Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.

Slides:



Advertisements
Similar presentations
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Advertisements

0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Overview of WECC and Regulatory Structure
Generation Adequacy Task Force Update to WMS September 14, 2011.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Integration of Variable Generation Task Force (IVGTF) Mark Lauby Manager, Reliability Assessments
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
February 20, 2006 Nodal Architecture Overview Jeyant Tamby 20 Feb 2006.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PMO Update to RMS Troy Anderson Program Management Office December 7, 2005.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
August 2, 2007 TAC Credit Workgroup Update Morgan Davies Vanessa Spells.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
1 Meredith Younghein Energy Division Local RA Requirements for Demand Response Resources: Staff Proposal.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CPUC Supply-side Procurement Processes
Transmission Planning in ERCOT- Overview
ITIL SERVICE LIFECYCLE
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Overview of New Control Room Desk
Reliability Assessment Committee Proposal TSS Meeting
Natural Gas Infrastructure Assessment
Affordable Energy Production from Renewable Fuel
Reliability Assessment Committee Reliability Workshop Priorities
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Integration of Variable Generation Task Force (IVGTF)
Nada Al Dosary Edited By: Maysoon AlDuwais
Integration of Variable Generation Task Force (IVGTF): Status
Sandip Sharma ERCOT Manager, Operations Planning
Integration of Variable Generation Task Force (IVGTF)
Reliability Assessment Committee Reliability Workshop Priorities
Eric Baran, WIRAB Staff April 30, 2018
Presentation transcript:

Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements

Background LTS Certain scenarios studied as part of the LTS suggest the potential for dramatic changes to the future ERCOT resource mix. A complete evaluation of increasing proportions of non- traditional resources must consider the operational needs of the system to maintain adequate reliability. ERCOT is finalizing a Request for Proposal to procure one or more tools to determine the adequacy of a potential future resource mix to meet operational reliability requirements.

Divergent Resource Mixes by Scenario Future scenarios will include different mixes of resources –Some with specific availability profiles –With unique ramping capabilities –Each scenario must provide sufficient operator control to maintain adequate grid reliability LTS

Proposal Requirements ERCOT is seeking new tools to ensure that potential sets of resources can provide sufficient flexibility to meet the operational requirements to maintain grid reliability. ERCOT is open to considering a variety of potential solutions. However, the tool(s) must: –Allow the user to test scenarios with resource portfolios composed of increasing amounts of variable generation, energy storage devices, and demand side resources –Quantify the overall capability of the resources in each scenario to meet the reliability needs of grid operations –Quantify system needs and resource capabilities independent of the current set of ancillary service products LTSNovember 18 th, 2011

Characteristics of a Reliable System LTS Maintain System Frequency in accordance with current NERC standards Adequately control for risks due to unforeseen future occurrences Example: system resources must provide for timely replacement of lost resources due to unit outages or unit variability

Schedule Present concept to LTSF, DSWG, ETWG, and other stakeholders Finalize RFP document with stakeholder feedback by end of January, 2012 Post RFP on ERCOT.com Review proposals / select proposals LTSNovember 18 th, 2011