Lécorché Eric, Epics meeting, 15/10/2008 1 Setting up the building blocks for the future Spiral2 control system.

Slides:



Advertisements
Similar presentations
Dicembre 2009SPES Control System Group Acquisition using VME boards Conforto Nicola.
Advertisements

Eric Lécorché/ Epics meeting 21/10/ Setting the Spiral2 control system for the on-going commissioning.
Status of the LANSCE Upgrade LA-UR Eric Bjorklund.
Paul Chu FRIB Controls Group Leader (Acting)
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Report from the Spiral2 control system development
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Stanford Linear Accelerator Center Next Linear Collider Test Accelerator EPICS Support S. Allison, R. Chestnut, M. Clausen, K. Luchini.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
SNS Integrated Control System EPICS IOCs – Relational DB Connectivity Bridge A. Liyu, A. Zhukov.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
CODAC Core System, 2-June-2010, EPICS Collaboration Meeting Aix-en-Provence Page 1 CODAC Core System F. Di Maio ITER IO / CHD / CIT / CODAC.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
New Nuclotron Beam Intensity Monitoring Subsystem V. Andreev, A. Butenko, A. Kirichenko, S. Romanov, G. Trubnikov, V. Volkov Veksler and Baldin Laboratory.
IRFU COLLABORATION IN SPIRAL2 & LIPAC CONTROL SYSTEMS Françoise Gougnaud On behalf of D. Bogard, J-F. Denis, A. Gomes, J-F. Gournay (now retired), Y. Lussignol.
IRMIS 2 Overview Andrew Johnson Computer Scientist, AES Controls.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
CEA DSM Irfu Spiral2 Injector diagnostics acquisition based on new hardware Françoise Gougnaud CEA Saclay IRFU - Françoise Gougnaud– Spiral2 Injector Diagnostics.
Beam diagnostics in the beamlines
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Fast Fault Finder A Machine Protection Component.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Connecting EPICS with Easily Reconfigurable I/O Hardware EPICS Collaboration Meeting Fall 2011.
IFMIF/EVEDA Control System Basis J.F. Gournay CEA Saclay – Irfu/SIS.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
CEA DSM Irfu - Pierre MATTEI SIS / LDISC -19/07/ Communication between EPICS and PLCs.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
TRIUMF HLA Development High Level Applications Perform tasks of accelerator and beam control at control- room level, directly interfacing with operators.
Control System Overview J. Frederick Bartlett Fermilab June 1,1999.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
An Introduction to Epics/Tango Steve Hunt Alceli EPICS Meeting 2008 INFN Legnaro 15 Oct 17:15.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Current Status of Web Application for RIBF Accelerator
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
LCLS Commissioning & Operations High Level Software
MicroTCA Development and Status
ILC LLRF Status Ruben Carcagno, Brian Chase
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LCLS Commissioning & Operations High Level Software
Status of Fast Controller EPICS Supports for ITER Project
EPICS IOCs – Relational DB
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Presentation transcript:

Lécorché Eric, Epics meeting, 15/10/ Setting up the building blocks for the future Spiral2 control system

Lécorché Eric, Epics meeting, 15/10/ Outline  The Spiral2 project Objectives Machine layout Planning  Control system design Collaboration for the accelerator control system Use of Epics Main options  Work in progress Common hardware and software platform Emittance measurement tests Equipment interfaces (PLCs, power supplies, beam profilers …) Investigation for a triggered data acquisition  Pending issues Hardware interface (motors, diagnostics …) High level applications Database management

Lécorché Eric, Epics meeting, 15/10/ fissions/s Intermediate step between existing RIB facilities, and future projects like EURISOL or RIA. Spiral2 principle

Lécorché Eric, Epics meeting, 15/10/ Project overview Deuteron source Ion source q/A=1/3 RFQ Superconducting Linac RIB production station Converter-target-ion source Mass separator Charge breeder Transfer line to CIME Stable ion beams Experimental area New (Spiral2) Low Energy RIB cave Spiral1 RIB production Existing GANIL experimental area Existing GANIL accelerator facility Existing CIME cyclotron Existing Ganil : "Ganiciel" Ada based home made control system Spiral2 Accelerator Spiral2 RIB production under definition

Lécorché Eric, Epics meeting, 15/10/ Collaboration for the CC driver HEBT BTI Linac, HEBT & AEL CNRS-LPSC tests (Grenoble) CEA-IRFU tests (Saclay) Injector Ganil commissionning (Caen)

Lécorché Eric, Epics meeting, 15/10/ Common architecture  Epics  Linux IOCs Red Hat Enterprise RHEL 5.2 PCs  VME IOCs VxWorks 6.5 (Workbench 2.6) CPU Motorola MVME 5500 (PPC 1 GHz, 512 Mo) BSP Standard I/Os (Epics CEA-IRFU drivers) ADC : Adas ICV channels*16 bits DAC : Adas ICV channels*12 bits Binary : Adas ICV inputs (TTL) / outputs (Open Collector)  Software available from a server (CC IN2P3 Lyon)

