Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.

Slides:



Advertisements
Similar presentations
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
SRF DEVELOPMENT AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory 2 nd PASI Workshop, RAL 3 rd – 5 th April 2013.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
SRF Linac Development for Indian Energy Program
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
RF-Dipole Cavity: Processing and RF Measurements Procedure
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Development of SCRF Infrastructure at RRCAT Satish Chandra Joshi Proton Linac & Superconducting Cavity Division Raja Ramanna Centre for Advanced Technology,
Satish Chandra Joshi Raja Ramanna Centre for Advanced Technology, Indore, India Presentation in Web Meeting with Fermilab April 20, 2009.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.
Development of Infrastructure Facilities for Superconducting RF Cavity Fabrication, Processing and 2 K Characterization at RRCAT Satish Chandra Joshi,
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
26 October 2010IIFC meeting, RRCAT Indian Institutions and Fermilab Collaboration Activities at IUAC Presented by D. Kanjilal Inter-University Accelerator.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
at STFC Daresbury laboratory
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Progress and Issues with VTS Upgrade
FCC R&D WP5 Cavity Fabrication Status May 2017 M
ELLIPTICAL SCRF CAVITIES
HWR Cavities for China ADS
Recent SCRF Activities in IHEP
Progress in Asia Hitoshi Hayano,KEK,
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
HIE-LINAC status report
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
HWR and Test Cryomodule for China ADS
Presentation transcript:

Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India

Outline Prototype 1.3 GHz single Cell cavity Single cell Nb 1.3 GHz cavity development Development of Cavity Processing Facility Design of Cryomodule (1.3 GHz & 650 MHz)

SCRF Cavity Development 1.3 GHz Single cell cavity –Two 1.3 GHz Single cell cavities in Aluminum & Copper was fabricated with Indian Industry. –Two 1.3 GHz Single cell Niobium cavities fabricated in collaboration with IUAC, New Delhi. –Two Nb cavities have been processed & tested at 2 K at FNAL. E acc 21 & 23 MV/m, Q >2E10 –Two more (improved) 1.3 GHz Single cell in Niobium have been taken up. 1.3 GHz Multicell Cavity –Five cell cavity with simple beam pipe using EBW facility at IUAC is being made.

4 Development of 1.3 GHz SRF cavity forming and machining of half cells Formed Niobium Half cellInspection FormingMachiningLong End Half Cell Tooling Improvement - rubber pad forming tooling completed

5 1.3 GHz Prototype Single cell Aluminum cavity with industry  Our technology development efforts started with Aluminum prototype cavities  This has helped us to  Develop cavity manufacturing process  Test & qualify the welding fixtures  Understand various mechanical & RF qualification procedure  Aluminum cavities are now becoming potential candidate for thin film deposition R&D EBW Machine : 6 KW, 60 kV, 450 x 450 x 500 mm chamber size, Vacuum < 5 x 10e-05 m-bar M/s Laxmi Technology & Engineering Industry Coimbtour Single cell cavity welding setup Prototype Aluminum cavities

Standard End Group progress Components for end half cell assembly ( End Group) in Aluminium and side branching for ports

Long & Short End Group in Aluminum Long – End GroupShort – End Group

Fabrication of 1.3 GHz Nb Cavity Setting for equator welding 1 st prototype 1.3 GHz Single cell cavity with RRCAT and IUAC team Ultrasonic Cleaning Pre-weld etching EBW 15 KW, 60 kV-250 mA, chamber size, 2.5 x 1 x 1 m

Niobium cellTotal length (mm) (392 ±1) Parallelism (mm) Shrinkage equator (mm) Frequency (MHz) 300K Quality factor 300 K Cell ID # Nb Nb- 127 TE1CAT Cell ID# Nb Nb-139 TE1CAT Dimensional measurement Inspection & testing Frequency measurement 9 The cavities underwent various testing as part of pre-dispatch qualification

Vacuum leak testing & RF measurement Leak testing of Single cell cavity at 300 K 10 Leak testing of Single cell cavity at 77 K Cavity No. Vacuum leak rate (mbar l/s) Measured RF Frequency (MHz) At room temp. At 77 K At room temp (Vacuum) At 77 K TE1CAT001< 1 X TE1CAT002< 1 X Temperature300 K77K2K Frequency MHz Estimated frequency

Indian SC Cavity inspection & processing at FNAL High Pressure Rinsing Electro-polishing RF Measurement Optical Inspection 11 Both the prototype cavities underwent a series of incoming inspection at FNAL –Visual Inspection –Internal optical inspection – RF testing Processing –1 st set of processing Bulk EP ~ 120 µm HPR 85 bar for 6 hrs Clean room assembly Low temperature backing 120 C - 48 hrs

12 Cavity assembly in to VTS for 2 K testing Cavity connection vacuum & RF Lowering in to Dewar Mounted on the VTS Low temp bake 120 C - 48 Hrs

Q vs Eacc plot of second test on Indian SCRF Cavity TE1CAT002 Dec, 2010 (E acc ) of 23 MV/m at quality factor (Q) > 1.5E10 2 K Test results 1.3 GHz Single cell Prototype cavities

GHz Single cell R&D Various prototype 1.3 GHz Single cell cavities developed at RRCAT

Development of beta=0.9, 650 MHz Cavity 650 MHz  =0.9 Single cell cavity Design & fabrication of tooling Fixtures for trim machining & EBW under progress 650 MHz  =0.9 Five cell cavity Design is under process Processing of cavity is under discussion with FNAL

