Coney - CM36 - June 2013 1 Online Overview L. Coney – UCR MICE CM36 – June 2013.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Batch Production and Monte Carlo + CDB work status Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
Computing Needs Panel Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Online Servers and Schedule Paul J Smith. Online Servers Recent Changes: NUCS - > micethins -> there has been some discussion of changing the name – suggest.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
1 Project Management Web Tools at the MICE Experiment Linda R. Coney – UC Riverside CHEP – May 2012.
Software and Computing towards Step IV David Colling With special thanks to Chris Rogers, Chris Tunnell, Linda Coney and Antony Wilson and the rest of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.
1 The MICE Online Systems Linda R. Coney CHEP – May 2012.
1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.
1 Online Summary and MICE Operations Linda R. Coney – UCR CM35 – 16 Feb 2013.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Offline Software Summary 1M.Ellis - CM25 - 6th November 2009  Release Schedule  Simulation and Analysis Update  Detector software: u CKOV u EMR u KL.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MOM Report Victoria Blackmore VC /06/11 1/7.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Online Reconstruction 1M.Ellis - CM th October 2008.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Electronics Spares for StepIV Operations MICE CM39 C.Macwaters 25/6/14.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11,
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
Online Update On behalf of the Online group. Introduction The main categories for the online schedule are based around the following items, so I will.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
Online & Operations Summary Linda R. Coney UCR MICE CM32 – RAL Feb 2012.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE Computing and Software
Status of the MICE Construction Project
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Controls & Monitoring in MICE
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Presentation transcript:

Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013

2Coney - CM36 - June 2013 Also in This Session: Controls & Monitoring – Pierrick Controls & Monitoring – Pierrick Yesterday – Integrated C&M for MICE magnets Yesterday – Integrated C&M for MICE magnets DAQ – Yordan DAQ – Yordan Will leave the specifics to them.. Will leave the specifics to them..

3Coney - CM36 - June 2013 Since CM35 in February Significant events in the 4 months since the last CM: Significant events in the 4 months since the last CM: Activation run was the last data-taking (13 Feb) Activation run was the last data-taking (13 Feb) SS magnets – training/C&M/field measurement at Wang SS magnets – training/C&M/field measurement at Wang State machines, Run Control, improved C&M State machines, Run Control, improved C&M Maui Maui No running – attempts at cosmic ray runs No running – attempts at cosmic ray runs Another power outage – RAL instigated – planned (as opposed to unintentional) Another power outage – RAL instigated – planned (as opposed to unintentional)

4Coney - CM36 - June 2013Running? Activation run Activation run Went well Went well Attempts at cosmic ray runs – did not go smoothly Attempts at cosmic ray runs – did not go smoothly Goal: test new MAUS code in MLCR, test DAQ, test Online Monitoring Goal: test new MAUS code in MLCR, test DAQ, test Online Monitoring Problems with DAQ – no triggers recorded Problems with DAQ – no triggers recorded Suspect due to twitchy NIM crate – known problem (note: NEW crate) Suspect due to twitchy NIM crate – known problem (note: NEW crate) Attempts to test/finish Run Control Attempts to test/finish Run Control Problems with network – micenet Problems with network – micenet Problems with C&M Problems with C&M HV control application – interference between system under development and production system HV control application – interference between system under development and production system Run Control unable to be tested Run Control unable to be tested Evaluation of reliability within Online Systems Evaluation of reliability within Online Systems Develop more robust pre-run procedures for DAQ, C&M, Online Reconstruction Develop more robust pre-run procedures for DAQ, C&M, Online Reconstruction Create development protocol for C&M and DAQ Create development protocol for C&M and DAQ Need higher priority on documentation Need higher priority on documentation More than one person to solve problems – must do better on handover of information More than one person to solve problems – must do better on handover of information