Lécorché Eric, Epics meeting, 15/10/ Equipment interfaces Power suppliesModbus/TCP (University of Chicago driver) RF amplifiersModbus/RTU (Cometh gateway Modbus/TCP) LLRFSpecific Epics drivers to be developed (CEA-Irfu VME64x FPGA board) Timing systemTo be defined Cavity tuningTo be defined RFQ : water cooling Rebunchers & cavities :motors Interlocks / Siemens S7 PLCs (To be confirmed) s7plc (PSI driver) or Modbus/TCP ? Beam slits with temperature measurement Modbus/RTU (gateway Modbus/TCP) for Ganil stepper motors ADC Adas ICV 150 Faraday cups (To be confirmed) ADC Adas ICV 150 binary Adas ICV I/Os Triggered acquisition ADC Adas ICV 108/178 ? Emittance measurement (To be confirmed) OMS MaxV motor control board ISEG VHQ202M HV board DAC Adas ICV 714 binary Adas ICV I/Os Triggered acquisition ADC Adas ICV 108/178 ?

Lécorché Eric, Epics meeting, 15/10/ Equipment interfaces (continued) DCCT (PCT Bergoz system) (To be confirmed) ADC Adas ICV *16 bits binary Adas ICV I/Os Triggered acquisition ADC Adas ICV 108/178 ? BPMsTo be defined Beam profilers (To be confirmed) Ganil STP/GAE & STP/GAP development Modbus/TCP link Beam loss monitorsTo be defined TOF measurementTo be defined Fast Faraday cupTo be defined ACCTTo be defined

Lécorché Eric, Epics meeting, 15/10/ Power supply preliminary tests (Modbus/TCP) EDM screen test Database design Modbus inputs Channel Access inputs Modbus outputs Channel Access outputs Gensub records

Lécorché Eric, Epics meeting, 15/10/ Investigation for a triggered acquisition  Beam modes Usually continuous Pulsed for tuning 1 Hz)  Acquisition of Beam intensity Faraday cups DCCT Transverse emittance  VME board specifications 16 bits acquisition, 50KHz bandwidth From 200 kSample/s up to 1MSample/s  Evaluation just started for an Adas ICV 108 / ICV 178 set In test Epics driver to be written

Lécorché Eric, Epics meeting, 15/10/ Emittance measurement tests EDM screen for tests Java application Emittance display

Lécorché Eric, Epics meeting, 15/10/ Standardisation of PLC communication  Siemens S7 PLCS (LEBT1) Beam Interlocks Vacuum ECR sources  s7plc protocol tested in 2007 In use for the beam emittance measurement test bench Needs to write data by blocks  Use of Modbus/TCP Tested with one client Needs to implement a Modbus/TCP server on the PLC Specific implementation ? Each client must communicate with the server on a dedicated port number Or to configure an IOC to be a PLC Modbus/TCP gateway ?

Lécorché Eric, Epics meeting, 15/10/ GUIs  Standard Epics tools EDM, StripTool, Probe … CSS ?  LabView interfaces Use of the Epics gateway (EpicstoLabview.dll, Ca.dll)  High level applications Java programming Eclipse IDE Specifications in progress Link with the TraceWin CEA-Saclay simulation code Design Home made XAL based ? TraceWin code

Lécorché Eric, Epics meeting, 15/10/ XAL evaluation Ganil modifications

Lécorché Eric, Epics meeting, 15/10/ Test to add a specific class

Lécorché Eric, Epics meeting, 15/10/ Use of a derived XAL framework

Lécorché Eric, Epics meeting, 15/10/ Adaptation of an existing XAL application XAL Magnet_Cycling application Ganil derived one

Lécorché Eric, Epics meeting, 15/10/ Evaluation for an other Alarm Epics manager ?  To provide a common alarm manager both for the existing Ganil machine and the future Spiral2 facility  Java / log4j based (+log4Ada)

Lécorché Eric, Epics meeting, 15/10/ Beside Irmis : Epics database configuration ?  Epics Ascii "database " files  Epics IOCs VDCT Visual Database Configuration Tool Any Text Editor Standard way to generate Epics "databases" Needs to be "Epics aware" ! Able to used by any equipment user Relational database (Ingres, Oracle, MySql ) Template files Home made database user interface Configuration procedures Feasible within our environment ?

Lécorché Eric, Epics meeting, 15/10/ RIB control system  The N+ beam line should be seen as part of the existing Ganil facility  Legacy “Ganiciel“ control system coupling ? Up to which level ?  Specific requirements Specific beam diagnostics ? Identification systems (1+ & N+ beams) Radioactive beam control  Interconnexion validation (Ganiciel/Ada  ) EasyCA  CA Ada Multitasking

Lécorché Eric, Epics meeting, 15/10/ Thanks and acknowledgments to P. Gillette, C. Haquin, D. Touchard and the Ganil SdA/GIM group, Ganil STP/GAE and STP/GAP groups (Ganil, Caen) J.F. Denis, F. Gougnaud, J.F. Gournay, Y. Lussignol, P. Mattei (CEA-IRFU/SIS/LDII, Saclay) P. Graehling, J. Hosselet, C. Maazouzi, C. Olivetto (CNRS-IPHC, Strasbourg) See also posters at Preliminary implementations for the new Spiral2 project control system ( E. Lécorché et al.) Power supply interface for the new Spiral2 project control system (D. Touchard, C. Haquin)