The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.1 The AGILE Mission “415 days ahead of GLAST” Dr. Luca Salotti – Mission Director.

Slides:



Advertisements
Similar presentations
G.Barbiellini -- 1 AGILE 1yr G. Barbiellini on behalf of the AGILE team.
Advertisements

Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Space Engineering I – Part I
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Operation Status of MAXI and ISS M.Kohama,H.Tomida,S.Ueno,Y.Adachi,H.Itamoto,M.Ishikawa,K.Kawasaki(JAXA), T.Mihara,M.Sugizaki,M.Serino,M.Matsuoka(RIKEN),H.
Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Model Validation. -Air lock caused flow restriction, elevated temperatures -Excess energy lost to boiling and higher temperatures -Underperformed model.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
“Galileo Galilei” (GG) GG Phase A-2 Study funded by ASI ongoing at TAS-I (TO) with support from GG/GGG scientists GG target: test the Equivalence Principle.
Spacecraft Launch Vehicles
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Miss Battaglia AP Calculus Related rate problems involve finding the ________ at which some variable changes. rate.
DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries.
Dynamic Design: Launch and Propulsion Genesis Launch Vehicle: The Delta Rocket Student Text Supplement.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Miss Battaglia AP Calculus Related rate problems involve finding the ________ at which some variable changes. rate.
A Brief Introduction to Astrodynamics
Space Station Will it be accessible for You and Me?
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
SDCG-4, Pasadena, CA/USA September 4-6, 2013 SDS-4 Session 2 Mission updates CBERS-3 INPE – CRESDA.
5th Science AGILE Workshop – ESRIN, Frascati, June The AGILE Instrument functional performance A. Argan, A. Trois (on behalf of the AGILE.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #30 Gateway To Space ASEN / ASTR 2500 Class #30 T+12.
Goddard Space Flight Center High Earth Orbit GPS Flight Experiment AMSAT-OSCAR 40 (AO-40) Frank H. Bauer NASA Goddard Space Flight Center November 1, 2001.
What Makes Up the Space Shuttle? The space shuttle is the most complex machine ever created by human beings. The first shuttle was launched on April 12,
Sea Launch/Zenit Thrust: 8,180,000 N Fueled Weight: 450,000 kg Payload to LEO: 13,740 kg Cost per launch: $100,000,000 Cost per kg: $7,300 Launches: 31/28.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
TRACKING OF PHOBOS-GRUNT MISSION IN LOW EARTH ORBIT Alexander S. Samotokhin, Andrey G. Tuchin M.V. Keldysh Institute of Applied Mathematics of Russian.
ICESat Mission By Berhan Amare Period: 5 Date: Nov. 28, 2006.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The County High School, Leftwich Year 10 Information Evening.
Updated information on high altitude HAMR objects tracking by ISON Vladimir Agapov, Igor Molotov Roscosmos delegation Presentation for the WG1 session.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
SREE DEVI B M.TECH 1st YEAR
Intelligence and Autonomy. Intelligence Intelligence has been defined in different ways, including the abilities for abstract thought, communication,
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Update on results of Molniya-type HEO surveys performed by ISON in 2014 Vladimir Agapov (KIAM RAS) Roscosmos delegation Presentation for the WG1 session.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
The Development of Flight Operations: Improvement of ERAU Cube-Sat’s Ground System Interface and Research of the Satellite’s Orbital Decay Presented by.
AE Review Orbital Mechanics.
CALENDAR YEAR PLAN JANUARY FEBRUARY MARCH APRIL MAY JUNE.
AGILE Data Center Activities C. Pittori (coord), F. Lucarelli, F. Verrecchia (INAF), G. Fanari (TPZ/Serco) 14 th AGILE WS, June 20-21, 2016.
You must call CIRS at to reserve a spot
MSU Solar Physics NSF REU Final Presentation
GLAST Large Area Telescope:
Double Star Progress Meeting #3 Beijing 2 July, 2002.
Space Express Sub-Orbital Mission
Vladimir Agapov, Igor Molotov, Victor Stepanyants
LAUNCH OF GEO STATIONARY SATELLITES
EagleSat-1: Flight Operations
GLAST Large Area Telescope
Update on EO Programmes Italian Space Agency Plenary Agenda Item #30
NASA McMurdo Ground Station Typical Workload
EagleSat 2 – Mission and Development Overview
Tropical cyclones movement
GLAST Large Area Telescope: I&T Test Readiness Review
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Overview Cost to Complete
GLAST Large Area Telescope:
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
2015 January February March April May June July August September
2019 MISSIONS GUEST SCHEDULE
Presentation transcript:

