GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.

Slides:



Advertisements
Similar presentations
GLAST LAT Projecttitle - MRB 10 Mar 2005 R. BAGAGLI 1 MECHANICAL TESTS MISSING ON SIDEWALL –Y, SN 004 MRB Meeting – 10 March 2005.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
November 17, 2004Tracker1 Tracker MRB Wire Bond Encapsulation from MCM to SSD R.P. Johnson U.C. Santa Cruz.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Performance of SPIROC chips in SKIROC mode
GLAST Large Area Telescope:
FPIX_flip_chip_test module calibration tests November 14 th 2012.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico1 from ANNEX 02 to NCR/FM/INFN/RM2/ cm/tile 4.24 m/layer.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
The fault occurred at the level of 400V-500V. Investigation of the fault to ground at the RCS.A34B2 circuit Between 3 and 12 September, 2014 we carried.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
Procedure for MCM rework on tray MID 070
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
Preproduction Status & Results
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
Hybrid & Module Testing Status
Presentation transcript:

GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005

GLAST LAT ProjectMRB 09/14/2005 L. Latronico2 Description and reference documentation Description of nonconformance –Almost the entire ladder3 in layer Y0, tower 14 appear dead to charge injection and noisy when random triggered, with the exception of a small nb of channels (~15) that appear completely dead and a small nb of channels (~20) that appear disconnected –The failure is temperature dependent and disappears at temperature < 25C –A sharp current drop is observed when the failure disappears at low T; the drop corresponds to the current expected from a shorted ladder –The number of disconnected channels increases with time and temperature cycles Suspected Root cause –HV short induced by signal wire-bonds in contact with the silicon ladder edge; such contacts are likely to be due to ladder movements induced by an air-bubble underneath the ladder Reference NCR List –NCR 572 –NCR 430: similar failure on twr1-x16, eventually fixed by replacing anomalous tray –NCR 449: investigations performed on MID063 removed from twr1 show similar conclusions

GLAST LAT ProjectMRB 09/14/2005 L. Latronico3 Noise anomalies observations Charge injection at hot soak Random triggers at hot soak Consistent with: the ladder is lifted in vacuum and channels at the ladder right edge (~1500 and higher) are partly in contact with the silicon (white lines on bottom left plot), partly disconnected from the MCM (rainbow lines); the channels in contact cause a short on the HV line that is responsible for the behavior of most channels (purple lines) Noise level at T<25C

GLAST LAT ProjectMRB 09/14/2005 L. Latronico4 Noise anomalies trends The failure disappears at T < 25C The number of disconnected channels increases with thermal cycles

GLAST LAT ProjectMRB 09/14/2005 L. Latronico5 Leakage Current observations ~ 0.71 mA ~ 0.36 mA  I = 0.35 mA ~ 100V/270Kohm The current drop when the failure disappear corresponds to the current expected from a shorted ladder

GLAST LAT ProjectMRB 09/14/2005 L. Latronico6 Possible Corrective actions Constraints: –The last TVAC window is scheduled for september 26/29 for tower 8 retest and another tower –We only have one bottom tray available by that date Corrective action 1 (preferred) –Assemble tower 15 and test it with tower 8 –Rework tower 14 bottom tray (see below), do not repeat environmental tests but still consider it as a flight tower after successful functional test Pros: –We would have 2 flight towers for completion of the LAT and a spare for tower A replacement Cons: –Tower 14 would not be env-retested. We could provide a vacuum test and a thermal test for the new bottom tray before installation –Tower 15 C5 is missing and there are no projections on delivery – we might consider getting the missing cable from tower 14 Tower 14 rework: –Tower 14 has solithane –after inspection of bottom tray we could either remove the broken bonds or replace the tray –A new bottom tray would be available not sooner than days Corrective action 2 (not preferred) –Replace tower 14 bottom tray and test it with tower 8 Pros: –We would fix the anomaly Cons: –We could not perform environmental tests on tower 15 and would loose a spare flight tower (tower A replacement)