The HCM Update & NCHRP 7-22 – The Planning & Prelim. Eng. Applications Guide January 2014.

Slides:



Advertisements
Similar presentations
FHWA Guidance & Policies on Traffic Analysis James P. McCarthy, PE, PTOE Federal Highway Administration
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Statewide Mobility Performance Measures Team Meeting Webinar June 17, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
The 2010 Highway Capacity Manual
HCM 2010 WORKSHOP PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA DAN SMITH, P.E. MISSOURI DEPARTMENT OF TRANSPORTATION.
Determining the Free-Flow Speeds in a Regional Travel Demand Model based on the Highway Capacity Manual Chao Wang Joseph Huegy Institute for Transportation.
Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
NCHRP Project : Evaluating the Performance of Corridors with Roundabouts Photo: Lee Rodegerdts.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
FREIGHT PLANNING – MPO’S ROLE Ms. Pragati Srivastava Memphis Urban Area Metropolitan Planning Organization (MPO) February 27, 2014.
Enhanced Safety Prediction Methodology and Analysis Tool for Freeways and Interchanges James A. Bonneson August 2012 NCHRP Project
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
Session 10 Training Opportunities Brief Overview of Related Courses in USA / Canada Geni Bahar, P.E. NAVIGATS Inc.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
May 27, :00 – 11:45. MPM Team Agenda 1.Review of MPM program and team 2.MAP-21 and other updates 3. On-going activities 4. Outreach and upcoming.
1 NCHRP Update of the AASHTO Guide for the Planning, Design, and Operations of Pedestrian Facilities Final Report.
Case Study 1 Styner/Lauder Intersection Moscow, Idaho.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Calibrating Model Speeds, Capacities, and Volume Delay Functions Using Local Data SE Florida FSUTMS Users Group Meeting February 6, 2009 Dean Lawrence.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
Statewide Freight Planning Considerations Ohio Department of Transportation Suzann Rhodes, AICP Administrator, Office of Urban and Corridor Planning
Problem 1: Determination of Facility Types for Analysis.
San Joaquin Valley Sustainable Communities Strategies (SCS) Update July 25,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Highway Capacity Manual. Highway Capacity Manual (HCM) Most widely referenced and best selling document of the Transportation Research Board HCM 2000:
5/8/02FHWA Office of Safety1 FHWA Safety Core Business Unit Office-Level Structure Develops and manages programs for the safe operation of roadways, bicycle.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
A case–driven comparison of Freeway Performance Measurement Systems by Shailesh Deshpande.
Performance Measures Used in the DFW Region – How to Track and Report the M & O Investment and Results AMPO Management and Operations Work Group September.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
NCHRP 7-22 Planning & Preliminary Eng. Applications Guide for the HCM Kittelson & Associates, ITRE, Mike Kyte, Stantec, Write Rhetoric 1 Full Committee.
Incorporating Truck Analysis Into the HCM - Proposed Truck LOS Model Rick Dowling Kittelson & Associates HCQS Presentation 1/12/14 1.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
The New 2010 Highway Capacity Manual An Overview.
AASHTO CV/AV RESEARCH NCHRP (98) NCHRP
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Publication No. FHWA-HRT Bicycle and Pedestrian Planning.
NCHRP 7-22 Planning & Preliminary Engineering Applications Guide for the HCM Kittelson & Associates 01/12/15 1 Status Report.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
NCHRP Synthesis Topic Extent of HCM Use in Planning Aaron Elias Richard Dowling January 22, 2012 Planning and Preliminary Engineering Subcommittee.
INDOT Office of Traffic Safety Manager, Mike Holowaty
Statewide Mobility Performance Measures Team Purpose Consensus on approach and measures.
NCHRP Report 825 Planning & Prelim. Eng. Applications Guide to the HCM 1.
“Bringing Back-of-the-Envelope Back”
The New Highway Capacity Manual 6th Edition It’s Not Your Father’s HCM
“Bringing Back-of-the-Envelope Back”
Data-Driven Safety Analysis
Planning & Preliminary Applications Guide to the HCM
School of Civil Engineering
Presentation transcript:

The HCM Update & NCHRP 7-22 – The Planning & Prelim. Eng. Applications Guide January 2014

The HCM Update Planning and Prelim. Eng. Related Wish List 1.Improve HCM statement of purpose and need 2.Improve educational value of HCM. 3.Incorporate minor improvements recommended by NCHRP Ensure defaults available for all methods for planning apps. 5.Find mechanism to continually evaluate and improve HCM. 6.Harmonize facility/segment perform. measures for corridor analyses. 7.Create two-lane urban and suburban facility analysis method. 8.Consider average speed rather than percent free-flow speed. 9.Develop v/c ratio as standard output for all facility types. 10.Planning App for freeway network and facility reliability (fwy) 11.Include minor intersections in 2-lane planning method (2-ln). 12.Planning method for oversaturated conditions (research need) 13.Coordinating road facilities with development densities. 14.Improved planning method signals (sigsub)

HCM Update – P&PE Research Bundle (#11)(a) TopicRec 1. Incorporate NCHRP 7-22 P&PE Apps Guide into HCM Develop network system evaluation approach LOS of arterial weaving segmentsDefer 4. LOS of urban local streetsDefer 5. MMLOS for networkDefer 6. MMLOS for innovative bike facilitiesDefer 7. Planning App for network travel time reliability Define easily field-measured performance measures Control delay as LOS for long urban street.HCQS 10. Mean speed for arterial LOSHCQS

HCM Update – P&PE Research Bundle (#11)(b) TopicRec 11. Consistent LOS across facility types for corridor anlys Address MAP-21 planning requirements Improve consistency of LOS across facility types Network performance measures Larger set of performance measures Merge reliability measures of predictability & efficiency Add v/c output to all methods7-22

Discussion Wish List Proposed disposition for HCM Update Any changes?

