05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.

Slides:



Advertisements
Similar presentations
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Advertisements

Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
TTC TB Nov.7, TESLA Technology Collaboration At Jlab, 5-8 November, 2012 Nobu Toge and Wolf-Dietrich Moeller Report from the Technical Board (TB)
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
05/12/2011O. Napoly1 TESLA Technology Collaboration Meeting Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ILC Accelerator Activities in Japan
WP5 Elliptical cavities
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
WG3 Summary High current and CW accelerators
WG-1 Session Cavity Performance Cryomodule Performance
Plans for a Superconducting Proton Linac at CERN
TTC - JLab - Bob Laxdal - TRIUMF
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
TESLA Technology Collaboration KEK, 2-5 December 2014
Superbeams with SPL at CERN
Introduction to Jefferson Lab
ERL2015 WG4: RF & superconducting RF for ERL
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Nick Walker (DESY) EU GDE Meeting Oxford
Olivier Napoly, coordinator CEA/Irfu
Report of TTC-TB meeting at INFN-Milano
TTC meeting at Milano, 2011' Feb. .28
ERL Director’s Review Main Linac
Hans Weise, DESY February 5th, 2019
Presentation transcript:

05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting

The TTC meeting is hosted in Newport News, by the Thomas Jefferson National Accelerator Facility. Many thanks to: Charles Reece, JLab for chairing the meeting and the LOC. Many thanks to: Fulvia Pilat, John Mammosser, Robert Rimmer and Andrew Hutton for making it possible. 05/12/2011O. Napoly2

TTC Members 05/12/2011O. Napoly3

TTC Members 05/12/2011O. Napoly4 New MoU’s signed since last meeting TTC membership consists of 55 Institutes, from 14 countries and 2 International Organisations thanks to Katrin Lando (DESY) for her administrative support The TTC Web Page has been upgraded to includeWeb Page SRF accelerators in Europe SRF facilities at FNAL and CEA It should be completed…

TTC committees new membership TTC Deputy Chair: Camille Ginsburg TTC Executive Committee: Fulvia Pilat, Hans Weise, Akira Yamamoto Technical Board Chair: Nobu Toge Deputy-Chair: Wolf-Dietrich Möller Thank you for accepting to share the responsability. 05/12/2011O. Napoly5

New Scientific Developments Since the last TTC meeting in December 2011 Two major discoveries… 05/12/2011O. Napoly6 the discovery of the Higgs boson, m h 0  126 GeV the measurement the Neutrino mixing angle,  13  9°

New Scientific Developments The discovery of the Higgs Boson, at the LHC and the TeVatron 05/12/2011O. Napoly7 Higgs, Brout, Englert h 0  Z 0 Z 0 * m h 0 ~126 GeV

New Scientific Development n°1 Like the major past scientific findings, the discovery of the Higgs boson brings Perspective to Mankind: our world obeys U(2)-symmetric laws of dynamics, despite the so-far unresolved U(1) symmetry. 05/12/2011O. Napoly8 ‘U(2) rotation’ symmetric Higgs Lagrangian. ‘U(2) rotation’ asymmetric low- energy state. courtesy P. Oddone

The Current Accelerator Facility The LHC uses SCRF Technology derived from LEP2 05/12/2011O. Napoly9 cf E. Ciapala at TTC Beijing 8 SC cavities/beam – total 16, in 4 cryomodules at IR4 2 MV nominal per cavity, 5.5 MV/m nominal gradient Low R/Q: 44  Variable power coupler, High Power handling 11,000 < Q ext < 200,000 One klystron per cavity, rating 330 kW Cryostat section Main Coupler Port HOM Port Bare cavity

New Development n°1 leads to … Elucidating the Higgs mechanism of spontaneous electroweak symmetry breaking (i.e. from which grape is made the bottle ?) may bring the key to the Grand Unification (SU(5), O(10),…). 05/12/2011O. Napoly10 The answer will come from one decade of LHC runs, or from an e+e- collider.

… New Accelerator Directions To elucidate the Higgs mechanism of spontaneous symmetry breaking, all three main contenders use extremely demanding SCRF technology: High Luminosity LHC: main RF and RF crab cavities with high accuracy of RF control A circular Higgs Factory collider: 10 to 20 GV of CW SCRF A linear Higgs Factory collider, the ILC: 250 GV of pulsed SCRF duty cycle (~ 0.5 %) 05/12/2011O. Napoly11

New Development n°2 leads to… The Measurement of the Neutrino mass mixing angle  13 05/12/2011O. Napoly12 This is a major step towards uncovering the Neutrino mass hierarchy and CP violation in the Lepton sector  discovery

… New Accelerator Directions A long baseline experiment pointing a SuperBeam on a Megaton detector is the next step: a powerful multi-MW multi-GeV SCRF proton linac (Project X, SPL, … ) is the most favourable solution. 05/12/2011O. Napoly13