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.1 The AGILE Mission “415 days ahead of GLAST” Dr. Luca Salotti – Mission Director

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.2 Malindi – Fucino – ASDC – PI Team - Guest MLD-2 Ground Station Fucino – SCC/MCC/FDS ASDC/ESRIN Orbcom Intelsat PI Team Guest Industry - RTI

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.3 AGILE in ASI OSU – Observation of the Universe – S. Di Pippo/E. Flamini SMI – Small Mission – F. Viola TST – Ground Segment – R. Ibba

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.4 AGILE Industry - RTI Temporary Consortium Carlo Gavazzi Space S.p.A. Rheinmetall Italia S.p.A. Subco Thales Alenia Space – Italia – S.p.A. Telespazio S.p.A. Prime Contractor: All inclusive, S/C design, building & assembling, P/L assembling, test, launch, operation, data delivery to the ASDC, disposal

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.5 –N. Passes on the Ground Station MLD-2: 5583 (23/05/2008) –N. Passes perturbed or lost: 34 (14 due to station problems) 1438Total SAC off 2736Total Antenna Elevation Brake 3790Total Antenna Elevation Manual System 41625Total Program Track not working 51634Total SAC off 62728Total Fuse on SCR AZ2 F Total Fuse on SCR AZ2 F Total Fuse on SCR AZ2 F Total Fuse on SCR AZ2 F Total Wrong TLE ( Spot2 test) Total Azimut2 SCR Fuse Total Azimut2 SCR Fuse Total CMCS MLD Total LAN MLD-2 –Efficiency: 99.4 % The Ground Station

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.6 –NORAD: A –ID: 013/07 –SEPARATION: Hrs 22 Min Sec (UT) EPOCH : /05/20 23:59: STATE VECTOR J2000 REF SYST ELEMENTS INCLINATION = 2.45° PERIGEE RADIUS = KM APOGEE RADIUS = KM PERIGEE HEIGHT = KM APOGEE HEIGHT = KM –A/M = 0,006 sqm/kg H<500 km 20/2014 –A/M = 0,012 sqm/kg H<500 km 11/2012 The Orbit

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.7 What we have done –23 April 2007: Launch –23 July 2007: End of the Commissioning – SCRB –August – October 2007: Science Verification Phase –November 2007: Δ Commissioning –1 December 2007: Start of the 1 Cycle Observong Time (one year) –19 December 2007: OVR1 –OBH SW 2.07 –PDHU SW V3R3 + Patches –TLC: –TLM: 65 GB –LTP: 30 –TOO: 8 + Trimmings –NCR: 159 whose 18 in orbit –NCR open: 13 (in orbit)

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.8 What is still missing …… what is wrong ! –Test HW Burst Trigger MCAL (will do next week !! - Δ Δ Commissioning ) –New SW PDHU –NCR 143: AC TOP Temperature; –NCR 150: PDHU Hang-up and install of AC SAFE mode; –NCR 152: TMTC OBH-A Hang-up; In orbit reset of OBH-A 01/01/08; –NCR 154: OBH-A math processor instability; We are ready to activate OBH-B in case of progressive degradation; NCR 161: PDHU TC task hang-up;

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.9 MLD-2

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.10 MLD-1

The AGILE Mission 12/06/08 – 5th SCIENCE AGILE WORKSHOPSlide n.11 Welcome in orbit GLAST !! The official GLAST liftoff time was 11/06/08 12:05: p.m. EDT (1605 GMT). The 333rd Delta rocket launch since 1960 The 2nd to fly this year The 136th Delta 2 rocket mission since 1989 The 5th Heavy version of the Delta nautical mile (558 Km) circular orbit inclined 25.6 degrees GLAST M$690 vs. AGILE M€ 55