NCHRP 7-22 Status ProductSchedule 1. Literature ReviewAugust 2013 √ 2. Chapter AssessmentAugust 2013 √ 3. Draft Scope & OutlineAugust 2013 √ 4. Stakeholder OutreachOctober 2013 √ 5. Interim ReportDecember 2013 √ 6. Draft Guide & WorkshopsJuly Draft Supplemental MaterialsAugust WorkshopsOctober/November Final ProductsMay 2015

HCM 2010 Chapter Assess. for Planning Apps ChapterPlanning App?Defaults? Service Vol. Tables? Quick Est. Method? Example Probs? 10-Fwy No YesNo 11-Basic Yes No Yes 12-Weave YesNo Yes 13-Ramp Yes No Yes 14-MLHwy Yes NoYes 15-2LnHwy Yes NoYes 16-UrbStrt Yes No 17-Segmnt Yes NoYesNo 18-Signal Yes No 19-TWSC Yes No 20-AWSC Yes No 21-Round Yes No 22-ICRT No 23-OffBike Yes No Yes

Stakeholder Outreach 37 planning professionals (State DOTs, MPO’s) (2 cities, 2 consult)  Association of MPO’s Meet (AMPO) - Portland, Oregon  Florida MPO Advisory Council Meet – Orlando, Florida How do they currently use HCM?  Almost all using HCM for planning purposes (some 2010, some 2000)  CMP’s, corridor studies, intersections, service vol. tables, demand modeling  Comparing alternatives, project programming/prioritization  Almost all use LOS, v/c, delay Challenges with Using HCM?  Technical nature, complexity, size Needs for HCM?  Guidance, travel time reliability, truck LOS, Advice?  One size does not fit all.

P&PE Apps Guide – Need, Scope, Audience Need  Improve awareness of contents of HCM  Provide guidance on overcoming data and complexity issues  Address decision making needs of planners Scope  Identify appropriate use of default values, service vol. tables, quick estimation methods for each type of planning analysis.  Demonstrate application of HCM methods.  Show how to coordinate HCM analysis methods with planning tools.  Selecting appropriate performance measures by type planning analysis. Target Audience  Professionals involved in estimating the need for and benefits of highway capacity, monitoring, management, and operations investments

Table of Contents (1) 0. How to Use the Guide PART 1 – PLANNING APPLICATIONS 1. Long Range Transportation Planning  Long Range Transportation Plans, Master Plans, Zone Changes, Other 2. Short Range Transportation Planning  TIPs, Alternatives Analysis, Corridor Studies, Other 3. Environmental Studies  Emissions, Noise, Environmental Justice Analyses 4. Performance Monitoring  MAP-21, State, Regional & Local levels

Table of Contents (2) PART 2 – HCM PLANNING APPLICATIONS A. Defaults B. Service Volume Tables C. Working with Demand Data D. Intersection Traffic Control E. Guidance for Freeway Analyses F. Guidance for Multi-Lane Highway Analyses G. Guidance for Two-Lane Highway Analyses H. Guidance for Urban Street Analyses I. Guidance for Signalized Intersections J. Guidance for Stop Controlled Intersections K. Guidance for Roundabouts

Table of Contents (3) PART 2 – HCM PLANNING APPLICATIONS L. Guidance for Interchange Ramp Terminals M. Guidance for Off-Street Pathways N. Guidance for Corridors O. Guidance for Areas and Systems PART 3 – CASE STUDIES I. Long Range Transportation Plan II. Freeway Alternatives Analysis III. Environmental Impact Study for Urban Street IV. Statewide Roadway System Monitoring.

Next Steps Panel Review – February 2014 Draft Guide – July 2014 Workshops to vet the Draft Guide – October - November 2014 Final Guide – May 2015

The NCHRP 7-22 Team Paul Ryus – Kittelson & Associates Tom Creasey - Stantec Mike Kyte – University of Idaho Bastian Schroeder – North Carolina State University (ITRE) Danica Rhodes – Write Rhetoric

NCHRP 7-22 Panel Mr. Dirk B. GrossOhio DOT (Chair) Mr. Tyrone Anthony ScorsoneCambridge Systematics Mr. Robert W. BrysonCity of Milwaukee Mr. Brian G. DunnOregon DOT Ms. Jessie X. JonesArkansas SHTD Mr. Subrat MahapatraMaryland State Highway Administration Mr. Erik O. RuehrVRPA Technologies, Inc. Dr. F. Andrew WolfeSUNY IT Mr. Jeremy RawFederal Highway Admininistration Dr. Matthew HardyAASHTO Mr. David A. BizotU.S. EPA Mr. Richard A. CunardTransportation Research Board Mr. Nanda SrinivasanTransportation Research Board (SPO) Ms. Charlotte ThomasTransportation Research Board (Assist)