Forming of 650 MHz, beta=0.9 SRF cavity half cells – October 2010  Design of prototype forming dies, in-house manufacturing, CMM Inspection and forming trials in aluminum were performed.  Problem of buckling of cavity side walls was experienced and profile inspection done.  Forming done using 3.7 mm thick sheet and forming with 4.0 mm under progress.  Profile improvement in progress. One set of forming tooling with further improvements under fabrication in industry. 650 MHz cavity forming dies Buckling of cavity cell side walls during first trials

Improved forming results MHz – March 2011: work is continuing Inner viewOuter view Profile result (thickness of the blank used at this stage was 3.7 mm hence larger deviation is seen) CMM Inspection

New Facilities Planned at RRCAT SCRF cavity fabrication Facilities: 120 Ton Hydraulic Press, Nb machining, EBW Machine etc. Chemical & thermal processing facilities EP/BCP/CBP, HPR & Annealing Furnaces etc., Materials Characterization Facilities surface conductivity measurement, high field magnetometer, SIMS Cavity Inspection Facilities 3-D CMM, UTM, Optical inspection bench, 3-D confocal microscope, Cavity RF Measurement & Tuning Facility Half Cell, dumbell and multi-cell cavity frequency measurement Cavity Frequency & field tuning machine Assembly & testing set up. Clean-room, 2K Test cryostats, RF sources etc.

Cryomodule for 650MHz SCRF Cavity Being designed at RRCAT under IIFC Cryomodule for 650MHz SCRF Cavity Being designed at RRCAT under IIFC Cavities : Eight Cavities of 650MHz Diameter : meters Length : 12 meters Cavities : Eight Cavities of 650MHz Diameter : meters Length : 12 meters P. Khare, P.K.Kush, S. Gilankar, R. Ghosh, A Laxminarayanan, R.Chaube and A. Jain RRCAT Tom Peterson,Yuri Orlov, Camille Ginsburg, Jim Kerby, Fermi Lab P. Khare, P.K.Kush, S. Gilankar, R. Ghosh, A Laxminarayanan, R.Chaube and A. Jain RRCAT Tom Peterson,Yuri Orlov, Camille Ginsburg, Jim Kerby, Fermi Lab

TESLA DESIGN Lattice finalization, Instrumentation, Interconnect region, Cryogen distribution scheme etc., Engineering Design of Cryomodule. e.g Cavity support system, thermal shield, vacuum vessel etc. AT RRCAT AT FERMILAB PROTOTYPE CRYOMODU LE WEBEX meeting for technical reviews Cryomodule Development Approach

21 Design of Beta=0.8 Cryomodule β = 0.8 CRYOMODULE RRCAT - FNAL  Effort Started In 2008 to Design Beta=0.8 cryomodule for 1.3GHz cavities  Vacuum Vessel engineering Design note prepared  Cavity support system analysis was completed,3-D Model was completed. In March 2010,Project-X decided to go for 650MHz CW cavities  Thermal load 250W/cryomodule. Tesla type 10W at 2K.  Size of cavity (dia.400mm) : ~ 2 times that of 1.3GHzTesla type cavity.  Stand alone cryomodule for ease of accessibility for repairs. In March 2010,Project-X decided to go for 650MHz CW cavities  Thermal load 250W/cryomodule. Tesla type 10W at 2K.  Size of cavity (dia.400mm) : ~ 2 times that of 1.3GHzTesla type cavity.  Stand alone cryomodule for ease of accessibility for repairs.

Operating frequency650MHz βGβG 0.9 Cavity length (from iris to iris)1038mm Cavity diameter400.6mm R/Q638Ω G-factor255Ω Max. gain per cavity (zero synch. phase) 19.9MeV Gradient19.2MeV/m Maximal surface electric field38.4MV/m Maximal surface magnetic field72mT 650MHz Beta = 0.9 Cryomodule Element Center Position relative to 1st element (mm) Effective Length (mm) 1Cavity Cavity Cavity Cavity Quadrupole Quadrupole Cavity Cavity Cavity Cavity A. CAVITY PARAMETERS B. CRYOMODULE ELEMENT LOCATION Design of Beta=0.9, 650MHz Cryomodule Data received from FNAL, June 2010

Option A- Single Pipe support Configuration of 650 MHz Cryomodule (Options proposed by RRCAT) Option B- Support on two pipes Option C- Rectangular Duct support Possible Options & their evaluation Goal : Use Popular T4CM Cryomodule design as basic concept Possible Options & their evaluation Goal : Use Popular T4CM Cryomodule design as basic concept Evaluation Based on:  Static heat leaks (approximations)  Stiffness of the cavity support system  Availability of pipes  General Mech. Engineering issues Evaluation Based on:  Static heat leaks (approximations)  Stiffness of the cavity support system  Availability of pipes  General Mech. Engineering issues Option Chosen for Detailed Analysis

92.80W 2.45W 1.53W Glimpses of Design Effort GHe 300 K Vacuum Vessel 80 K Thermal Shield + Support Post 5 K Support Post 2 K Cold Mass Thermal Radiation Res. Gas Conduction Support Post Conduction Support Post Conduction Thermal Radiation Res. Gas Conduction Support Post Conduction 2K He 63.33W29.18W4.26W 2.56W 0.40W0.11W1.03W Thermal Flow without 5 K Shield Thermal Shield Analysis Temperature plot after 4.16 hours(15000Sec) Temperature plot after hours(80000Sec)

3-D Model of Subsystems Of Cryomodule SCRF CAVITY HELIUM VESSEL CAVITY SUPORT SYSTEM UNDER PROTOTYPING AT RRCAT VACUUM VESSEL THERMAL SHIELD CRYOGENIC SUPPORT POST 3-D Model developed at RRCAT for Project X Cryomodule