GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.

Slides:



Advertisements
Similar presentations
Preshower 15/03/2005 P.Kokkas Preshower September Run Data Analysis P. Kokkas.
Advertisements

Standalone VeloPix Simulation Jianchun Wang 4/30/10.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT Project Calibration & Analysis Meeting - August 29, 2005 Benoît Lott Gamma-ray Large Area Space Telescope Response of the GLAST LAT Calorimeter.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
A.Chekhtman1 GLAST LAT ProjectCAL Recon rewriting meeting, May, 11, 2005 In what cases we need external position estimation ? Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
Patrick Spradlin, SCIPP trip to LLU, May 2, 2001 Detector Characteristics.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
1 ACD studies: 1. Light Yield Determination for top ACD Tiles 2. Looking for holes (screws) in the ACD data Instrument Analysis Workshop VI Luis C. Reyes.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
06/02/2006 M.Razzano - DC II Closeout Meeting Pulsars in DC2 preliminary results from an “optimized” analysis Gamma-ray Large Area Space Telescope Massimiliano.
MAMMA data analysis Marco Villa – CERN 3 rd May 2011.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Pixel Results from CRAFT09 U. Langenegger (PSI), G. Giurgiu (JHU) Pixel General Meeting November 10, 2009.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
June 4, 2009 STAR TPC review Estimation of TPC Aging Based on dE/dx Measurements Yuri Fisyak.
gamma ray polarisation measurement
Mini-Tower test results
Tracking System at CERN 06 and 07 test beams
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
Single-CAL Test and Calibration
UW “Source Detection” Status
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
TKR to CAL for 16 Towers The usual TKR extrapolation to CAL study, for the 16 tower data. Check calibrations, look for problems, etc. Today -- “work in.
GLAST Large Area Telescope:
Mini Tower Preliminary Results
GLAST Large Area Telescope:
GLAST Large Area Telescope
Studies of the Time over Threshold
SVAC Configuration Verification
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro Tajima (SLAC) Johann Cohen-Tanugi (SLAC) TKR Gamma-ray Large Area Space Telescope

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 2 OUTLINE End-toEnd TOT Calibrations –Summary of TOT calibration sequence. –Charge scale distribution for 8-tower data –Comparison between MC and data. TOT distribution Angle dependence of TOT peak Efficiency trending.

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 3 End-to-End TOT Calibration Summary TACK timing. –done. GTFE charge injection scale. –done. GTFE Threshold. –done. TOT gain parameter. –Correct thresholds were not used due to a bug in the TKR script Fixed before 8-tower tests. – Column and row number were swapped due to a bug in LATTE tower mapping. Fixed before 8-tower tests. TKR recon. –Wrong scale was used for “charge per MIP” parameter.

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 4 Charge Scale after TOT Calibrations Definition of charge scale. –Plot ratio 4.92/peak. (4.92 fC is expected for MIP) (should be 1.0 if calibration is correctly applied.) Before charge scale calibration 6-tower data (after charge scale calibration) Wrong “fC per MIP” parameter 8-tower data (after fixes) Tower row and column Numbers swapped for TOT gain parameter Johann

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 5 Data/MC Comparison: TOT Distribution Fit parameters for data and MC are very similar –Gaussian convolved Landau distribution function –Peak at 4.91 : 4.92 fC –Landau width at : –Gaussian sigma at 0.69 : 0.69 TOT charge (fC) MC Data TOT charge (fC) Johann

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 6 Angle Dependence of TOT Peak Incident angle dependence of TOT peak. MC before angle correction: 10% effect MC after angle correction: <1% effect cos  TOT peak (fC) MC cos  8-tower data after angle correction: ~1% residual effect DATA Johann

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 7 Tower Efficiency Trending Trend tower efficiency during I&T phase –All I&T data sets are analyzed by the latest TkrRecon. –FMB and FM1 shows consistent (but tiny) downward trend. 0.06% inefficiency corresponds to ONE strip. Johann

GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 8 Conclusions Calibration procedure for TOT/threshold/charge scale is demonstrated end-to-end. –Improvement can be made for angle dependence of TOT peak in data. –TOT distributions in data and MC are very similar. Started tower efficiency trending. –No major drop of efficiency observed. –Tiny and consistent downward trend in FMB and FM1. Plan to trend more parameters. –# of bad channels, thresholds, TOT parameters…