Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.

Slides:



Advertisements
Similar presentations
Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
Advertisements

County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Great Western Corridor Feasibility Study
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Environmental Project Commitments The Alberta Experience
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
2014 Emergency Solutions Grant. Project Overview Eligible Projects Application Process Application Review Record Keeping Reporting Requirements Important.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Montgomery County Transit Task Force Meeting August 17, 2011.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Limebank Road Environmental Assessment Study February 19, 2003.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Evaluation and Appraisal Comprehensive Plan Amendments City Council Workshop December 9, 2014.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Convention Center District Property Owners’ Association Long-Range Strategic Plan May 20, 2008.
EVALUATION AND APPRAISAL REPORT OVERVIEW, WORKPLAN & PUBLIC PARTICIPATION PLAN FOR ALACHUA COUNTY Energy Conservation Strategies Commission February 18,
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Environmental Impact Assessment in the Slovak republic.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Burlington Community Energy Plan Update Presentation to Development & Infrastructure Committee Dec. 3, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
North Aldershot Citizen Engagement Process Presentation to Burlington Development and Infrastructure Committee – June 17, 2013 By Eagle Heights Technical.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
Aggregates 101 Grey County Planning Process for Pits and Quarries April 24, 2015 Scott Taylor, MCIP, RPP Senior Planner.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Municipal Class Environmental Assessment
Presented by Kelsey Lang, Planning Associate June 27, 2016
Scenic Highway – Public Meeting
Phillip Island Aquatic Working Group
Comprehensive Planning and Development Strategy
Public Information Centre No. 2
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Value Engineering Study and Risk Assessment
Project Status & Right-of-Way Acquisition
NGTA Halton Planning and Public Works Committee
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Grey County Transportation Master Plan
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
Presentation transcript:

Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012

Background Process and Public Consultation Discussion on Sections of Waterdown Road Next Steps Report Recommendations Outline

Background In June 2002, The Provincial Cabinet approved Official Plan Amendment (OPA) No. 28. This approval brought lands into the Waterdown urban boundary Condition of OPA No.28: Transportation Study be jointly funded and conducted by: the Cities of Hamilton and Burlington

Waterdown /Aldershot Transportation Master Plan: Feb Waterdown/Aldershot Transportation Master Plan completed by Cities of Hamilton and Burlington and Region of Halton Master Plan provided basis for future investigations, specifically Environmental Assessment projects Background

Recommended Transportation Network

Enter Presentation Name Environmental Assessment Study Phases 1 & 2: Phase 1 - June 2005: Additional east-west capacity needed in the overall transportation network in Waterdown North and East / Burlington area (ie: Dundas St to Hwy 6) Additional north-south capacity needed in the overall transportation network in Waterdown/Aldershot/Burlington area Phase 2 - Feb 2008 Phase 2 Report identified series of next steps to implement its recommendations, including undertakings for Phase 3 and 4 of Municipal Class EA process for Schedule C Projects. Recommended Schedule C projects: New East-West Corridor EA (Dundas St to Hwy 6) Waterdown Road Corridor EA Both projects to be completed concurrently Background

The Process and Public Consultation 1.Environmental Assessment Process: Phase 1: Identify Problems Phase 2: Alternative Solutions Document alternative solutions and potential environmental effects, evaluate alternative solutions to problems. Phase 3: Alternative Design Concepts Identify alternative ways to design the project, evaluate and identify preferred design concept Phase 4: EA Documentation Prepare Environmental Study Report (ESR), place ESR on public record for minimum of 30 calendar days for review. Notify public and review agencies of the opportunity to review ESR. 2.Public Information Centres held during Phase 3: June 24th, 2008, Waterdown and June 26th 2008, Aldershot Nov 5th 2008, Waterdown and Nov 6th, 2008, Aldershot

Hamilton Council approved ESR filing February 2010 Burlington Council directed staff to hold additional PIC for Waterdown Road residents – March 2010 Since March 2010: Ministry of Natural Resources requests additional information on species at risk and additional studies (studies undertaken in 2010 – 2011) Conservation Halton requests additional analysis concerning proposed retaining wall at Flatt Road and tree replacement strategy (Geotechnical investigation completed ) Finalization of cost sharing agreement The Process and Public Consultation

Discussion on Sections of Waterdown Road Corridor

Section W1 Location: Waterdown Road, Southern Section Preferred Design: 1.Roadway shifted as far to the West as possible, 4 lanes (3 lanes initially) 2.Installation of a retaining wall is recommended along the East side. Multi-Use Path to the West 3.Reduced design speed of 60 km/h (50 km/h posted) Waterdown Road Cross-Section

Location: Waterdown Road, Mid-section Preferred Design: 1.Follow the existing alignment of road but shift the road further away from the residences on the east side of Waterdown Rd 2.4 lanes (3 lanes initially) with reduced design speed 3.Multi-Use Path to the west and sidewalk on the east side Section W2

Section W3 Location: Waterdown Road, Northern Section Preferred Design: 1.An alignment that basically positions the new road footprint at the centre of the existing road. 2.4 lanes (3 lanes initially) with reduced design speed 3.Multi-Use Pathway to the West. Waterdown Road Cross-Section

Location: Waterdown Road/Mountain Brow road intersection Preferred Design: 1.A conventional intersection (including traffic signals) was selected as preferred alternative. Intersection Section W4

Next Steps Council approval to file Environmental Study Report (ESR) Place the ESR on public record for 45 calendar days for review Notify public and review agencies of the opportunity to review ESR Proceed to Phase 5: Detailed Design and Implementation following approval of phases 3 and 4 of EA o Produce detailed design drawings and public consultation 2013 o Property purchases 2013/2014 o Construction of project 2015/2016 o Monitor for environmental impacts

Approve the draft Environmental Study Report (ESR) dated April 2012 by Dillon Consulting Ltd. documenting the completion of Phase 3 and 4 of the Class Environmental Assessment for the widening of Waterdown Road between the North Service Road and Mountain Brow Road for finalization and public posting. Authorize the Mayor and City Clerk to sign the cost sharing legal agreement between the City of Burlington and the City of Hamilton included as Appendix “A” in report TS Staff Report Recommendations