in mobile and fixed services.

The Current Situation of Cables The route US-Europe has 8 cables with around 15.6 Tbps lit capacity and 49.5 Tbps demonstrated design capacity (Submarine Telecom Industry report 2012). Atlantis-2 is the only cable that connects Latin America to Europe directly. The cable has a maximum bandwidth capacity of 160 Gbps (capable of transporting only a small portion of the LA - Europe traffic)

Investment Opportunity Today the majority of traffic between Latin America and Europe is routed through the United States. Several submarine cables link Fortaleza (Brazil) to Florida (US) The business opportunity comes with the explosive growth of the data traffic. According to Cisco Visual Networking Index - that forecasts 49% (CAGR) IP traffic Growth for Latin America 2011 – 2016 (Brazil 53%), the dramatic jump in Internet traffic will occur as a result of four key factors: 1) More devices 2) More people 3) Faster speeds 4) More videos Then, the construction of a Submarine cable linking Latin America directly to Europe (ELLA - European Link to Latin America) will be a unique investment opportunity.

Cable Route Selection Several different routes and terminations were analyzed in order to determine the best alternative for ELLA. In Brazil, both Fortaleza and Santos were selected as potential landing station spots:  Fortaleza is much closer to Europe, but is still a long way from the most important economic centers (São Paulo and Rio de Janeiro).  Santos is far from Europe, but much closer to São Paulo and Rio de Janeiro. On the other end of the cable, several European landing station spots were analyzed:  United Kingdom, France and Spain: great connectivity to the rest of Europe, but these options is all considerably farther from Latin America than Portugal and the Canary Islands. For that reason, these options weren’t considered.  Portugal: Great connectivity to the rest of Europe and relatively close to Latin America  Canary Islands: Closest alternative to Latin America. Although there are several cables connecting the Canary Islands to Europe, it might be very expensive to hire these additional terminations to Europe (deals should be made before hand).

Selected route for ELLA cable. PHASE 0 Deployment of a redundant submarine cable between Fortaleza and Canary Islands. PHASE 1 Operation with termination agreements to carry the traffic from Fortaleza to Santos and from Canary Island to Europe. Deployment of terminations. Single submarine cable between Fortaleza and Santos. Single submarine cable between Canary Island and Portugal. Starting date of terminations commercial operation: January 2019 PHASE 2 Regular operation with agreements to guarantee terminations redundancies. Capacity fulfillment

Capital Expenditures ELLA’ capital expenditures (Capex) can be grouped in two main categories:  Submarine Cable and equipment  Land station construction Table below presents the project estimated Initial Capex, for Alternative 1 (US$ 196 million), being funded by 80% (US$ 156 million), with implementation from 2012 until Investments for Total Capex (US$ 345 milion, 20TB Capacity and Termination Brazil and Europe), will be made from 2016 to 2017 and will be financed with the results of the project. ROUTE LANDING STATIONS INITIAL CAPEX TOTAL CAPEX (MM USD) 20 TB CAPACITY (MM USD) 1TB Alternative 1 Forlaleza Canary Islands Termination Brazil Santos Fortaleza Termination Europe Portugal Canary Island TOTAL

Financial Plan and Scenarios The financial plan model was made for three scenarios (results below), all of them with expressive NPV.  Base Scenario, based on basic and conservative forecasts for market demand, ELLA’ market share and pricing.  Aggressive Scenario considers the same market demand of the baseline scenario, but at a price 15% lower for the services offered by ELLA. With a lower price you can gain a greater market share in Europe and LA-route a portion of LA-US traffic.  Low demand Scenario considering a lower demand in the market. ScenarioPAYBACKIRRNPV AnalysisYEARS% (US$ MILLIONS) Base %256.5 Agressive %539.4 Low Demand %115.2

Projected revenues are expected to reach US$ 269 million in year The estimated NPV is US$ 256 million, which translates into an IRR of 29.2% and a payback period of 6.8 years for the investment (after a three year investment period with no revenues). Base Scenario

This scenario assumes an additional 15% discount on prices. Because of the lower price, a higher market share was assumed on this situation. The projections are: revenues of US$ 429 million in 2021, an IRR of approximately 41% and a payback period of 5.2 years. Agressive Scenario

In the scenario, expected economics are still viable with revenues of US$ 155 million in 2021, an IRR of approximately 22.4% and a payback of 7.5 years. Low Demand Scenario

Summary There is no direct cable with significant capacity between Latin America and Europe and most of this traffic is routed today through the United States. The construction of a submarine cable linking Latin America (LA) directly to Europe (EU) will be well positioned to capture the traffic between Latin America and Europe offering lower prices and better services. The opportunity comes with an explosive growth of the demand for high capacity data transport. Projections show that demand (Tbit/s) will grow rapidly at around 32,1% CAGR between 2015 – From this traffic between 20 and 30% actually goes to Europe. The base case is very attractive and robust, offering above average returns and high upside potential. Projected revenues are expected to reach US$ 269 million in year The estimated net present value of the project is US$ million, which translates into an IRR of 29.2% and a payback period of 6.8 years for the investment. Also in the low demand scenario there is a payback of 7.5 years and in the aggressive case, are expected an IRR of approximately 41% and a payback period of 5.2 years

Conclusions We have studied different scenarios of traffic growth and business strategies. All the scenarios lead to solid earnings and a payback period of not more than 7 years. This proves our initial statements about the robustness of the business case.