My Idea of the TTC The TESLA Technology Collaboration is at the same time: 1. a “forum” of discussions and exchanges on Superconducting Radio Frequency (SCRF) systems cutting edge developments, from the R&D level to running accelerator aspects and, in return, 2.a “think tank” capable of providing top level and experienced advices and expertise to SCRF accelerator projects, from the design phase to the operation stages, including optimisation and upgrades. The TTC “forum” culminates during the TTC meetings whose success is guaranteed by the excellence of the presentations, intellectual debates and technical findings that it convenes, by free will, from the members of the TTC institutes. The TTC “think tank” is a unique body comprising most of the major accelerator centres and accelerator science institutes in the world, addressing a broad range of applications in scientific fundamental research. 05/12/2011O. Napoly14

Priorities of TTC until /12/2011O. Napoly15 Performances of SCRF systems

Priorities of TTC : /12/2011O. Napoly16 Performances Applications of SCRF systems

A proposal for TTC Priorities /12/2011O. Napoly17 Performances ApplicationsEconomics of SCRF systems ‘ APE ’

TTC Jlab Meeting Scientific Program Programme Committee: Camille Ginsburg (FNAL), Olivier Napoly (CEA), Wolf-Dietrich Möller (DESY), Charles Reece (Jlab), Nobu Toge (KEK) WG1: ‘SRF systems and components for high-intensity or CW beam operation’ Conveners: Yuan He (IMP-CAS), Robert Laxdal (TRIUMF), Sébastien Bousson (IPN-Orsay) Several projects of high intensity hadron linear SCRF accelerators around the world are in operation, construction or design. They involve many forms of SRF cryomodules based on a variety of low, medium and high beta superconducting RF resonators designed to withstand long pulse or CW beam operation. Working Group n°1 should organize a review and a discussion about the recent designs and the recent developments, based on experimental results on cavity RF tests, problems and technical solutions for cavity fabrication, coupler and tuner limitations, cryomodule assembly and RF performance. WG-1 should also be opened to neighboring topics like experience in low-beta machine operation and upgrades, cold RF measurements and coupler test benches, or other CW applications. 05/12/2011O. Napoly, TTC Chair18

TTC Jlab Meeting Scientific Program WG2 conveners: ‘High gradient and high Q0 cavity developments’ Conveners: Yasuchika (Kirk) Yamamoto (KEK), Gigi Ciovati (JLab), Denis Kostin (DESY) The ability to establish high accelerating fields during long or CW pulses at affordable cooling power, is the root of the success of the accelerator SRF technology. Improving the performance of SCRF cavities is a longstanding and continuous objective of the TTC which encompasses understanding the physics of SRF surfaces, the design of RF resonators, the techniques for cavity fabrication and preparation, the surface investigation devices and the instrumentation at test facilities, etc… Working Group n°2 should aim at continuing this investigation by reviewing and discussing the current trends and experimental results obtained in the past year. WG-2 should also be opened to neighboring topics in the area of cavity performance and RF instrumentation. WG3 conveners: ‘Developments of specialized cavity systems’ Conveners: Eiji Kako (KEK), Mathias Liepe (Cornell University), Peter McIntosh (STFC) New applications of the SRF technology have led to the recent and innovative development of specialized cavity systems which still require design, R&D and prototyping work in order demonstrate their promises, notably SCRF guns, SRF systems for ERLs and, transverse deflecting cavities (crab cavities). WG-3 should aim at reviewing the progress in this innovative field of research by presenting the most recent design optimizations, R&D realizations and prototyping results. WG-3 should also be opened to neighboring topics presenting a similar character of innovation. 05/12/2011O. Napoly, TTC Chair19

TTC Jlab Meeting Scientific Program WG4 conveners: ‘Towards cost-effective SRF - in both construction and operation’ Conveners: Hitoshi Hayano (KEK), Joe Preble (JLab), Roland Garoby (CERN) Containing or reducing the cost of SRF technology is a key to its application to large accelerators, and even to small facilities. In the continuity of WG-3 at TTC 2011 in Beijing which discussed potential ways to reduce cryogenic power and cryogenics cost, Working Group n°4 should attempt to review and evaluate ways to moderate the cost of the superconducting RF accelerators, including the RF sources and cryogenics. This includes: a) the fabrication costs of SRF components, in small or large series b) the operation costs of the SC RF accelerating systems c) the potential for energy savings and energy recovery. WG-4 should also be opened to neighboring topics like industrialization, or the impact of pressure vessel directives. 05/12/2011O. Napoly, TTC Chair20

Technical Board Mission According to the MoU of TTC: “the Technical Board TB shall provide advice to the Collaboration on technical activities towards reaching the goals of the Collaboration Mission. To this end, the TB will: compile information on the technology activities in different technical areas, provide findings and recommendations to the CB.” These are very abstract goals. My proposal: the Technical Board attempts 1) to digest the findings, debates and technical needs from the meeting, 2) to highlight the most interesting paths of progress, within the APE triangle, 3) to propose developments or experimental tests to explore these paths. A long term topic suggested from this Meeting on : Clean-room assembly procedures as a key to cryomodule (counter-) performance 05/12/2011O. Napoly, TTC Chair21