5Coney - CM36 - June 2013Personnel Personnel changes (as of Feb): Personnel changes (as of Feb): New network village manager – Chris Brew (RAL) New network village manager – Chris Brew (RAL) New RAL network liaison – Antony Wilson (RAL) New RAL network liaison – Antony Wilson (RAL) oops..off MICE – need new person oops..off MICE – need new person New DAQ deputy – David Adey (FNAL) New DAQ deputy – David Adey (FNAL) Postdoc running out… Postdoc running out… New Online Monitoring owner – Rhys Gardner (Brunel grad student) – in place, going well.. New Online Monitoring owner – Rhys Gardner (Brunel grad student) – in place, going well.. New C&M deputy – Ian Taylor (Warwick) New C&M deputy – Ian Taylor (Warwick) New head of MICE Computing – Chris Rogers (RAL) New head of MICE Computing – Chris Rogers (RAL)

6Coney - CM36 - June 2013 Power Outage ISIS taking down substation for maintenance ISIS taking down substation for maintenance Indicated would affect MICE control room/rack room Indicated would affect MICE control room/rack room Went well – power down smooth Went well – power down smooth Recovery only minor issues – made use of new power outage recovery document Recovery only minor issues – made use of new power outage recovery document Ian, Henry iterated doc Ian, Henry iterated doc Highlighted benefits of appropriate documentation! Highlighted benefits of appropriate documentation! Although..we didn’t actually lose power. Although..we didn’t actually lose power.

7Coney - CM36 - June 2013 Overall Online Completed Completed Installation of new Online Reconstruction machines Installation of new Online Reconstruction machines Installation/configuration/use of new iocpc1 machine (for C&M) Installation/configuration/use of new iocpc1 machine (for C&M) Computing monitoring information now in Alarm Handler Computing monitoring information now in Alarm Handler Extra space added to bastions Extra space added to bastions EMR equipment implemented in DATE EMR equipment implemented in DATE In progress In progress Finalize monitoring of new UPS units (reliability/stability) – 98% done Finalize monitoring of new UPS units (reliability/stability) – 98% done Master server installation – 90% done Master server installation – 90% done Restriction of external access to micenet Restriction of external access to micenet Resurrection of Online Monitoring Resurrection of Online Monitoring Progress on online reconstruction software – fixing bugs, completing Alex Richards’ work Progress on online reconstruction software – fixing bugs, completing Alex Richards’ work Reviews of systems/code in progress across computing/software Reviews of systems/code in progress across computing/software

8Coney - CM36 - June 2013 Online Monitoring Has been brought back to life! Has been brought back to life! Rhys Gardener (Brunel grad student) Rhys Gardener (Brunel grad student) Code working again – fixed bugs, improved GUI Code working again – fixed bugs, improved GUI Installed on Onrec02 Installed on Onrec02 Needs cosmic test Needs cosmic test

9Coney - CM36 - June 2013 Overall Online 2 The link between Online Group, Software Group, and overall Computing has been strengthened The link between Online Group, Software Group, and overall Computing has been strengthened Chris Rogers now head of MICE Computing Chris Rogers now head of MICE Computing Developing comprehensive understanding of all computing services/hardware/systems/links Developing comprehensive understanding of all computing services/hardware/systems/links

10Coney - CM36 - June 2013 By June CM36… Finish SS2 and SS1 Finish SS2 and SS1 fully developed C&M fully developed C&M SS state machine completed SS state machine completed Finish FC – move to Hall Finish FC – move to Hall Documentation – needs higher priority Documentation – needs higher priority Improve stability & reliability Improve stability & reliability Complete installation of iocpc1 Complete installation of iocpc1 Complete computer monitoring Complete computer monitoring Stabilize C&M applications Stabilize C&M applications Formalize development vs production C&M Formalize development vs production C&M Create comprehensive pre-run test plan for DAQ and C&M Create comprehensive pre-run test plan for DAQ and C&M Simplify Production version Run Control Better limits w/in Alarm Handler Automate datamover Improve functionality Incorporate EMR into DAQ Beam test EMR Bring back Online Monitoring EMR online plots Online analysis prototype New C&M deputy.

11Coney - CM36 - June 2013 Then….MICE Step IV Both Spectrometer Solenoids – both Trackers – one FC and an Absorber module.. Both Spectrometer Solenoids – both Trackers – one FC and an Absorber module.. Requires robust Online systems – DAQ, C&M, Online Reco & Analysis, Infrastructure Requires robust Online systems – DAQ, C&M, Online Reco & Analysis, Infrastructure

12Coney - CM36 - June 2013